Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Third Energy Package for Change of Supplier 2009/73/EC.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Distribution Charging Methodologies Forum DCC Charging Methodology 4 th April 2013.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
New gas shipper licence arrangements Gas Transmission Workstream 2 December 2010.
CER Update Industry Governance Group 21 st September 2011.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
SSP/LSP and Market Sector Code Simon Trivella – December 12 th 2007 Review Group 178 – Reclassification of SSP to Domestic Only.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Industry data quality, ownership and governance Meeting with UNC 17 July 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
Proposed publication of objection rates for LSP Supply Points On behalf of Gazprom Marketing and Trading-Retail.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
Debt Flagging for Electricity & Gas Customers – Industry Code CER, GMARG/IGG August, 2011.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Datalogger / DMV Modification Proposals - Summary
Modification Proposal 255 – LSP Objection Rates 2nd Sample Report
Code Governance Review UNC Modification Proposals
SSP/LSP and Market Sector Code
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Action 0002: Meter Error Notifications
Project Nexus Workgroup
Simon Trivella – 22nd May 2008 Distribution Workstream
Exit Capacity Substitution and Revision
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison.
Joint Office Presentation for Modification 0678
Project Nexus Workgroup
Datalogger / DMV Modification Proposals - Summary
Market Differentiation Workgroup Market Sector Flag Analysis
Proposer: Debbie Brace Panel Date: 20th March 2014
Supply Point Information Services Post-Nexus update
Modification Proposal 255 – LSP Objection Rates
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Information Provision for Transitional Exit Capacity
Implementation Approach Distribution Workgroup – June 2014
Presentation transcript:

Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream

Background – Market Sector Code (MSC) Field within Sites and Meters Can hold the following values: –“D” for domestic –“I” for Industrial & Commercial Population is Mandatory on Confirmations (since 2001) Can be updated using bespoke file (T73)

Background – Market Sector Code (MSC) Blank population (as of 27 th July 2009) –Approximately 7,000,000 (~33% of all Supply Points) –Blank population is reducing slowly (<0.5% per month) Extensive analysis presented –Market Differentiation on 4 th August 2009

Background – Market Sector Code (MSC) References to “domestic” and “non-domestic” –The Gas Act –Gas Transporter Licence (various conditions) –Gas Supplier Licence (various conditions) –Gas Shipper Licence (various conditions) –The Gas (Standards of Performance) Regulations 2005 & A2008 –Uniform Network Code (TPD G & TPD J)

Background – Market Sector Code (MSC) References to “domestic” and “non-domestic” –The Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008 –The Consumers, Estates Agents and Redress Act 2007 Complaint Handling Standards 2008 –The Electricity & Gas Carbon Emissions Reduction Order 2008 –The Supply Point Administration Agreement (SPAA) Detailed summary presented at Workstream (10 th Sept 09)

Issues “Gap” in Supplier/Shipper Licence provisions –Condition 17 (Mandatory exchange of information) 17.9 Requirement to inform Shipper if premise is domestic or non-domestic within 3 days of becoming relevant Supplier Requirement to inform Shipper if premise changes from domestic to non-domestic and vice versa For the above, if the Supplier is the Shipper then the Supplier must inform the relevant Transporter

Issues “Gap” in Supplier/Shipper Licence provisions –No corresponding Shipper obligation to inform Transporter when they are not also the Supplier –Obligation is not retrospective Does not impact on blank MSC data

Issues No UNC requirement for accuracy or maintenance –MSC only has to be populated at confirmation stage Compliance (Regs, UNC etc) Inability to report on ‘market sectors’ Restricts industry development? –Modification Proposal 0253 / Data Protection Act –Ability for greater Market Differentiation

Proposal UNC obligation on Shippers –Population of Market Sector Code flag –Accuracy of submitted Market Sector Code flag –Maintenance of Market Sector Code flag

Proposal Implementation –Blank MSC flags to be populated –Incorrect MSC flags to be corrected –Transition period needed? Potential for 7,000,000 T73 files or Confirmations Potential “data-fix” approach Shipper input required –Non User Pays (subject to Implementation technique)

Next Steps Draft Modification Proposal published –Shipper feedback on Proposal (incl. Implementation) –December / January Modification Panel

Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream