CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.

Slides:



Advertisements
Similar presentations
Sediment Dynamics, Dredging, and Ecosystem Restoration PIANC Navigation and the Environment New Orleans, LA October 28, 2009 Dr. Donald F. Hayes, PE (Mississippi),
Advertisements

Ash Recovery At Kingston Fossil Plant Kingston, Tennessee
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
Main San Gabriel Basin Management BASIN REPLENISHMENT by Anthony C. Zampiello San Gabriel Valley Water Forum Presented August 28, 2012 SAN GABRIEL VALLEY.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Storage Tanks Impact on Water Quality and Assessing Performance Presentation 3 April 2015.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
CONSOLIDATION OF SOILS and HYDROCOMPACTION
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Buckhorn Disinfection Byproducts / Backwash Disposal Project Board of Directors Meeting June 14, 2012.
Lower Susquehanna River Dam Sediment and Solutions Conowingo Relicensing; LSRWA; MD County Resistance; Solutions; CAC Involvement Thursday November 29.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Photo Placeholder Bloedel Donovan Park Stormwater Retrofit Alternatives and Analysis May 31 st 2013.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Seasonal High Tunnel Systems for Crops Update on interim standard 798 Technical and Program guidance National bulletin: National Bulletin:
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.
Preparing a long term management plan for the future of the Slufter An analysis of the functional, spatial and geotechnical possibilities Roderik Heerema,
ATCHAFALAYA RIVER AND BAYOUS HORSESHOE REACH DISPOSAL ALTERNATIVES REVIEWED.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
David K. Paylor Virginia State Board of Health March 17, 2016.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
What is the Bradshaw model?
Haley & Aldrich, Inc. 1 Strategic Data Use from Collection to Collaboration A Sediment Dredging Case Study Presented by: Ryan J. Scott, PE.
Galveston Bay Bottom Ecosystem System Features
Middle Harbor Redevelopment: Third Party Fill Material
R. E. Randall Center for Dredging Studies
Integrated Channel Maintenance Planning in the Lower Columbia River Innovating Dredged Material Management Planning to incorporate Regional Sediment.
DMMO ANNUAL REVIEW (2004) May 25, 2005.
Louisiana Coastal Area
Beneficial Use of Dredged Material
Sludge Removal Requirements
Tulsa's Risk MAP Program Goals
Big Sky Wastewater Facility Plan Update
Big Sky Wastewater Facility Plan Update
Southern Maine Dredge Purchase Feasibility Study
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY

OBJECTIVES  Develop short-term dredging plan for the next 1 to 3 years for the placement of dredged material.  Development of long-term dredging plan for the maintenance of the project area and long-term use of the CDFs.

STUDY AREA  Calcasieu River and Pass, Louisiana  Specific area of study within the river and pass is the reach from river mile 5.0 to 34.0  4 million yards of sediment is dredged from sub-reaches of this area on an annual basis  Mile 5 to 14 and Mile 14 to 28 are dredged on alternating years and Mile 28 to 34 is dredged once every 5 years

SEDIMENT MANAGEMENT PLAN  Maximize volumetric disposal capacity  Dewater and densify fine-grain material to the greatest extent feasible  Reclaim and remove usable material for productive use and/or beneficially use dredged material  Maintain acceptable water quality of the discharged effluent (401 Water Quality Certification)

OUTLINE FOR SHORT-TERM MANAGEMENT PLAN  Determine capacities of selected existing CDFs  Run settling column test and consolidation tests on a representative sample(s) and input data into the SETTLE model (and PSDDF if needed) to determine short term CDF volume requirements  Establish a plan to develop critical CDF volume

LONG-TERM MANAGEMENT PLAN  Determine present diked surface areas and present fill surface elevations for each existing CDF  Establish projected dredging volume by reach or channel mile (from analysis of dredging history)  Determine geotechnical conditions of the subsurface along the present dike alignments of each existing CDF and analyze each disposal area to determine maximum dike height that could be constructed

LONG-TERM MANAGEMENT PLAN (CONT’D)  NOD Geotechnical branch will establish historical sediment characterization data (grain size, Atterberg Limits, in-situ water contents, and sediment chemistry from analysis of available historical sampling which includes volume of sediment as well as in-situ properties, and may require sampling for characterization to fill data gaps) and forward this information to EL

LONG-TERM MANAGEMENT PLAN (CONT’D)  Establish constraints on site use during filling to include: minimum ponding debths and areas for effluent quality/maximum expected dredge sizes/limits on pumping distances, etc.  Project fill rates for a range of placement scenarios to determine optimum sequencing  Evaluate beneficial use options, project capacities, and schedule

SAFE DIKE HIEGHT

REQUIREMENTS  The total volume of material to be dredged from the Calcasieu River and Pass in the short term is 15,000,000 yd 3.  The upper reach has a total of 6.5MCY, the middle reach has a total of 4.5 MCY,and the lower reach has a total of 4.0 MCY.  Depending on the size dredge used for the removal of the material, 27 or 30 inch, the upper reach requires a storage volume of 7.5 to 7.75 MCY.

REQUIREMENTS (CONT’D)  The middle reach requires a storage area between 4.5 and 9.8 MCY.  The lower reach requires a storage volume of between 4.0 and 9.0 MCY.  The total area needed for storage between miles 5 and 36 is between 16.0 and 26.5 MCY

CAPACITIES  Three fill elevations were used to determine the present storage capacities of the CDFs along the Calcasieu River.  The 10-foot fill elevation has a storage capacity of approximately 5.6 MCY,  The 12-foot fill elevation has a storage capacity of approximately 6.8 MCY, and  The 14-foot fill elevation has a storage capacity of approximately 7.6 MCY