Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.

Slides:



Advertisements
Similar presentations
Thomas Jefferson National Accelerator Facility CWL/Kovar/March 1, 2007 Page 1 Determining Loaded-Q for SRF Cavities Used In ERLs (What do you mean it is.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
FNAL Superconducting RF Program Sergei Nagaitsev.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Highly HOM-damped cavities S. Belomestnykh Brookhaven National Laboratory and Stony Brook University March Washington, DC FCC Week 2015.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
ESS cavities interfaces
DEFLECTING CAVITY OPTIONS FOR RF BEAM SPREADER IN LCLS II
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
LFD and Microphonics Suppression for PIP-II Warren Schappert April 15, 2014.
CW and LP operation of the XFEL-type cryomodule Jacek Sekutowicz.
Cavity/CM Considerations for CW Operation Cryogenic loads and cryogen distribution End Group cooling: HOM antenna redesign HOM loads and suppression requirement.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
LCLS-II SC Linac Concept Marc Ross September 13, 2013 (input from Chris Adolphsen)
Eiji Kako (KEK, Japan)TTC at Cornell, 2013 June 13 1 HOM absorbers; KEK HOM couplers in injector Eiji Kako (KEK, Japan)
LCLS-II Technical Requirements
Test of the dressed spoke cavity
WP5 Elliptical cavities
Requirements for Efficient CW SRF Cryomodules
XFEL beamline loads and HOM coupler for CW
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
LINAC AG • IAP • Goethe Universität Frankfurt
A. Plastun¹, B. Mustapha, Z. Conway and P. Ostroumov
High Gradient Cavities: Cost and Operational Considerations
Cavity resonance control
BriXS – MariX WG 8,9 LASA December 13, 2017.
Wolfgang Anders, BESSY, Berlin
CW Operation of XFEL Modules
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
Cost Optimization Models for SRF Linacs
Overview of SRF system of Ring and Linac (1)
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Resonance Control for Narrow-Bandwidth, SRF Applications
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Performance Recovery at CEBAF
Cryomodules Challenges for PERLE
Accelerator Physics Particle Acceleration
ERL Director’s Review Main Linac
CEPC SRF Parameters (100 km Main Ring)
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager Project Management and Integration Associate Director

Thomas Jefferson National Accelerator Facility Page 2 FNAL September 11, 2009 OUTLINE  Optimum Gradient  Scaling Factors  1989 Cryogenic Optimization of Capital & Operating Costs  Q-shift across Lambda (1500 & 700 MHz)  Lorentz Detuning and Microphonics  Steady State  RF turn on  Superfluid heat transfer as function of temperature and liquid level  Tesla HOM Coupler  Summary  References

Thomas Jefferson National Accelerator Facility Page 3 FNAL September 11, 2009 DESIGN DRIVERS ILC 1.Max Gradient 2.Q 0 3.Static Heat Loads 4.Packing Factor 12 GeV Upgrade / CW SRF Linacs 1.Available Length 2.Packing Factor 3.Q 0 4.Static Heat Loads

Thomas Jefferson National Accelerator Facility Page 4 FNAL September 11, 2009 POWER DISSIPATION ACCELERATION POWER DESIPATION FOR GIVEN ENERGY COST OF OPTIMUM GRADIENT FOR 1300 MHz ≈15MV/m

Thomas Jefferson National Accelerator Facility Page 5 FNAL September 11, 2009 NORMALIZED CAPITAL COSTS

Thomas Jefferson National Accelerator Facility Page 6 FNAL September 11, 2009 NORMALIZED OPERATING COSTS

Thomas Jefferson National Accelerator Facility Page 7 FNAL September 11, 2009 TEN YEAR TOTAL COSTS

Thomas Jefferson National Accelerator Facility Page 8 FNAL September 11, TEMPERATURE OPTIMIZATION

Thomas Jefferson National Accelerator Facility Page 9 FNAL September 11, CELL 1500 MHz CAVITY

Thomas Jefferson National Accelerator Facility Page 10 FNAL September 11, MHz REFRIGERATION CAPITAL COSTS

Thomas Jefferson National Accelerator Facility Page 11 FNAL September 11, MHz REFRIGERATION CAPITAL COSTS

Thomas Jefferson National Accelerator Facility Page 12 FNAL September 11, GeV LORENTZ DETUNING CURVE

Thomas Jefferson National Accelerator Facility Page 13 FNAL September 11, 2009 STIFFING RINGS & PIEZO-ELECTRIC TUNER Stiffing Rings Improve detuning curve Raise the structure resonate frequencies Increase require tuner forces Do not eliminate need for fast tuner 12 GeV Cavity Elected not to pay for stiffing rings Fast tuner required: To eliminate slow tuner microphonics − For fast cavity turn on (or LLRF self-excited-loop)

Thomas Jefferson National Accelerator Facility Page 14 FNAL September 11, 2009 CW PERFORMANCE LIMITERS Lambda Super fluid heat conductance: ~1.0W/cm 2 Super fluid liquid – gas vaporization: <<1.0W/cm 2 −Single JLab CM Experiment NET EFFECT: GRADIENT IS FUNCTION OF LIQUID LEVEL

Thomas Jefferson National Accelerator Facility Page 15 FNAL September 11, 2009 HEAT CONDUCTION THRU VERTICAL RISER HEADER MIN LIQUID LEVEL = R/ RISER RADIUS R CAVITY

Thomas Jefferson National Accelerator Facility Page 16 FNAL September 11, 2009 TESLA HOM COUPLER

Thomas Jefferson National Accelerator Facility Page 17 FNAL September 11, 2009 TESLA HOM COUPLER Matched to ILC needs; also used for: SNS 12 GeV Upgrade JLAB FEL (10KW) Cooling Hook: Through two attachments welds to can Probe: Through ceramic feedthrough PROBLEM Thermal limited by: Duty factor RF coupling Beam current Limited work-a-rounds: Improved feedthrough heat transfer; including sapphire Nb probe tips 2K heat straps

Thomas Jefferson National Accelerator Facility Page 18 FNAL September 11, 2009 TESLA HOM COUPLER TESLA HOM coupler is optimized for Pulsed Operation Low Currents CW requires cooling modification JLab has had a great deal of trouble adapting this design for other applications: SNS (???Multipacting???) High Current CW FEL (requires SC probe tip) Fermi Lab had trouble adapting this design for 2600 MHz Weld failure

Thomas Jefferson National Accelerator Facility Page 19 FNAL September 11, 2009 SUMMARY CW operation requires integrated design effort Just scaling pulsed design will get you into trouble

Thomas Jefferson National Accelerator Facility Page 20 FNAL September 11, 2009 REFERENCES C. H. Rode and D. Proch, “Cryogenic Optimization for Cavity Systems,” Proceedings of the IEEE Particle Accelerator Conference, March 1989, p C. H. Rode, “Temperature Optimization for Superconducting Cavities,” Proceedings of ASC 98, IEEE Transactions on Applied Superconductivity, June 1999, p C. H. Rode, “Jefferson Lab 12 GeV CEBAF Upgrade,” to be published in the Proceedings of the Cryogenics Engineering Conference, June 2009.