SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,

Slides:



Advertisements
Similar presentations
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Advertisements

Lattice Status SuperB Project Workshop SLAC, October 6-9, 2009 Yuri Nosochkov for the SuperB Lattice Team Major recent updates by P. Raimondi and S. Sinyatkin.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
SuperB Meeting, May 2008 Status of the magnetic design of the first quadrupole (QD0) for the SuperB interaction region S. Bettoni on behalf of the whole.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
M. Sullivan Apr 27, 2017 MDI meeting
MDI Issues M. Sullivan For
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
Update of the SR studies for the FCCee Interaction Region
FCC-ee IR magnetic element design – an update
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
SuperB General Meeting XI
M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
IR Summary M. Sullivan SuperB General Meeting XII
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Final Focus Synchrotron Radiation
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
The IR beam pipe M. Sullivan For
Yingshun Zhu Accelerator Center, Magnet Group
The PEP-II Interaction e+e- Factories Workshop
IR Design Update M. Sullivan For
Integration and IR Hall
Overview of MDI design II
Compensation of Detector Solenoid with Large Crossing Angle
IR Summary M. Sullivan For
The design of interaction region
Interaction Region Design Options e+e- Factories Workshop
Design of Interaction Region
IR Summary M. Sullivan For
Summary of Washington DOE Review
IR Lattice with Detector Solenoid
IR Summary M. Sullivan For
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
SuperB Accelerator Overview
IR Beam Transport Status
Summary of the FCCee IR Workshop Jan 2017 at CERN
IR Magnet Design and Engineering Considerations
Energy Changes and the IR
Some of the Points Raised During my JLAB Visit
SR Background Update for JLEIC
S. Bettoni on behalf of the whole team
Presentation transcript:

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, F. Bosi, P. Fabbricatore, P. Raimondi, M. Biagini, P. Vobly, I. Okunev, A. Novokhatski, S. Weathersby, et al. SuperB Meeting XVII La Biodola, Isola d’Elba, Italy May 28 - June 2, 2011

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 2 Outline Review of present IR design Engineering input Next Steps Summary and Conclusions

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 3 Present Parameters? (V12 lattice)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 4 Parameters used in the IR designs Parameter HER LER Energy (GeV) Current (A) Beta X* (mm Beta Y* (mm Emittance X (nm-rad) Emittance Y (pm-rad) Sigma X (  m) Sigma Y (nm) Crossing angle (mrad)+/- 30

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 5 General IR Design Features Crossing angle is +/- 30 mrads Cryostat has a complete warm bore –Both QD0 and QF1 are super-conducting PM in front of QD0 Soft upstream bend magnets –Further reduces SR power in IP area BSC to 30  in X and 100  in Y (7  fully coupled) SR scanned to 20  in X and 45  in Y

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 6 Details of the permanent magnet slices – Z from IP Len. R1 R2 G –Name Beam m cm mm mm T/cm –QDPALER –QDPBLER –QDPCLER –QDPDLER –QDPELER –QDPFLER –QDPGLER –QPDHdrift0.371 –QDPIHER –QDPJHER –QDPKHER –QDPLHER –QDPMHER –QDPNHER –QDPOHER –QDPPHER –QDPQHER –QPDRHER –QDPS HER

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 7 Vanadium Permendur Design We allow for 3 mm of space for the coils (new information from Ivan – actually 2.6 mm) The central steel section can be very thin because the magnetic field in the steel is nearly cancelled from the twin windings The QD0 magnet is aligned as much as possible to the beam axis, however we must slant it with respect to the beam axis in order to accommodate the increasing horizontal size of the beam-stay-clear

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 8 Vanadium Permendur “Russian” Design

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 9 VP design details PM as described earlier Magnet QD0 QD0H QF1 QF1H IP face (m) Length (m) Angle wrt beam (mrad) G (T/cm) Steel aperture (mm) Max. Field (T)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 10 Air-Core “Italian” Design We replace the shared QD0 and QF1 parts of the VP design with the air-core design Also place QD0 and QF1 parallel to the detector axis Then we have the same field strengths and the LER and HER pieces are the same strength as the VP design

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 11 Air core “Italian” QD0, QF1 Picture Out of Date

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 12 AC design details PM as described above Magnet QD0 QD0H QF1 QF1H IP face (m) Length (m) Axis offsets (mm) Angle wrt beam (mrad) G (T/cm) Aperture (mm) Max. Field (T)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 13 SR power (VP design)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 14 SR power (AC design)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 15 Current IR Analysis Status SR backgrounds are under control SR power inside the cryostats looks managable Beam-gas, Touschek and Coulomb backgrounds are under control (see Manuela’s talk) Beta functions are reasonable Preliminary designs for solenoid compensation –Magnetic fields (Bertsche) –Lattice corrections (Nosochkov)

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 16 SVT and MDI Good progress –Filippo Bosi has developed an initial layout of SVT hardware and has an initial design of the Be beam pipe with vacuum connecting flanges –Cable layout and how the SVT signals and power lines get in and out needs to be developed –The W shield (with/without) noses also needs to be incorporated

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 17 Next Steps in the IR Design Permanent Magnet Study –Model the PM slices and make sure that the design parameters can be achieved Computer model used for the PEP-II magnets can tell us dimensional, positional and strength tolerances Mechanical engineer to design fixturing for magnet slice assembly and installation

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 18 Cryostat Design Pasquale Fabbricatore has taken a first look at the cryostat and magnet designs (presentation follows) –We may need to give him more space –Probably more z space – this will alter the magnet designs –Need to generate a new IR design with these engineering constraints –Need to get an initial estimate because this impacts the inner diameter of the DCH

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 19 Cryostat supports Need an engineer to start looking at how the cryostats are supported –Involves the detector steel and how we get rapid access to the SVT and central Be chamber –Vibration control –Also involves how the cryogenic plant hooks up to the cryostats – can we keep the cryostats cold when performing a rapid access

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 20 Summary We have a good IR design that meets our requirements Now we welcome the engineers that can come in and tell us what is impossible Then we need to decide how to change the design with the guidance of the engineers so we can still build what we want We may have to compromise some of the IR parameters…

SuperB Meeting XVII May 28 – June 2, 2011 IR design status 21 Conclusion We are at a good starting point The parameter space of the IR has been studied fairly thoroughly giving us some sense of possible change directions The next round is to now work with the engineers and together figure out how we can actually build what we want and need This also involves the detector so stick around for the next session!