Overview New Jersey communities and sewage treatment plants with combined sewer overflows (CSOs) have new permits with a series of new requirements. New.

Slides:



Advertisements
Similar presentations
Fayette County Wastewater Management Plan October 6, 2005.
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
2010 Draft Municipal Budget
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Integrating Adaptation into Municipal Plans and Programs Beth Gibbons, GLAA-C Project Manager.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
COOPERATIVE Border To Border Broadband Conference February 5 th, 2014 Fiber to Homes, Farms and Businesses.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
March 29, 2012 Water Resources: Utilizing Technology, Partnerships and Nature Michele N. Siekerka, Esq. Assistant Commissioner Water Resource Management.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
ABSTRACT Through regulations and penalties, the Environmental Protection Agency encourages cities to prevent the contamination of rivers, streams, and.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Preventing Nonpoint Source Pollution
How do local governments get their money and what is it used for?
Tower Renewal. Toronto Towers Concrete slab, multi-residential apartment buildings Built between 1950’s and 1980’s 8 stories or more 2.
S A V E - R - B A Y North Bay Watershed Association September 11, 2009 Lateral Program Update Seeking to Resolve a Difficult Public / Private.
How do local governments get their money and what is it used for?
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Energy, Utilities, and Telecommunication Summer Study Committee Meeting September 2, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of.
Jennifer Wislocki, Board of Finance Thomas E. Marsh, First Selectman Pamela Christman, Chester Elementary School 10/20/20151.
Connecticut Department of Energy and Environmental Protection.
Municipal Finance and Governance: Tools to Affect Land Use Decisions Enid Slack Institute on Municipal Finance and Governance University of Toronto Presentation.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Municipal Services and How We Pay for Them Adapted from a Presentation Prepared for Local Government Week by AMCTO (Association of Municipal Managers,
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Our old plumbing As long as the toilet flushes and the shower drains, we rarely think about our sewers. But in parts of our city, what we flush sometimes.
Our old plumbing As long as the toilet flushes and the shower drains, we rarely think about our sewers. But in parts of our city, what we flush sometimes.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
Draft Public Involvement Plan for: Chehalis River Basin Flood District Formation August 19, 2010.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
© Amec Foster Wheeler Business Analysis for Canal Management Principles, Experience and Key Decision Points.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Land Use & Government Policy. What is Land Use? Land use -The way in which humans use the earth's surface. Rural- sparsely settled places away from the.
Comprehensive Thinking and Planning
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Lyman Welch Water Quality Program Director
Top 10 Frequently Asked Annexation Questions.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
National Academy of Public Administration
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Stakeholder consultations
Manchester’s CSO Program: A Look Behind and a Look Ahead
Local Government Engagement and Communication Strategy
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
Using Energy Conservation, Green Energy, Green Infrastructure and EPA’s CREAT Program, to Reduce Carbon Footprint & Vulnerability to Climate Change Andrew.
Our city’s plumbing problem
[OUR CITY NAME]’S OLD SEWERS
OUR CITY’S PLUMBING PROBLEM
Capital Improvement Plans
Why Sewage-Free Streets and Rivers
Fixing Our City’s Old Sewers
“Balancing Gray and Green Infrastructure”
Presentation transcript:

Overview New Jersey communities and sewage treatment plants with combined sewer overflows (CSOs) have new permits with a series of new requirements. New Jersey communities can learn from hundreds of others nationwide that have already taken major steps toward ending combined sewer overflows. The state Department of Environmental Protection (NJDEP) has designed this permit to allow communities a lot of flexibility in choosing what works for them. This fact- sheet is intended to explain why this permit is different and what new actions are required. What has already been done? Communities and wastewater treatment plants throughout New Jersey already have taken steps toward reducing their overflows. This includes installing grates, netting chambers and other infrastructure to reduce the amount of trash that goes into the sewer and eventually out into the waterways. In addition, communities have invested in upgrades that have eliminated 64 CSO outfalls. What does the new permit require? New Jersey’s new CSO permits are intended to meet the requirements of the federal Clean Water Act and the national CSO Policy by reducing or eliminating the state’s remaining 217 CSO outfalls. The permit has two major components. The first part is continuing work on Nine Minimum Controls, which communities already have been required to do. The second part is following the steps toward developing a Long Term Control Plan (LTCP). (The permits themselves, and a host of explanatory and supporting information, can be found on the NJDEP website: About the Long Term Control Plan The Long Term Control Plan that CSO permit holders must develop will evaluate a range of alternatives to address CSOs. Public input and cost- effectiveness of the alternatives are two of the many factors permit holders will use to decide which alternatives to implement.. Permit- holders must take several major steps toward developing a comprehensive plan for their sewer system including the following: Develop a detailed understanding, also known as a characterization, of the sewer system. Model how rain and snow melt affect the flows and overflows. Identify potential solutions that would reduce or stop overflows. These include gray infrastructure and green infrastructure. Engage residents, community groups, and business owners about what solutions they suggest and support. Evaluate which options will have the most impact at the lowest cost. This can include considering the additional benefits that certain options, such as green infrastructure, may have on the overall community. Select the options that work best and incorporate them into the long- term control plan, which includes a timeline for construction. Implement the plan over coming years. Verify, after construction, that the new controls are working as planned. By not following the schedule in their permit, communities and utilities run the risk of government enforcement action or a third-party lawsuit, which could result in the loss of flexibility regarding CSO solutions and the timeline for implementing them. For more detailed information regarding the new permit, visit For more information on innovative solutions, visit JerseyWaterWorks.org This is how a combined sewer system works when it’s dry and when it’s raining or snowing. Graphic courtesy of U.S. Environmental Protection Agency. What is a Combined Sewer Overflow? Combined sewer systems, which carry both sewage and stormwater, were considered cutting-edge technology when they were built in the late 1800s and early 1900s. But when it rains, the stormwater can overwhelm the capacity of the combined sewer system. The systems have release valves of sorts – outfalls where the combined sewage and stormwater mix spills out and into waterways. When this occurs, it is called a combined sewer overflow. These types of systems are an expensive and complicated problem for communities around the country. In New Jersey, 21 communities have CSOs. Your City & It’s Permit Requirements Timeline Communities and wastewater treatment plants have either three years or five years to create their plan. Those that choose to work together to develop a regional long term control plan have five years. Each permit includes a series of intermediate deadlines before the plan is complete. DEP will review the required products at each step so by the time communities have completed the plan, they will have a strong understanding of how DEP may view their efforts. Missing deadlines will not only put permittees behind schedule, it could trigger enforcement action.deadlines

