June 2016. 4 Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.

Slides:



Advertisements
Similar presentations
Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.
Advertisements

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: June 24 th, 2013 – June 28 th, 2013.
Legal Descriptions and Site Plan Requirements
SALIENT FEATURES:  Efficient Power Distribution Network.  24 Hour Water Supply.  Well developed Plantation.  Closed campus with compound.
ReformsTargetMilestones / Activities achieved, since start of JNNURM e-Governance Property Tax Accounting Water Supply & other utilities. Birth/Death.
ICPI Update SEPT Meeting May Segmental Pavement Sales Pavers, Permeable Pavers, Paving Slabs Millions of Square Meters.
Low Impact Development (LID) Ordinance Project Technical Review Teams helped develop LID manual and resolution Technical Review Teams helped.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
Benefits of Precast Concrete Sound Walls over Alternative Products Case Study June 4, 2010.
DRAFT Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80.
Viae Romana, Roman Roads Wes Bemus Mr. Palmer’s Latin 1 A-3.
Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Training on Roads for Water and Resilience. RAINWATER RUNOFF FROM ROADS.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Lakes Creek Road Waste Transfer Station Construction highlights.
Working Successfully With Property Managers: An Interactive Engagement
Center for Built Environment and Infrastructure Studies (CBEIS) 2014 The Best Urban BMP in the Bay Award (BUBBA) “First Place Winner” Best Combination.
21 st Sep Election Process July & August
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
School Garden J. Blaine Blayton Elementary School 800 Jolly Pond Road Williamsburg, VA
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
Welcome to Construction of Open Space RWHS Orientation.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
Supervisors : Mr. S. Matara Mrs. Tabitha Njoroge
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
Amendment 1 Sorority Expansion Master Plan. The University of Alabama / Sorority Expansion Master Plan 2010 Photo Before Redevelopment Began.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
THE REAL ESTATE INSTITUTE OF ZIMBABWE ANNUAL WINTER SCHOOL (JULY 2015) (JULY 2015)
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012.
Flats in Hinjewadi. INTRODUCTION Today Real Estate Market is the best in World. Real Estate in which flats investment is the best than plots. In that.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
For sale, land, in the village of Exopoli
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE April 2017.
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
ELCITA UPDATE January 2017.
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
ELCITA Update May 2016.
ELCITA Update April 2016.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
ELCITA UPDATE August 2016.
ELCITA UPDATE November 2017.
Electronics City Industrial Township Authority
ELCITA Update March 2016.
ELCITA UPDATE April 2018.
Water Sustainability in Cities
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
Name: _________________ Class: ________
ELCITA Update January 2016.
ELCITA UPDATE September 2016.
URBAN TRAIL PROJECT UPDATES
ELCITA UPDATE August 2019.
ELCITA UPDATE April
Presentation transcript:

June 2016

4 Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E – Toilets 16 e-toilets operational. Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 98 % completed. GIS Web Application Software work in progress.

3

4

5

6

7 Kerbstone Painting along Wipro/Shikaripalaya Road

8

9

10

11

12

13

14

15 WMM Road From MSME Building to Exit Gate

16

17

18 Installation of Automated Toilets

19

20

21

22

23 RWH works – Under Progress SI.NODESCRIPTIONNO OF PITSSTATUS 1RAIN WATER HATVESTING PIT 38COMPLETED 2RAIN WATER HATVESTING PIT 12TO BE AWARDED

24 20 feet deep well Rainwater Harvesting Pit at Various locations

25

26 Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road

27 Contracts on Anvil Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP. Construction of 500 KLD STP in KIADB Land, Electronics City Phase 2

Thank You