Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days 20162 U. Wagner, CERN.

Slides:



Advertisements
Similar presentations
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Advertisements

4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
Objectives: Understand importance of utility and maintenance system in industry/plant.
ESS Cryogenic System Design
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Hydraulics For The Long Term
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CENTRIFUGE DRIER / FILTER « CENTRIFILTER » APPLICATION: Particles and water contaminants are the most usual cause of problems in process analyse. According.
CRYOGENICS AND POWERING
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Clark Reliance Corporation Strongsville, OH. Fuel Gas Treatment.
G-2 Cryogenic System. Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
BCWC Water-cooled water chillers with centrifugal compressor/s
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Superconducting Electronics and Detectors Workshop “Jefferson Lab Cryogenic Operation” Mathew C. Wright December 1,
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
TE-CRG Activities D. Delikaris, TE-CRG.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
TITLE OF THE PROJECT:- AUTOMOBILE AIR CONDITIONING AIM OF THE PROJECT:- TO STUDY ABOUT AIR CONDITIONING SYSTEM OF AN AUTOMOBILE PRESENTED BY: INAMUL.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Hybritec Refrigerated/Blower Purge Dryers (Combination Dryer)
James McIntyre VRF Training Manager V5 Key Components.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Industrial Resources, Inc.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
TE-VSC group seminar (10th June 2016)
Proximity Cryogenics P&IDs meeting
SPS cryogenic proximity equipment and SM18 validation
CRYOGENICS OPERATIONS 2008 Organized by CERN
Activities of the ME section during LS2 ( )
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
Mathew C. Wright October 2016
The Fermi National Accelerator Laboratory is a U. S
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
BASIC PNEUMATICS.
Treatment – Ultraviolet (UV)
ILC Experimental Hall Cryogenics An Overview
Cryogenic System Commissioning Summary Report
Charge 2. Equipment Protection 3. Definition and Documentation
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Pneumatic System Conditioning
Presentation transcript:

Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN

Topics Introduction ATLAS and CMS Operation history 2011, 2012, 2015 Availability data Reasons for down time Impurities and filter clogging Inbuilt impurity handling Filter clogging development 2011, 2012/13, 2015 Oil contamination 2015 Identified reason Realised modifications European Cryogenics days 20163

Topics Introduction ATLAS and CMS Operation history 2011, 2012, 2015 Availability data Reasons for down time Impurities and filter clogging Inbuilt impurity handling Filter clogging development 2011, 2012/13, 2015 Oil contamination 2015 Identified reason Realised modifications European Cryogenics days 20164

ATLAS and CMS cryogenics ATLAS Two separate cryogenic services LN 2 cooling system for the LAr calorimeter He cooling system for the superconducting magnets One refrigerator for 40 K – 60 K cooling; (Shield Refrigerator) One refrigerator for 4.5 K cooling; (Main Refrigerator) Two magnet systems One solenoid magnet cooled in thermosiphon mode Several toroidal magnets cooled by forced flow In this presentation only the Main Refrigerator (MR) is considered European Cryogenics days 20165

ATLAS and CMS cryogenics CMS One single cryogenic service One refrigerator for all loads down to 4.5 K One solenoid magnet cooled in thermosiphon mode European Cryogenics days 20166

Topics Introduction ATLAS and CMS Operation history 2011, 2012, 2015 Availability data Reasons for down time Impurities and filter clogging Inbuilt impurity handling Filter clogging development 2011, 2012/13, 2015 Oil contamination 2015 Identified reason Realised modifications European Cryogenics days 20167

ATLAS availability 2011 European Cryogenics days 20168

CMS availability 2011 European Cryogenics days 20169

ATLAS availability 2012 / 2013 European Cryogenics days

CMS availability 2012 / 2013 European Cryogenics days

ATLAS availability 2015 European Cryogenics days

CMS availability 2015 European Cryogenics days !

Repetitive common reasons Power cuts “Glitches”, typically <120 ms Long term cuts, typically >300 ms to black-out Control& instrumentation Electrical contact error, element failure Mistakes or shortfalls in programmed controls Human error Operating errors Errors during servicing, working on utilities Once closing by valve by unknown person Impurity problems European Cryogenics days

Isolated reasons Only experienced for ATLAS Cold pump problems Client perturbations Test without current and beam (2015) Voluntary signal suppression (2015) Late start-up after technical stop (2015) Only experienced for CMS UPS problem European Cryogenics days

ATLAS downtime reasons European Cryogenics days

ATLAS modifications 2014 Power cuts 2011 and 2012 all “glitches” lead to a stop of the installation Detailed fault chain analysis Readjustment of hard and soft safety to be tolerant to power losses of < 120 ms. Result 2015 No more installation stops due to short power loss. Now most of the glitches are seen by the client system. European Cryogenics days