Your City & It’s Permit Requirements Implementation Once the plan is adopted, communities must then begin implementing the plan. Communities around the country often need 15, 20 or more years to fully implement their plans. Paying for repairs and upgrades In towns with CSOs, upgrading and making major changes to sewer infrastructure may become the single largest public works expenditure. The LTCPs ultimately will incorporate an estimate for how much the capital improvements will cost. Construction will be stretched out over many years, in order to help with the cost burden. Additionally, communities can incorporate green infrastructure into public works projects done by other departments, including streets, recreation, public building upgrades, and schools. Parts of these types of projects sometimes can be paid for through grants or public- private partnerships. Many communities use some of these methods to help pay for upgrades: Sewer charges Sales tax and property tax Water quality or water resource fees (Maryland, Delaware) Stormwater fees (over 1,500 cities in 39 states) The money raised can be used to: Borrow additional money via bond markets Borrow money through the New Jersey Environmental Infrastructure Financing Program’s low-interest loan and principal forgiveness programs Pay for the public portion of a private-public partnerships The Public Role Communities and treatment plants must engage the public in order to ensure options selected for the plan reflect the community’s wants and needs. A basic public notice is not sufficient. Permittees must develop a comprehensive public participation plan for how they will engage the public throughout the development of the LTCP. Additionally, communities and treatment plants must create teams with members of the public and other stakeholders called “Supplemental CSO Teams.” These teams will be tasked with acting as a liaison between the permit holder and the public as well as providing substantial comments on the evaluation and selection of CSO solutions. There are two major components to effective public participation: communication and engagement. For communities to receive meaningful feedback, they need to educate residents and business owners about the problem and potential solutions. Communities and treatment plants also are essentially seeking ratepayer support for these initiatives. By involving the public in a meaningful way, residents and business owners will be more likely to accept outcomes and support initiatives. Going beyond the minimum? Permits contain the minimum requirements that communities and treatment plants must meet in their plans. But communities and plants can develop a plan that exceeds these requirements. Why do so? Cities across the country have found that using a wide variety of methods to reduce overflows can lower costs and also create community benefits. Green infrastructure, for example, can make neighborhoods more attractive, reduce flooding and spur private investment and local job creation. Water conservation measures can save money for residents and businesses, while freeing up capacity at the wastewater treatment plant. For more information on how communities can go beyond the minimum, visit What is green infrastructure? Green infrastructure methods mimic nature by allowing rain to trickle into the ground rather than going down the drain. Methods include planting trees, building rain gardens, saving rainwater, and installing special pavement that allows water to filter through. These methods also may help cool your neighborhood in the summer and make it more attractive. However, these methods have limitations as to how much water they can manage. List of NJ Permittees Adams Street STPJoint Meeting of Essex and Union Counties STP Bayonne City MUATown of Kearny Bergen County UAMiddlesex County UA Camden County MUANorth Bergen Township MUA City of CamdenNorth Bergen Woodcliff STP East Newark BoroughPassaic Valley Sewerage Commission City of ElizabethCity of Paterson Fort Lee BoroughCity of Perth Amboy GloucesterCity of Ridgefield Park HackensackRiver Road STP HarrisonCity of Guttenberg NewarkTrenton Sewer Utility Jersey City MUA For more detailed information regarding the new permit, visit For more information on innovative solutions, visit JerseyWaterWorks.org