PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.

Slides:



Advertisements
Similar presentations
Mn/DOT Office of Materials and Road Research Gene Skok (UofM) Shongtao Dai (MnDOT) 12 th Minnesota Pavement Conference February 14, 2008 MnPavement Rehabilitation.
Advertisements

Sub-Grade Preparation-Equipment Caterpillar Paving Products
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah Project Duration September.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Pavement Preservation and Maintenance Private Roads Maintenance Workshop August 18, 2012.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Pavement Design. Overview Department Network Materials Asphalt Pavement Failure and Distress Modes Pavement Design Important Considerations for Prime.
Pavement Design CE 453 Lecture 28.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
The Future is Thin: Surface Mix Experience and Performance in the City of Ottawa Steve Goodman, M.Eng., P.Eng. Senior Pavement Engineer, City of Ottawa.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PCC Overlays of HMA Pavements
HMA Pavement Recycling and Reconstruction
Session 3-6 HMA Overlays.
Flexible Pavement Thickness Design / AASHTO Method
Chapter 5 Patching and Edge Repair
Pavement Maintenance II
Pavement Distresses Flexible Pavement
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Analysis and Design
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Pavement Preservation Preventive Maintenance
Concrete Pavements The Right Tool for The Right Job.
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Using Reflective Crack Interlayer-
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
TRANSPORTATION ENGINEERING-II
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
At Auburn University National Center for Asphalt Technology Accelerated Pavement Testing Facilities “APT”
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Alabama Asphalt Pavement Association
PPRA Fall Meeting, 2014 “Extending the Nation’s Road Maintenance Dollars” Experience with Emulsion-Stabilized FDR on Lower Volume Roadways in Wisconsin:
Roadway Pavement Management Plan
AN-Najah National University AN-Najah National University
City of Abilene Pavement Condition Survey 2017 Results and Discussion
2017 Pavement Conference May 24, 2017 Dan Wegman
Multi-Year Programming and Predictive Modelling
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Presenters: Sumon Roy1 and Badrul Ahsan1
HIGHWAY MAINTENANCE Failures in flexible pavement.
Pavement condition index calculation
Update on the current APT Project in Texas
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
Consequences of Delayed Maintenance of Pavement Networks
Introduction to Pavement Design
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Performance Assessment of 100% Recycled Hot Mix Asphalt
Pavement Maintenance and Microsurfacing
Colorado State University
Pavement Structural Analysis
Pavement Overlay Design
NRRA Recycling Economic & Environmental Benefits
NRRA Pavement Workshop 2019
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015

Pavement basics Pavement preservation principles Project selection Pavement evaluation and testing Cost analysis and life cycle cost benefits Quality control and quality assurance PRESENTATION GOALS

PAVEMENT BASICS

Pavement Design Loading ESALS = Traffic Index or TI PAVEMENT BASICS Soils (R-value) GE = (TI)(100-R)

Pavement Deterioration Cycle PAVEMENT BASICS

Asphalt concrete deteriorates in two ways: Pavement Deterioration Oxidizing effects of sun and water Fatigue from heavy wheel loads PAVEMENT BASICS

The Impact of Sun and Water PAVEMENT BASICS

The Impact of Heavy Loads PAVEMENT BASICS

What is a Traffic Index? The projected equivalent single axle loading that a pavement will experience over its design life PAVEMENT BASICS

ESAL = (Axle Wt / 18,000 lbs) 4.2 Equivalent Single Axle Load PAVEMENT BASICS

Traffic Index vs. ESALs PAVEMENT BASICS

Alligator cracking Block cracking Distortions Longitudinal / transverse cracking Patches / utility cuts Rutting / depressions Weathering / raveling Common Pavement Distresses PAVEMENT BASICS

Block Cracking Alligator Cracking Transverse or Longitudinal Cracking Weathering or Raveling Common Pavement Distresses PAVEMENT BASICS

PAVEMENT PRESERVATION PRINCIPLES

Applying the RIGHT TREATMENT to the RIGHT PAVEMENT at the RIGHT TIME using the RIGHT MATERIALS PAVEMENT PRESERVATION PRINCIPLES

Pavement Preservation Timing PAVEMENT PRESERVATION PRINCIPLES

Best-First “Top Down” Management: focuses maintenance and rehabilitation on the best streets in the system. Interim procedure. Worst-First “Bottom Up” Management: focuses maintenance and rehabilitation on the worst streets in the system. Interim procedure. Critical-Point Management: focuses maintenance and rehabilitation on streets above rather than below a critical PCI. Most economical in the long run. Good Pavement Management PAVEMENT PRESERVATION PRINCIPLES

Pavement Condition vs. Maintenance / Rehabilitation Cost PAVEMENT PRESERVATION PRINCIPLES

Pavement Condition vs. Maintenance / Rehabilitation Cost PAVEMENT PRESERVATION PRINCIPLES

PROJECT SELECTION

Time of year Proximity to schools Day or night Traffic control needs Project Timing

Selecting the Right Streets PROJECT SELECTION PMS data Multi-year plan Visual conditions Grouping streets Public input Staff input Budget Utility coordination Grants Drainage ADA

Selecting the Right Treatment Visually dividing your street list Project Street ListMaintenance StreetsRehabilitation Streets Environmental determination Extent of loading failures Extent of ADA improvements Physical testing to determine structural adequacy If adequate, consider maintenance option PROJECT SELECTION

