Protection of Power Systems

Slides:



Advertisements
Similar presentations
Electrical Installation
Advertisements

Fuses vs Circuit Breakers for Low Voltage Applications
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Distributed Intelligence Provides Self-Healing for the Grid
MOLDED CASE CIRCUIT BREAKER BASICS
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
RT3b – André Smit, Siemens USA
Tap Conductor Rules.
Power System Analysis/ Power System 1 EEE 4113/ EEE 3131
Fault Hunting Using Three-Phase Reclosers Michael S. CostaJerome V. JoskenDennis A. Walder Eversource EnergyUC SynergeticEaton IEEE Rural Electric Power.
Power System Protection
Specification of CTs: CTs are defined in terms of rated burden, accuracy class and accuracy limit. Saturated values of rated burden are: 2.5, 5, 7.5, 10,
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
Chapter 7 SYSTEM PROTECTION
Interconnect Protection of Dispersed Generators
THE ELECTRIC SUB STATION
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
OVER CURRENT RELAY The relay has two settings. These are the time setting and the plug setting. The time setting decides the operating time of the relay.
Transformer Taking the ratio of the two equations
TESTING AND COMMISIONING
© ABB PTMV - 1, ABB Overhead Distribution Systems.
CLEMSON UNIVERSITY DG CONFERENCE UPDATE ON THE CURRENT STATUS OF DG INTERCONNECTION PROTECTION WHAT IEEE 1547 DOESN’T TELL YOU ABOUT INTERCONNECTION PROTECTION.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Announcements Read Chapters 10 and 11
1 Distributed Generation and Power Quality-Continued.
POWER HOUSE.
SERVICE ENTRANCE EQUIPMENT
Suggestion on How to Use
Main contacts closed – RED Colour with ON
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
Protection of Power Systems 1. Introduction. Faults A fault is an inadvertent, accidental connection, and flashover between the phase wires or from the.
ECE 498HZ: Power Distribution System Analysis
Grounded Wye-Delta Transformer Bank Backfeed Short-Circuit Currents W. H. Kersting & Wayne Carr Milsoft Utility Solutions.
ELECTRICAL INSTRUMENTS ( service and utilization )
AUTOMATIC CIRCUIT RECLOSER
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Chapter 4 Electrical Systems and Protection Chapter 4 Electrical Systems and Protection.
Protection and Relay Schemes
Sub Station.
Announcements Please read Chapters 9, 10 and 11 HW 8 quiz today
Protection of Power Systems
Announcements Please read Chapters 9, 10 and 11
Overhead Distribution Systems
Interconnect Protection of Dispersed Generators
Advanced Fuse-Saving Techniques
Power Generation and Distribution
Protection of Power Systems
Smitty’s Two Minute Drill Overcurrent Protection
GROUND-FAULT GROUND-CHECK MONITOR
ECE 476 POWER SYSTEM ANALYSIS
Basics of electrical engineering
Selective Coordination
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Chapter 7 System Protection
Distributed Generation (DG) Modeling Criteria
Engineering Project Cable Management.
Protective Relaying Conference
UNIT II APPARATUS PROTECTION.
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Power Plants By: Stephanie Mercer.
Agenda Introduction of Protective Relays
EET 323 – Electrical System Design Lecture 9: Grounding
Power System Protective Relaying-Part One
EUS 260 Capstone Project.
Review of Distribution Network Protection
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
Substation Equipment's
Long Island Interconnection Working Group Meeting August 22, 2019
Fuses vs Circuit Breakers for Low Voltage Applications
Presentation transcript:

Protection of Power Systems 6. Reclosers and Fuses

Automatic circuit reclosers are commonly used for distribution circuit protection. A recloser is a self-controlled device for automatically interrupting and reclosing an ac circuit with a preset sequence of openings and reclosures. Unlike circuit breakers, which have separate relays to control breaker opening and reclosing, reclosers have built-in controls. More than 80% of faults on overhead distribution circuits are temporary, caused by tree limb contact, by animal interference, by wind bringing bare conductors in contact, or by lightning.

The automatic tripping-reclosing sequence of reclosers clears these temporary faults and restores service with only momentary outages, thereby significantly improving customer service. A disadvantage of reclosers is the increased hazard when a circuit is physically contacted by people—for example, in the case of a broken conductor at ground level that remains energized. Also, reclosing should be locked out during live-line maintenance by utility personnel.

Figure 10.18 shows a common protection scheme for radial distribution circuits utilizing fuses, reclosers, and time-delay overcurrent relays. Data for the 13.8-kV feeder in this figure is given in Table 10.7.

There are three load taps protected by fuses. The recloser ahead of the fuses is set to open and reclose for faults up to and beyond the fuses. For temporary faults the recloser can be set for one or more instantaneous or time-delayed trips and reclosures in order to clear the faults and restore service. If faults persist, the fuses operate for faults to their right (downstream), or the recloser opens after time delay and locks out for faults between the recloser and fuses.

Separate time delay overcurrent phase and ground relays open the substation breaker after multiple reclosures of the recloser.

Coordination of the fuses, recloser, and time-delay overcurrent relays is shown via the time-current curves in Figure 10.19. Type T (slow) fuses are selected because their time-current characteristics coordinate well with reclosers. The fuses are selected on the basis of maximum loads served from the taps. A 65 T fuse is selected for the bus 1 tap, which has a 60-A maximum load current, and 100 T is selected for the bus 2 and 3 taps, which have 95-A maximum load currents.

The fuses should also have a rated voltage larger than the maximum bus voltage and an interrupting current rating larger than the maximum asymmetrical fault current at the fuse location. Type T fuses with voltage ratings of 15 kV and interrupting current ratings of 10 kA and higher are standard. Standard reclosers have minimum trip ratings of 50, 70, 100, 140, 200, 280, 400, 560, 800, 1120, and 1600 A, with voltage ratings up to 38 kV and maximum interrupting currents up to 16 kA.

A minimum trip rating of 200–250% of maximum load current is typically selected for the phases, in order to override cold load pickup with a safety factor. The minimum trip rating of the ground unit is typically set at maximum load and should be higher than the maximum allowable load unbalance. For the recloser in Figure 10.18, which carries a 250-A maximum load, minimum trip ratings of 560 A for each phase and 280 A for the ground unit are selected.

A popular operation sequence for reclosers is two fast operations, without intentional time delay, followed by two delayed operations. The fast operations allow temporary faults to self-clear, whereas the delayed operations allow downstream fuses to clear permanent faults. Note that the time-current curves of the fast recloser lie below the fuse curves in Figure 10.19, such that the recloser opens before the fuses melt. The fuse curves lie below the delayed recloser curves, such that the fuses clear before the recloser opens.

The recloser is typically programmed to reclose ½ s after the first fast trip, 2 s after the second fast trip, and 5–10 s after a delayed trip. Time-delay overcurrent relays with an extremely inverse characteristic coordinate with both reclosers and type T fuses. A 300 :5 CT ratio is selected to give a secondary current of 250(5/300) = 4.71 A at maximum load. Relay settings are selected to allow the recloser to operate effectively to clear faults before relay operation.

A current tap setting of 9 A is selected for the CO-11 phase relays so that minimum pickup exceeds twice the maximum load. A time-dial setting of 2 is selected so that the delayed recloser trips at least 0.2 s before the relay. The ground relay is set with a current tap setting of 4 A and a time-dial setting of 1.