February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)

Slides:



Advertisements
Similar presentations
Agreement between the Village of Owego and Inflection Energy.
Advertisements

CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
-Proposed Revisions- STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS for SANITARY SEWER SYSTEMS.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Steve White Urban Water Council US Conference of Mayors
INFORMATION on RATE increase On May 6, 2008, the Clark County Water Reclamation District Board of Trustees approved a rate increase at a public hearing.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
1 Collection System And Wastewater Treatment Plant Sewer Update
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
City of Los Angeles Venice Dual Force Main Project
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Collection System Regulatory Initiatives in California SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Wastewater Treatment & Collection System Improvements.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
2014 Budget Department Presentations Infrastructure Funding Options.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
S A V E - R - B A Y North Bay Watershed Association September 11, 2009 Lateral Program Update Seeking to Resolve a Difficult Public / Private.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
January 6,  INTRODUCTION  OVERVIEW OF FUNDS  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ Background Information and Capital Projects ◦
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
City of Alexandria, Virginia Sanitary Sewer Master Plan February 23, 2013 City Council Public Hearing.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
NC AWWA-WEA 95th Annual Conference
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Public Information Meeting Wastewater Treatment January 26, 2016.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
1 Understanding the ICIS-NPDES Policy Statement Betsy Smidinger, Deputy Director Enforcement Targeting and Data Division Office of Compliance Office of.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Fats, Oils & Grease (FOG) Control (aka: What is the City doing to us now?) Restaurant Managers’ Forum.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Budget Study Sessions ENVIRONMENTAL & UTILITY SERVICES Proposed Operating Budget OUTCOMES: -Reliable Utility Infrastructure -Healthy.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Sanitary Sewer Fee Study January 28, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
I/I Reduction Efforts EBMUD and the Satellite Agencies
FY 2017/18 General Budget Workshop
Separating Inflow Reduction and Infiltration Removal
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Manchester’s CSO Program: A Look Behind and a Look Ahead
Town of Dunn Sanitary District No. 3
Public Hearing Sanitary Sewer Fees
Presentation transcript:

February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)

Introduction EPA Order requires that : – “Beginning immediately … consistently and substantially reduce the frequency and volume of sewage spills.” – “(E)liminate conditions in (our) collection system that cause or contribute to wastewater spills, bypasses, or effluent limit violations.” – “SMCSD shall…achieve consistent compliance with its 2007 [NPDES] permit”. (CWA-309(a) )

– Fully-staffed – One position probationary – Between October 1, 2012 and December 31, 2012 cleaned 12.3 miles of pipe total … almost half of the system plus repeat cleaning for pipes on the 3-month and 6-month hot spot list. – Because of the importance of our trees and the environment, the City does not use chemical root control – we mechanically cut invasive roots. Staffing and Productivity

Most Recent Quarterly Sewage Spill Report Submitted January 15, 2013 Six SSOs last quarter, two public, four private – Structural failures

Most Recent Quarterly Sewage Spill Report Submitted January 15, 2013 Both public SSOs were noted by City staff and abated quickly and efficiently. The number of structural defects noted as a result of increased inspection capabilities warrants re-evaluation of priority projects and the pay- as-you-go and SRF funding balance. Complex private common lateral issues are frequently discovered as a result of a private SSO or by property transfer and substantial remodel inspections. These require a significant level of Staff effort.