PAVEMENT EVALUATION AND TESTING

Rehabilitation Streets Design controlled by Reflective Cracking Structural Adequacy

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

  N Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Deflection Testing and Coring PAVEMENT EVALUATION AND TESTING

Resistance R-Value Testing PAVEMENT EVALUATION AND TESTING

R-Value Design PAVEMENT EVALUATION AND TESTING

Design Considerations Previous overlays / existing crown Road improvements Shallow utilities PAVEMENT EVALUATION AND TESTING

Design Considerations for Sustainable Options Cold-in-place recycling (CIR) Pulverization and resurfacing / full-depth reclamation (FDR) Milling and resurfacing requirements PAVEMENT EVALUATION AND TESTING

Cold In-place Recycling Pavement must be structurally adequate. Pavement must have a minimum HMA layer thickness. Pavement must have a minimum existing base of 10 inches if R-value is less than 30. CIR depth cannot extend to base layer. Why? 1.75 to 2.50-inch cap is not sufficient if a pavement is structurally deficient (may not meet HMA design). A minimum depth ensures good CIR layer (3-4 inches). A minimum base thickness ensures heavy equipment doesn’t destabilize the grade.

Pulverization and Resurfacing/FDR PAVEMENT EVALUATION AND TESTING The preferred Traffic Index (TI) should be less than 7.0. Pavement must have a minimum aggregate base of 12 inches or an R-value less than 30. Pavement must have a minimum aggregate base of 9 inches or an R-value greater than 30. Check crown. Why? Typical build-up is not feasible over 2 to 3 inches unless there are no vertical constraints. Pulverizing, grading and compacting will destabilize a grade if the R-value and corresponding base thickness do not meet minimums. The intent of pulverizing is to create a new aggregate base section. Generally, limiting the off-haul of the pulverized base is important to ensure a sufficient structural section.

Milling and Resurfacing PAVEMENT EVALUATION AND TESTING Pavement must be structurally adequate or only slightly deficient. Pavement must have a minimum existing HMA depth of 5 inches. Why? Milling reduces the in-place structural capacity and requires some replacement value. If the pavement is structurally deficient, the mill depth typically becomes excessive. A minimum layer thickness is necessary to ensure milling equipment and loaded trucks do not break through the existing HMA.

COST ANALYSIS LIFE CYCLE COST ANALYSIS (LCCA)

COST ANALYSIS

Develop and Evaluate Recommendations Short-term pavement rehabilitation options These options are not available for this street because of structural deficiencies and/or pavement cracking condition. COST ANALYSIS

Develop and Evaluate Recommendations Long-term pavement rehabilitation options Overlay Option: RHMA For option 1, we recommend 4-inch digouts for base failures, placing a 1/2 inch HMA leveling course and a 1-3/4 inch RHMA overlay. Estimated Cost: $241,000Estimated Life Expectancy: Years Overlay Option: RHMA For option 1, we recommend 4-inch digouts for base failures, placing a 1/2 inch HMA leveling course and a 1-3/4 inch RHMA overlay. Estimated Cost: $241,000Estimated Life Expectancy: Years

COST ANALYSIS Develop and Evaluate Recommendations Long-term pavement rehabilitation options Overlay Option: HMA An overlay using HMA is not recommended because the 3-3/4 inch structural requirement exceeds the 3-1/2 inch maximum overlay that is considered feasible to meet geometric constraints. Overlay Option: HMA An overlay using HMA is not recommended because the 3-3/4 inch structural requirement exceeds the 3-1/2 inch maximum overlay that is considered feasible to meet geometric constraints.

COST ANALYSIS Develop and Evaluate Recommendations Long-term pavement maintenance options Recycle and Mill and Replace Options These options are not available for this street because of the structural deficiencies and thin pavement layer. Recycle and Mill and Replace Options These options are not available for this street because of the structural deficiencies and thin pavement layer.

COST ANALYSIS Develop and Evaluate Recommendations Long-term pavement rehabilitation options Reconstruction Option 1 For option 1, we recommend removing the pavement to a depth of 10-1/2 inches and placing 10-1/2 inches of new HMA. The HMA should be placed in 4 lifts. Estimated Cost: $631,000 Estimated Life Expectancy: 20 Years Reconstruction Option 1 For option 1, we recommend removing the pavement to a depth of 10-1/2 inches and placing 10-1/2 inches of new HMA. The HMA should be placed in 4 lifts. Estimated Cost: $631,000 Estimated Life Expectancy: 20 Years

COST ANALYSIS Develop and Evaluate Recommendations Long-term pavement rehabilitation options Reconstruction Option 2 For option 2, we recommend removing 4 inches of the existing structure, lime treating the native soil and aggregate base to a depth of 13 inches and placing 4 inches of new HMA in 2 lifts. Estimated Cost: $292,000 Estimated Life Expectancy: 20 Years Reconstruction Option 2 For option 2, we recommend removing 4 inches of the existing structure, lime treating the native soil and aggregate base to a depth of 13 inches and placing 4 inches of new HMA in 2 lifts. Estimated Cost: $292,000 Estimated Life Expectancy: 20 Years

Develop and Evaluate Recommendations COST ANALYSIS

QUALITY CONTROL AND QUALITY ASSURANCE

QC / QA Vheem Mix vs. Superpave Mix

QC / QA Caltrans Section 39 (2010) Method Standard QC/QA

Mix Design Submittals JMF – 3511, 3512 and 3513 Production start-up

QC / QA Importance of Compaction

QUESTIONS?