1. Considering the Questions Why does phase terminate for each scenario? What is process followed by Minimum Green timer? What is process followed by.

Slides:



Advertisements
Similar presentations
Suppose that f(x) and g(x) are functions for which g(x) = f(x) – 5 for all values of x. a.How are the graphs of f(x) and g(x) related geometrically? b.
Advertisements

Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Graphs of “Capability Traps” for Bertelsmann Transformation Index for each country of bottom 40 plus countries Lant Pritchett November 2010.
Frequency Distributions Athletic Shoe Survey Issue: Analyze the data from a survey of 100 college students regarding the number of Nike shoes they own.
More on Functions and Their Graphs Section 1.3. Objectives Calculate and simplify the difference quotient for a given function. Calculate a function value.
Graphs of “Capability Traps” for the Failed State Index, “Progressive Deterioration of Services” for each country of bottom 43 plus countries overall Lant.
Graphs of “Capability Traps” for the World Governance Indicators (KKM) index of “government effectiveness for each country of bottom 43 plus countries.
Estimation of parameters. Maximum likelihood What has happened was most likely.
Railroad Problem. Figure 1-Condition Diagram- Nine Mile Road Crossing Novi, Michigan Nine Mile Road 12’ NOVI FIRE STATION FIFE ELECTRIC 23’ 29’ 158’ 32’
Phase Difference = Phase Difference = 0.05.
Lecture #15 Actuated Signals: Chapter 19. Objectives Understand the benefits of actuated signals Understand the basic parameters Application in a coordinated.
A network is shown, with a flow f. v u 6,2 2,2 4,1 5,3 2,1 3,2 5,1 4,1 3,3 Is f a maximum flow? (a) Yes (b) No (c) I have absolutely no idea a b c d.
f has a saddle point at (1,1) 2.f has a local minimum at.
Health Products. What is the Function of this Product? 1.
1 Example 2 Estimate by the six Rectangle Rules using the regular partition P of the interval [0,  ] into 6 subintervals. Solution Observe that the function.
E- Auction. Home page Of E Auction Features Home Page User Login Page Search E- Auction Latest E – Auction Child Portal.
This is the graph of y = sin xo
TRB Signal Timing Best Practices Workshop 2005 Isolated Actuation, plus The Dilemma Zone Dilemma Rick Denney Iteris.
Chapter 5 Models and UML Notation for The Object-Oriented Approach.
EU 21 Day Switching. Contents Bank Holiday Challenge for 21 Day Switching Objection Window –Fixed Reduction –Variable Reduction Confirmation Window Reduction.
Controller Timers or timing processes Minimum green Maximum green Vehicle extension/passage time/gap time The minimum green timer becomes active.
MATH DYAD COUNTD OWN TIMER Copyright © 2009 Kelly Mott.
The new P2PP tool | | Monika Petr-Gotzens The new Phase 2 Proposal Preparation (P2PP) tool Monika Petr-Gotzens.
City of San Diego Retiree Medical Proposal City Council Presentation May 13, 2011.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
05/16/2008 Improved Traffic Signal Efficiency in Rural Areas through the use of Variable Maximum Green Time Aswini Rajagopalan.
Sections 7.6 and 7.8 Graphs of Sine and Cosine Phase Shift.
Stock Control Revision
* Topic 7 Field Operations
Uma Rai Bangalore
Liquid-Liquid Phase Equilibrium
1. Overview. 1. Overview 1. Overview 1. Overview.
Chapter 7: Lesson 7.6 Linear Programming
Climate Graphs What do they tell us?.
Climate Graphs What do they tell us?.
A function f is increasing on an open interval I if, for any choice of x1 and x2 in I, with x1 < x2, we have f(x1) < f(x2). A function f is decreasing.
ديبــــاجــــــة: صادق الكنيست الإسرائيلي في تاريخ على اقتراح قانون دائرة أراضي إسرائيل (تعديل رقم7) – 2009 الذي يشكّل، عمليًا، خطة إصلاح شاملة.
Question 1 When is detector active; when is it inactive?
Application of Derivative in Analyzing the Properties of Functions
Translations of Trigonometric Graphs.
Find the local minimum value of {image} {applet}
Movies v Plays
Running the Experiment
Critical Thinking Questions
SponTaneous Respiration using IntraVEnous anaesthesia and Hi-flow nasal oxygen (STRIVE Hi) maintains oxygenation and airway patency during management.
What is the function of the graph? {applet}
Dilemma Zone Protection at An Isolated Signalized Intersection Using Dynamic Speed Guidance Wenqing Chen.
بِسْمِ اللَّـهِ الرَّحْمَـٰنِ الرَّحِيمِ وَلِكُلٍّ وِجْهَةٌ هُوَ مُوَلِّيهَا ۖ فَاسْتَبِقُوا الْخَيْرَاتِ ۚ أَيْنَ مَا تَكُونُوا يَأْتِ بِكُمُ اللَّـهُ
Alternating Currents Electricity Tutorial 9.
Optimizing oxygenation and intubation conditions during awake fibre-optic intubation using a high-flow nasal oxygen-delivery system  S. Badiger, M. John,
Running the Experiment
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
VEHICLE TECHNOLOGY BRAKE SYSTEMS.
Question 1 How much variation is there in headways between vehicles in departing queue?
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
What is the function of the graph? {applet}
Comparing Permitted And Protected Left Turn Phasing
Comparing Protected/Permitted And Protected Left Turn Phasing
Descriptive Statistics Univariate Data
Settlement Shape.
The number in each lane indicates
Section – Linear Programming
Lecture 28 Approximation of Set Cover
Mean and median systolic and diastolic BPs after dialysis were unchanged over time and similar between epoetin alfa-epbx and epoetin alfa. Mean and median.
the angular speed is zero. the angular speed is constant.
Triangle Basics Lesson 2
APPLICATION OF THE REVISED PROVISIONS UNDER PHASE II
Complete Vehicle Systems.
Presentation transcript:

1

Considering the Questions Why does phase terminate for each scenario? What is process followed by Minimum Green timer? What is process followed by Vehicle Extension timer? What is process followed by Maximum Green timer? What are two conditions for termination of green? 2

Doing the Activity Step 1. Open movie file Step 2. Observe status at beginning of Phase 4 green Step 3. Observe two scenarios for one green indication Step 4. Summarize your observations 3

4

Question 1 Why does phase terminate for each scenario? 5

Question 2 What is process followed by Minimum Green timer? 6

Question 2 What is process followed by Minimum Green timer? 7

Question 3 What is process followed by Vehicle Extension timer? 8

Question 3 What is process followed by Vehicle Extension timer? 9

Question 4 What is process followed by Maximum Green timer? 10

Question 4 What is process followed by Maximum Green timer? 11

Question 5 What are two conditions that cause termination of green? 12

Question 5 What are two conditions that cause termination of green? 13

Question 5 What are two conditions that cause termination of green? 14

Question 5 What are two conditions that cause termination of green? 15