HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Workflow Session Pier Giorgio Marchetti European Space Agency
Advertisements

0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Page 1 Federated Earth Observation (FedEO) Status CEOS WGISS Meeting #40 28 Sep – 02 Oct, 2015 Harwell, UK Hosted by UKSA M.Albani, P.Mougnaud, A.Della.
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
HMA-FO ODA, February 2010 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Preliminary.
® Sponsored by Architecture DWG 98th OGC Technical Committee Washington, DC USA Carl Reed, Joan Maso 10 March 2016 Copyright © 2016 Open Geospatial Consortium.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 AR Meeting 15 July 2009 S. Gianfranceschi, Intecs.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
Evolution and Perspectives for SSE Y. Coene, Spacebel s.a. M. Gilles, Spacebel s.a ESA - ESRIN, Frascati, Rome.
Page 1 Arnaud Cauchy, Airbus Defence & Space 11th of June 2014 ESA HMA-S Project DDR Meeting WP6100 – WPS2.0 Specification HMA-S Final Presentation – WP6100.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
HMA-S Project User Management for EO Services OGC r9
HMA Identity Management Status
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
DREAM High-Level Architecture
CEOS OpenSearch Project II
HMA Follow On Activities
WPS updates from ESA Projects
Ordering Services for EO Products SWG ATS / ETS
HMA Identity Management Status
HMA SPS Mandatory I/F Development
Ordering Services for EO Products SWG ATS / ETS
GeoJSON(-LD) Encoding of Granule Metadata
SMAAD Project Summary SMAAD Final Presentation – updated for
CEOS OpenSearch Project II
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
CEOS OpenSearch Project II
Contributions to Testing and Reference Data
HMA Follow On Activities
Standardisation Status Update
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
HMA for Science Cataloguing of ISO Metadata (CIM) using the ebRIM
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
CITE tests for and HMA-T Phase 2 Progress Meeting
CEOS OpenSearch Conformance Test Document
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
CEOS OpenSearch Project
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
EO profile for WMS progress report
Presentation transcript:

HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium Ltd.

HMA AWG, 6 November 2013 Slide 2 Overview  Task 1 - Project Management: Schedule Standardisation status RID status  Task 2/3/5 Demonstrator Status  Dedicated presentations Task 2 – Identity Mgt Task 4 – OpenSearch Task 6 – Web Processing Service Task 7 – Feasibility Analysis

HMA AWG, 6 November 2013 Slide 3 EventDateLocationName MTR (PR4)25/09/2013ESRIN (Frascati) Mid-Term Review PR506/11/2013 Demonstrator FAT PART 1 19/12/2013Webex Objective: Acceptance of Task Technical Notes and associated Demonstrator Software. Task 2, 3, 5, 7. Task 4: limited to Search. Demonstrator FAT PART 2 TBDWebex Objective: Acceptance of Task Technical Notes and associated Demonstrator Software. Task 6 and Task 4: limited to Order and Download. PR61/02/2013 Testbed FATIntended to be incremental. Latest: 1/02/2014. Webex Note: TestBed is full set of Demonstrator VMs at ESA including TEAM engine loaded with ETS scripts. To be discussed. Objective: acceptance of ETS, ETS Test Reports, TestBed and TestBed Technical Note. OGC TC (TBC) AR March 2014 Virginia (U.S.) ESRIN Participation of selected tasks to OGC TC TBC depending on availability of funds. FPJune 2014Collocated with OGC TC Schedule

HMA AWG, 6 November 2013 Slide 4 Task 1 – Project Mgt  Document deliveries since OGC TC Meeting Project Management Plan (PMP)HMA-S.ASU.D1000.1, Issue 1, Revision 2 DRAFT, 1/11/2013. OGC r7 OpenSearch Geo-temporal OGC r3 (30/10/2013) OpenSearch Extension for EO Products OGC (04/11/2013) OpenSearch Extension for EO Satellite Tasking

HMA AWG, 6 November 2013 Slide 5 Task 1 – Project Mgt  Issues Standardisation Task 6: WPS  Impact on ETS and Demonstrator development Demonstrator Task 4 « EO Data Access Protocol» OGC :  Needed for ETS development  Solution: ASU will provide additional demonstrator. OGC slow to implement Frascati OGC decisions  Carl Reed provided status: next slide. RID closure process not completed. Process should be accelerated.

HMA AWG, 6 November 2013 Slide 6  Carl Reed 31/10/2013:

HMA AWG, 6 November 2013 Slide 7 Task 1 – Project Mgt  Standardisation Plan Task 7: Feasibility Analysis (OGC ) uploaded on 4/11/2013 for vote in Mumbai.

HMA AWG, 6 November 2013 Slide 8 Task 1 – Project Mgt  Actions MTR: Total 53, Open 10 (19%). Now: Total: 83, Open 20 (24%).  RIDs MTR: Total 257 Now: Total 309 – Closed: more than 267. Open: less than 32. Recent document updates to be checked.

HMA AWG, 6 November 2013 Slide 9 Task 2 – Identity Mgt  Status: Demonstrator TN: completed. Being reviewed internally. Demonstrator:  CIM EP backend to be replaced by I15 EP backend when available.  CIM EP client to be updated to I15 EP in Task 5.  Issues: OGC DelegateTo specification alternatives. See separate slides.

HMA AWG, 6 November 2013 Slide 10 Task 3 – EOP O&M Metadata  Status: Demonstrator TN: draft. Demonstrator  Client: 50% –FEDEO endpoint used for early testing.  OpenSearch not yet available.  Issues: None.

HMA AWG, 6 November 2013 Slide 11 Task 5 – I15 EP  Status: Demonstrator TN: draft. Demonstrator  Client: to be  CIM EP bridge endpoint terra  CIM EP not yet available.  Issues: None.

HMA AWG, 6 November 2013 Slide 12 Task 8 – TestBed  Status: Machine for Demonstrators  Task 3 Demonstrator installed (with CIM EP instead of I15 EP).  Task 4 & 7 Demonstrator (VM) shipped by ASU to Spacebel. Machine for TEAM engine Draft HMA-S.SPB.D (TestBed Technical Note) prepared  Information from Final Demonstrator TN to be integrated when they become available.  Issues: None.