N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.

Slides:



Advertisements
Similar presentations
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Advertisements

1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel November 25, 2013 Patrick Daly.
Chubaka Producciones Presenta :.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
How Nuclear Power Plants Work Nuclear fuel heats water that turns into steam which spins a turbine that generates electricity. Joe Parkhill.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. Gerard van Noordennen September 29, 2014.
California Energy Commission James Madigan April 27, 2015.
One Project. One Team. One Goal.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
Energy for the Future Belene Nuclear Power Plant Project Status.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
February 26, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee, LLC (ENVY)
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
Repatriation of Vinča RA Reactor Spent Fuel The 15th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM
Phase I Decommissioning Project Update West Valley Demonstration Project Presented by: Bryan Bower, Department of Energy November 14, 2012.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
The 3 Yankee Companies Interim Storage Sites for SNF & GTCC Waste NEHLRW Transportation Taskforce Meeting Portsmouth, NH, December 16, 2015 Eric Howes,
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
November 12, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Oil Sands & Nuclear Energy: Our Integrated Energy Vision Presentation for: Energy Roundtable, Calgary Presentation by Wayne Henuset, Director September.
DECOMMISSIONING FROM THE FRONT LINES HISTORY, EXPERIENCE, AND THE PATH FORWARD Deb Katz Executive Director Citizens Awareness Network Contact: (413)
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
AJ Blotcky Research Reactor Pre-Bid Meeting 3 September 2014.
ISOE-Europe 3/25/04 1 San Onofre Unit 1 Decommissioning Eric M. Goldin Eric M. Goldin Southern California Edison Company.
Oyster Creek [Exelon Nuclear] Oyster Creek: Operated at power Scheduled Maintenance Outage April 24 – May 13 NRC Assessment (ROP Action Matrix): Licensee.
Decommissioning San Onofre
Decommissioning Issues
John Christian President, Logistics, Processing and Disposal
John Christian President, Logistics, Processing and Disposal
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
CR3 and Crystal River Energy Complex
West Valley Demonstration Project Status Update
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
SONGS Past, Current, and Future State May 4, 2016
Possible Transition from Operating to Decommissioning
McDonald’s Kalender 2009.
Decommissioning Rulemaking
McDonald’s calendar 2007.
Northeast High-Level Radioactive Waste Transportation Task Force
November , 2018 State Roundtable Reports Pennsylvania
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
McDonald’s calendar 2007.
Governmental Accounting Finance Budget “101”
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016

Z NOI S ITULOONS An EnergySoluitons Company LLC Agenda Project Status update Trust fund update 2

Z NOI S ITULOONS An EnergySoluitons Company LLC Safety Two OSHA Recordable injuries to date in 2016 Two First Aids 3

Z NOI S ITULOONS An EnergySoluitons Company LLC 2015 Key Accomplishments Fuel Transfer to ISFSI Completed All Class GTCC Waste Removed All Class B & C Waste Removed NRC Approved DSEP Plan License Termination Plan Submitted to NRC and Accepted for Review Control Room Shut Down Completed Demolition and Backfill of Cribhouse Completed VCC Pad, Old Sewer Lift Station, VBS, Met Tower and South Guardhouse Demolitions Completed Phase 1 Turbine Building Interior Demolition Completed 4

Z NOI S ITULOONS An EnergySoluitons Company LLC 2015 Key Accomplishments: Reactor Vessel Segmentation Unit 1 and Unit 2 Lower Internals Complete Unit 1 and Unit 2 Cavities have been drained and decontaminated. Unit 2 reactor vessel segmentation completed Unit 1 reactor vessel segmentation completed 5 Cutting on Lower internals Unit 1

Z NOI S ITULOONS An EnergySoluitons Company LLC 2015 Key Accomplishments Turbine Building Unconditional Release Surveys Completed Aux Building Pre-Open Air Demolition and Decontamination Commenced Fuel Rack Removals Completed Containment Buildings Tendon Removal Commenced Unit 2 Steam Generator Removal Completed Unit 1 Steam Generator Removal Commenced Water Processing Commenced 6

Z NOI S ITULOONS An EnergySoluitons Company LLC Waste Operations Class A waste disposal – 404,000 lbs of 3.2 M lbs. shipped Class B&C waste disposal complete – 37 of 37 casks shipped

Z NOI S ITULOONS An EnergySoluitons Company LLC 2016 Major Milestones Complete Liquid Rad Waste Processing – March 2016 Unit 2 Large Components Removed - Completed Unit 1 Steam Generators & Large Components Removed – March 2016 Achieve ASA66 Contract Milestone – March 2016 Complete Containment Tendon Detensioning and Removal – April 2016 Complete Services Building Demolition and Backfill – April 2016 Complete Containment Interior Ventilated Demo – June

Z NOI S ITULOONS An EnergySoluitons Company LLC 2016 Major Milestones Complete Turbine Building Basement Demo & Backfill – June 2016 Complete Rad Surveys of Misc Materials & Equipment – July 2016 Complete Fuel & Auxiliary Building Interior Demo – September 2016 Complete Removal Of Diesel Generators – November 2016 Complete Turbine Building Demo – December 2016 Complete Containment Interior Non-Ventilated Demo – December 2016 De-staffing throughout 2016 will reduce workforce from 317 (January) to approximately 150 9

Z NOI S ITULOONS An EnergySoluitons Company LLC 10 Crib House Demolition

Z NOI S ITULOONS An EnergySoluitons Company LLC Disbursements and Balances ZionSolutions Nuclear Decommissioning Trust As of September 30, 2015 ($ millions) Beginning Balance $ Earnings - Net of Taxes & Fees Disbursements (698.0) Ending Balance $ 222.6

Z NOI S ITULOONS An EnergySoluitons Company LLC Biodiversity Protection The Illinois Beach State Park located on the North and South side of the Zion Nuclear Station provides habitat to various wildlife. Some Examples of Wildlife Protection at Zion Nuclear Station include: –Canada Goose and Goslings –Blanding’s Turtle Inspections and Notifications –Snakes Fox Snakes Garter Snakes Stewardship 12

Z NOI S ITULOONS An EnergySoluitons Company LLC Major Expense Categories Majority of Expense Incurred As of September 30, 2015 Project Management Procurement of Casks & Canisters for Dry Fuel Storage Waste Disposal Planning & Preparation for Spent Fuel Storage Unit 1 & 2 Internals Segmentation ISFSI Pad Design & Construction Plant Maintenance & Security Asbestos Remediation Unit 1 & 2 Containment Preparation & Support Project Management Fuel Transfer Operations Unit 1 & 2 Reactor Vessel Segmentation & Disposal