Reliability Must Run Resources for Summer 2011. Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Demand Response in the Reliability Pricing Model Chuck Whitlock.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Real Time Mitigation During Exceptional Fuel Cost Events.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Electric Reliability Council of Texas, Inc. Late Fees and Short Payments in Bankruptcies / Payment Plans.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Reliability Must Run Workshop Introduction May 24, 2016.
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Ancillary Service Trades and Ancillary Service Settlement
Real-Time Co-optimization of Energy & Ancillary Services
RMR Update November 6, /05/2002.
Presentation transcript:

Reliability Must Run Resources for Summer 2011

Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two Resource Entities to return Mothballed Generation Resources to service to mitigate capacity shortages during the extreme heat and drought conditions impacting the ERCOT Region. Outcome Contracts RMR

Slide 3 RMR for Summer 2011 RMR Contracts for Mothballed Units Garland Power & Light –Spencer 4 –Spencer 5 NRG Texas Power, LLC –SR Bertron 1 –SR Bertron 2 Spencer to begin week of August 22 Bertron to begin first week of September Contracts terminate October 31, 2011 Outcome Contracts RMR 122 MW 292 MW

Slide 4 RMR for Summer 2011 Operation for these RMR Units will be as follows: No Three Part Supply Offers Not offered into DAM Committed only by Hourly RUC Resources will come On-Line with no Energy Offer Curve Outcome Operations RMR Committed based on system conditions and ability to meet demand.

Slide 5 RMR for Summer 2011 What happens when an On-Line Resource has no Energy Offer Curve? –ERCOT creates proxy Offer Curve Outcome Operations RMR MW $/MWh Proxy Energy Offer Curve 0 $ LSL+1MW -$250 $3000 LSL HSL

Slide 6 RMR for Summer 2011 What happens when an On-Line Resource has no Energy Offer Curve? –Resource is Price-taker at Low Sustained Limit (LSL) Outcome Operations RMR MW $/MWh Proxy Energy Offer Curve 0 $ LSL+1MW -$250 $3000 LSL HSL

Slide 7 RMR for Summer 2011 What happens when an On-Line Resource has no Energy Offer Curve? –Resource is very expensive to dispatch above LSL Outcome Operations RMR MW $/MWh Proxy Energy Offer Curve 0 $ LSL+1MW -$250 $3000 LSL HSL

Slide 8 RMR for Summer 2011 What happens when an On-Line Resource has no Energy Offer Curve? –ERCOT will not dispatch Resource above LSL until market prices reach $3000. Outcome Operations RMR MW $/MWh Proxy Energy Offer Curve 0 $ LSL+1MW -$250 $3000 LSL HSL

Slide 9 RMR for Summer 2011 Payment process for RMR units Outcome Settlements The Settlement process for these RMR Resources follows standard RMR Settlement practices per Protocol section 6.6.6, Reliability Must-Run Settlement

Slide 10 RMR for Summer 2011 Payment process for RMR units ERCOT ultimately provides two types of payments to the QSE for an RMR Resource –Standby Payment ◦Includes costs to return to operational status ◦Ongoing operation and maintenance costs –Energy Payment ◦Actual Fuel costs to start and produce energy Outcome Settlements

Slide 11 RMR for Summer 2011 Payment process can be complex Lots of other Moving Parts for RMR Settlement –Real-Time Energy Imbalance Payment –Emergency Energy Payment –RUC Make-Whole Payment –RUC Clawback Charge Outcome Settlements ? ? ? QSE is exposed to the usual Payments and Charges for a Resource

Slide 12 RMR for Summer 2011 Outcome Settlements ERCOT then Reverses these Charges and payments through the RMR Adjustment Charge ? ? ? Payment process can be complex Lots of other Moving Parts for RMR Settlement –Real-Time Energy Imbalance Payment –Emergency Energy Payment –RUC Make-Whole Payment –RUC Clawback Charge

Slide 13 RMR for Summer 2011 Costs Uplifted to QSEs with Load Net of all RMR charges and payments –Standby Payment –Energy Payment –RMR Adjustment Charge –RMR Non-Performance Charge ◦$10,000 per event of Unexcused Misconduct ◦Would reduce charge to QSEs with Load Outcome Settlements ? ? ?

Slide 14 RMR for Summer 2011 A few notes about Capacity Short Charges QSEs who are capacity short pay a portion of the RUC Make Whole Costs The RUC Capacity Short Charges are not affected by the RMR Adjustment Charge Outcome Settlements ? ? ? QSEs who are capacity short will still pay RUC Capacity Short Charge, even if RUC Make-Whole payments were calculated only for these RMR units

Slide 15 RMR for Summer 2011 RMR Reports Available through MIS* Outcome MIS Posting * – Requires a Digital Certificate