Project 1a (CK10-02) – Gate 5 Road Pipeline Replacement Project. This project was described in the 2009 CIP as a pipeline removal and replacement project. To provide a reliable system that will tolerate ongoing subsidence, the project has was amended to convert the existing Gate 5 Road gravity sewer into a low pressure force main. A vacuum sewer alternative is also being evaluated. The project is needed to remove sags, joint separations, and other structural defects in the existing pipe. The project remains in final design stage, is projected to bid in 2013 and complete construction in the following year given SRF funding. Project 1b (CK10-01) – Spinnaker Grease Interceptor, Pipeline, and Anchor Pump Station Rehabilitation project. In the 2009 CIP, this project included a new grease interceptor and removal and replacement of the existing gravity pipeline between Spinnaker Restaurant and Anchor Street Pump Station. In lieu of a new gravity pipeline, the current project configuration converts the existing gravity sewer to a low pressure force main, and rehabilitates Anchor Street Pump Station. Construction expected to be complete by May Approval of Award expected imminently from SRF Short-Term Collection System and Capacity Improvement Projects – SRF Funding Planned

Project 1c (CK11-01) Project completed as spot repairs. Project 2b (CKyy-0C) – Beach Main, Including Valley to Main Rehabilitation Project - Design. This project addresses pipelines that are partially or fully submerged in the San Francisco Bay, and present a reliability concern to the City. Preliminary design and environmental planning were initiated in Significant permitting and project implementation challenges have become apparent during this effort, delaying final design and construction. The City and the Sausalito-Marin City Sanitary District are jointly working in this project. Project 3b (CK10-03) Construction was satisfactorily completed in Short-Term Collection System and Capacity Improvement Projects (cont’d)

Project 3e (partial) (CKyy-0A) –Bee Street Sewer Replacement. This project replaces pipelines with multiple structural defects on Bee Street, near City Hall. Project CKyy-0B – Whiskey Springs Generator Improvements is currently in design. Design will be coordinated with SMCSD with regard to wet weather flows and possible replacement of the SMCSD Scotty’s Pump Station. Design is expected to continue in 2013 for anticipated construction in 2014 given SRF funding. Short-Term Collection System and Capacity Improvement Projects (cont’d)

Other Priority Capital Projects Not SRF Funded Nevada Street Pipeline Replacement. This 6-inch diameter pipeline will be removed and replaced between Tomales Street and Bridgeway Boulevard (Manhole Nos to ) with a larger pipe. Coloma Street Pipeline Replacement. This 6-inch, transitioning to 8-inch pipe will be replaced with a larger diameter pipe. The project area also includes the Whiskey Springs Pump Station Capacity Improvement project. This project provides firm capacity sufficient to convey wet weather flows from the design flow event.

Other Priority Capital Projects Not SRF Funded Caledonia at Turney Street Pipeline Replacement. This 12-inch diameter pipeline will be removed and replaced between Turney and Locust Streets. (Manhole Nos to ). This pipeline is currently 12-inches in diameter. In order to convey design wet weather flows, the pipe segments require upsizing by one pipe diameter. Urgent sewer replacements have been identified as necessary under portions of 3 rd /4 th and Main Streets, as well as Miller Avenue – an estimated $600,000 in construction costs. Reconstruction of Richardson Street will result in replacement of the sewer main and all lower laterals.

Issues/Opportunities 1.SRF funding 2.Lateral Grant Program 3.Sewer Ordinance Revision 4.Policy regarding facilities in public ROW 5.Rate Study to include 2-4 above as well as storm drain asset replacement funding alternatives 6.Recent studies by neighboring agencies warrant revisiting of flow-based rate issues 7.The pay-as-you-go and SRF funding balance must also be revisited 8.Program management expertise

Neighboring Agencies News In December 2012, TCSD and SMCSD successfully concluded negotiation of an Agreement for SMCSD’s provision of wastewater treatment services to TCSD through December 12, (City of Sausalito and SMCSD will initiate discussion on revisions to existing out-dated service agreement with Staff and Sewer Ad Hoc Committee involvement beginning in March, 2013). TCSD and SMCSD have both recently evaluated sewer service charges and considered (TCSD) or will consider (SMCSD) changes.

Neighboring Agencies News (cont’d) TCSD left its sewer rates unchanged following the completion of its rate study with TCSD Board action of August 8, SMCSD heard from its rate consultant most recently at a special meeting held January 30, The SMCSD Board is scheduled to hear the matter again at a special meeting in May, 2013

Questions?