MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.

Slides:



Advertisements
Similar presentations
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Advertisements

1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Collaboration Board Summary K. Long, 27 June, 2015.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
Request to join MICE collaboration from MOMENT (IHEP and Sichuan Uni.) Jingyu Tang Institute of High Energy Physics, CAS MICE Collaboration Board Meeting.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
List of Decisions #Decision for the Board 1 Does the Board agree to its composition? The Board requested that its composition be considered “proposed”
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
5 Essentials for Meetings Planning – clear objectives, writing agenda, key personnel invited Pre-notification – time & location of meeting & agenda published.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
MICE CM38 Alain Blondel CB report 1 Report from the MICE collaboration board.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionisation Cooling Experiment Overview
K. Long Imperial College London/STFC
Bulk production of Monte Carlo
MICE Computing and Software
Status of the MICE Construction Project
LAS Diagnostic Timetable April May June July August
Bulk production of Monte Carlo
CMS Centres Worldwide CMS Centres Worldwide
Collaboration Board Report
Software Session Introduction
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
S4 will be a “big” Collaboration:
Overview of CLAS12 Calibration
Report on EUCARD WP6: MICE Transnational Access (TA)
Francesco Forti University and INFN, Pisa
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
A High Intensity Neutrino Oscillation Facility in Europe
Region 8 Meeting Harvey Solomon, MD
Detector Proto-Technical board Sep 30, 2010
Step 3. Initiate Proposal
Presentation transcript:

MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel

MICE CM41 – CB summary Alain Blondel

5 absent, 5 proxys, 3 on phone Quorum OK Minutes approved agenda adopted, no A.o.b. status was given submission of NSF request submission of EU-ITN proposal future: funding request for UK completion of MICE

MICE CM41 – CB summary Alain Blondel 4

5 From Spokesperson report 1. rebaselining of experiment was supported at CM40 and supported by RSLR, MPB, FAC 2. on personnel: Paul Smith left collaboration Paul has done outstanding work for target (as PhD) and MICE online! David Adey got job at Fermilab David has contributed greatly to tracker! Yordan agreed to take online group leadership, (CB endorsed) but need for a second DAQ expert has been clearly identified. 3. Progress and completion of Step IV installation Huge progress. For external groups (not RAL) it is essential to prepare well ahead -- connect with project manager (Preece) -- get into ‘job card system’ -- encourage MICE members to be more present at RAL to get acquainted Mock data run reveals need of presence of collaborators at RAL CB took note

MICE CM41 – CB summary Alain Blondel 6 OPERATIONS planned data taking -- Shifter sign up on CHEESE is GOOD (not fully complete though) see later slides : 62 potential shifters need ~18 shifts per person over ~1 year of data taking. -- may allow running experiment 24/7. CB enthusiastic to take data! Would like to see a plan that ensures maximal use of resources and time in terms of quality of measurements. It was agreed that this would be circulated to CB asap. C. Rogers will organize a meeting in March to gather the factors that will determine the run plan Produce draft run plan for collaboration (and then the MPB etc...) From Spokesperson report (II)

MICE CM41 – CB summary Alain Blondel 7 From Spokesperson report (III) Steps being taken to revise the MICE constitution (MIPO, MEMO; moving to operations etc..) J. Dainton is taking lead on this, contacts with STFC to raise profile of MICE

MICE CM41 – CB summary Alain Blondel Hall work Detailed schedule of installation is being build Interaction between many teams of mechanical and electrical During the PRY plate installation long working days will be in action Heavy equipment being installed We must be safe in the hall and so general walk about will not be allowed A job card system has been introduced Any work for the hall must be put through the job card system, either mechanical or electrical An online program is being used at the moment with a small group to test the system Will be rolled out to a wider team soon Available in any browser IOS app 8 From Project manager report (R. Preece)

MICE CM41 – CB summary Alain Blondel 9 S. Boyd presented shift sign up statistics. Default is: sign up in block of 5 shifts Shifts will be allocated to institutes according to the number of people associated with that institute All MICE members must do at least half of their personal shift allocation All institutional shift loads must be met in full if not  don’t sign papers

MICE CM41 – CB summary Alain Blondel 10 New institutes in MICE

MICE CM41 – CB summary Alain Blondel 11 Institute of Physics, University of Belgrade Two Senior Research Associates One Research Associate Two PhD students Dr. Vladimir Udovicic, Senior Research Associate Head of the Low Background Laboratory Dr. Dimitrije Maletic, Senior Research Associate, Spokesperson for the group Dr. Dejan Jokovic, Research Associate MSc Mihailo Savic, PhD student MSc Nikola Veselionovic, PhD student -Detector simulation and Analysis -e.g. MC studies and validations -Data processing -Working on experiment software Event display as part of Online analysis tools.

MICE CM41 – CB summary Alain Blondel 12 Request to join MICE collaboration from MOMENT (IHEP and Sichuan Uni.) a muon decay neutrino beam! Jingyu Tang (Institute of High Energy Physics) Prof. Zhihui Li (Sichuan U.) + PhD student shifts, beam dynamics modeling, data analysis, paper writing. possibly add more persons in the future.

MICE CM41 – CB summary Alain Blondel 13 The Collaboration Board Unanimously welcomed -- the Institute of Physics, University of Belgrade -- The Institute of Hight Energy Physics, Beijing and Sichuan University in the MICE collaboration