SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
of LFD Compensation Study S1 Global Cryomodule
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Lorentz force detuning measurements on the CEA cavity
1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Tom Powers LLRF Systems for Next Generation Light Sources LLRF Workshop October 2011 Authored by Jefferson Science Associates, LLC under U.S. DOE.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Challenges of PIP-II Warren Schappert Microphonics Workshop 8 Octobe 2015.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
LFD and Microphonics Suppression for PIP-II Warren Schappert April 15, 2014.
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Superconducting RF: Resonance Control Presented by Yuriy Pischalnikov for W. Schappert, Y.Pischalnikov, J.Holzbauer PIP-II Machine Advisory Committee 15.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Current Status of PIP-II Resonance Control W. Schappert.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
RF Issues with Configuration Options Project X retreat Nov 2, 2010 Brian Chase, Julien Branlard, Gustavo Cancelo, Warren Schappert, Yuriy Pischalnikov.
ESS LLRF and Beam Interaction
Cost Optimization Models for SRF Linacs
Experience with high loaded Q cavity operation at HZB
Test of the dressed spoke cavity
Overview and System Design for ESS LLRF Systems
Yuriy Pischalnikov Warren Schappert (FNAL)
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
ILC LLRF Status Ruben Carcagno, Brian Chase
LCLS II SRF Cavity Tuner (developed by FNAL)
Tuner system Zhenghui MI 2017/01/17
Mechanical setups Lorentz Force Detuning System Setup
Cavity resonance control
CW Operation of XFEL Modules
High gradients in TESLA nine-cell cavities
Resonance Control for Narrow-Bandwidth, SRF Applications
First High Power Test of the ESS Double Spoke Cavity package
TTC meeting, Milano Global Design Effort
Presentation transcript:

SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June, 2013

Microphonics for CW SRF machine – dF/dP: cryo-plant OR/AND cavity system (cavity/HeVessel/tuner) design (see T. Khabiboulline – FNAL’s design of 650MHz &325MHz design); – External vibration: design of cryo-module & vacuum/cryo infrastructure around machine; – Active compensation of the microphonics /challenges/: Accuracy of detuning measurements Accuracy of detuning measurements Slow feed-back compensation (slow dF/dP compensation ) Slow feed-back compensation (slow dF/dP compensation ) Fast feed-back compensation (external vibration; mechanical model of cavity) Fast feed-back compensation (external vibration; mechanical model of cavity) Long Term stability of active compensation (one trip/per cavity/500Hours operation) Long Term stability of active compensation (one trip/per cavity/500Hours operation) Tuners coarse(slow)& fine(fast) – Design & Reliabilities (piezo reliability)

Active control of SRF cavities resonance operation mode algorithm CW RF pulse Feed-forward Slow Feedback (He pressure fluctuation & cavities dF/dP) Fast Feedback (vibrations)

Adaptive Feed-forward algorithm for LFD compensation for 1-10ms (and longer) pulse. Accurate measurements of the detuning due to Lorentz force Accurate characterization of the detuning response to piezo impulses at various delays Use least-squares to determine the combination of piezo impulses required to cancel out the Lorentz force detuning Lorentz Force Detuning Before and After Compensation for one 9- cell cavity equipped with blade tuner 10ms RF pulse 1ms RF pulse Flat top

Adaptive pulse mode CM1 NML (He pressure & dF/dp) Frequency stability of the CM1 cavities over the course of 12 hours with non-adaptive LFD compensation. The cavity resonance frequencies can drift by several tens of Hz. 20 hours Fermilab CM1 tuning stability with adaptive feed- forward LFD compensation ON. CM1 operated at 5Hz repetition rate. Adaptive feed forward (adjusting piezo bias for next RF pulse) can limit the drift to ~1 Hz.

Slow Feed-back to compensate microphonics (as a results of He pressure fluctuation ( and cavity’s dF/P ~140Hz/torr )  =0.45Hz  =1.3Hz Half Bandwith:1-2Hz Active Compensation of Microphonics in the SSR1 Cavity. The green curve shows the pressure of the helium bath. The blue curve shows cavity detuning. The cavity was operating with a bandwidth of ~1.5Hz at the temperature 4.5K and Eacc=5MV/m. FPGA fed  f (detuning) back to fast tuner. Simple simulations indicated that limit may be 100kHz ADC Upgraded hardware: Used ADC14-bit, 100MS/s SSR1 cavity was operated with bandwidth of ~102Hz Goal was to see ultimate level of compensation

CC2 (analog phase detector) & filter bank Fast Single Narrow Resonance (F=92Hz; T=2K) Active damping reduces the vibration at this frequency by 15 dB. Frequency(Hz) Time (s) Amplitude (FFT) Time (s) The Piezo tuner actively damped vibrations induced by external sources. An IIR filter bank was used to isolate and reverse the phase of the particular spectral line. The phase reversed signal then fed back to the piezo tuner. 9cell 1.3GHz “tesla style cavity (CC2) Now is part of FNAL’s NML photo- injector

B Directional coupler Detuning calculation P probe P forw P refl LLRF  f(detuning) Piezo Piezo stimulus FPGA /algorithm /Piezo_amp Cavity mech.model 1.Calculate detuning from RF signals using the same detuning formula used for LFD compensation a)Directional Coupler issues: Contamination of P forw with P refl b)Quality of RF receivers and digital filtering  contamination of our baseband signal 2.Cavity’s mechanical model to feed into FPGA system Double structure distribution… 0.5Hz resolution instead of 0.18Hz Assumption (likely only partially true) that forward tail is due exclusively to cross-contamination by reflected signal. Correction reduces the amplitude and phase variation and forward signal from 5-15% to a few percent. 1(b) 1(a) Correction used at FNAL for RF-pulse mode LFD compensation Plans at FNAL related to microphonics work Corrected Uncorrected phase magnitude

Measuring the Mechanical Transfer Function in Pulsed-Mode (opportunity to do it at S1-Global) Excite the piezo with a series of impulses and sweep the impulse-to-RF delay – Equivalent to measuring the piezo- to-detuning transfer function using CW Delay-Scan used to determine optimal waveform KEK cavity Blade/FNAL DESY/Saclay

CM1 Cavities (#5&#6 of NML cryomodule#1) measurements and 20-Pole MSSR Model

Summary FNAL focus is changed from RF-pulse machine (ILC) on CW machine (Project X) Development of expertise in active compensation of the mircophonics is important goal for FNAL’s team We are interesting to collaborate with experts in SRF community: – exchanges ideas; software codes; joint work at existing facilities; tuner’s reliabilities study; etc…

Additional Slides

Fast Single Wide Resonance (F=155Hz; T=2K)

Measuring LFD Complex envelope of the probe signal described by 1 st order ODE Rearrange terms to extract the width and the dynamic detuning from the probe and forward IF signals

Long Term Stability