ATLAS modifications 2014 Control and instrumentation Existing electrical cabinets removed and completely replaced Turbine speed measurement changed against more reliable and more precise equipment The original equipment was from 1990 and was “moved / modified” several times by CERN Documentation not up to date European Cryogenics days

CMS downtime reasons European Cryogenics days

CMS modifications 2014 Nearly none Operation 2011 showed no real shortcomings Availability at 98.3%, only power cuts. Failing UPS system exchanged Was part of problematic batch Control and instrumentation problems due to failing temperature switch in hard-wired compressor safety. Hard wired safety chain modified. European Cryogenics days

Topics Introduction ATLAS and CMS Operation history 2011, 2012, 2015 Availability data Reasons for down time Impurities and filter clogging Inbuilt impurity handling Filter clogging development 2011, 2012/13, 2015 Oil contamination 2015 Identified reason Realised modifications European Cryogenics days

Inbuilt impurity handling Solids The installations have filters More to protect delicate equipment than to remove a constant flow of solid impurities. Liquids We rely on the final oil removal system for oil. We rely on the heat exchanger design for water. We rely on purges and oil adsorber heating to remove water during a start-up phase. Water from top-up oil. European Cryogenics days

Inbuilt impurity handling Gasses Both refrigerators have one guard adsorber at 80 K. Neither has a by-pass Only the CMS adsorber can be isolated, requiring a cold box stop. In short, this means there is virtually no impurity handling. CERN responsibility as specified accordingly. European Cryogenics days

ATLAS MR 80 K adsorber European Cryogenics days

CMS 80 K adsorber European Cryogenics days

Inbuilt impurity handling The 80 K adsorber will charge with N2/O2 impurities principally during the first cool down phase. At high partial impurity pressure This adsorber will always be subject to temperature fluctuations. Due to operation interruptions, load changes At low partial impurity pressure Impurities will migrate to the adsorber outlet and finally desorb into the helium stream. European Cryogenics days

Filter clogging Impurities passing the 80 K adsorbers will clog the turbine inlet filters. This happens regularly Small quantities of impurities are sufficient. In case of gaseous impurities, filter warm-up removes the clogging agent. In case of liquid impurities a persistent  p off-set usually remains European Cryogenics days

ATLAS filter clogging 2011 to 2015 European Cryogenics days

CMS filter clogging 2011 to 2015 European Cryogenics days

Impurities conclusion We live with impurities Valid for all our installations The absence of an adapted handling system for gaseous impurities is a nuisance. Oil impurities in 2015 were NOT limited to CMS. We have seen the same effect in much smaller scale at ATLAS. European Cryogenics days

Topics Introduction ATLAS and CMS Operation history 2011, 2012, 2015 Availability data Reasons for down time Impurities and filter clogging Inbuilt impurity handling Filter clogging development 2011, 2012/13, 2015 Oil contamination 2015 Identified reason Realised modifications European Cryogenics days

Oil contamination 2015 The identified reason for the peak of oil contamination is a bad choice of the adsorbent material of the final oil adsorber. During the long shut-down in 2013 / 2014 all oil adsorbers were equipped with this adsorbent in the frame of preventive maintenance. The adsorbent material was changed from activated charcoal (coconut shell based) to activated coal (anthracite based) Reasons were cost driven combined with a total lack of understanding. We only noticed this change in late summer European Cryogenics days

Oil contamination 2015 The reason why the ATLAS system suffered much less lies in the difference of the respective oil treatment systems up stream of the adsorber. No unplanned down time due to oil contamination Installations with well performing oil separators and coalescers suffered little. Unfortunately the separator coalescer units for CMS were the worst ever receptioned at CERN. European Cryogenics days

Realised modifications at CMS Exchange of the adsorbent material As well for ATLAS Exchange of the final oil separator and coalescer stages. We really wanted to be on the safe side: We consciously over specified the amount of circulating oil. We asked for a generous design leading to low oil carry over from the separator. European Cryogenics days

Original CMS oil removal system European Cryogenics days Coalescer stage Oil separator

New CMS oil removal system European Cryogenics days Oil separator Coalescer stage

Measurement of oil carry over Oil carry over from the separator. m1 = mc1 + mc2 + mc3 CERN specification < 100 ppm mass Original system ~ 750 ppm mass New system ~ 20 ppm mass European Cryogenics days

Conclusions What did we learn? For cryogenic systems that are supposed to accumulate long periods of uninterrupted operation, 80 K adsorbers need a means to be regenerated during the run. Be weary in case different / cheaper alternatives for spares or replacement material is proposed. The final oil separator is an important element in the final oil removal system. The bad performance of a separator cannot be recovered by adding coalescers. We seriously consider to tighten the specified limit of 100 ppm mentioned above. European Cryogenics days