WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.

Slides:



Advertisements
Similar presentations
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Güralp Systems Ltd is a leading designer and manufacturer of seismological instruments, digitizers, acquisition modules and software.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
WP 3 : Technological innovation « MEditerranean Development of Innovative Technologies for integrAted waTer managEment » Kick-off meeting [7th-8th May.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Contributions to ELI-NP on RF accelerator activities Andrea Mostacci Università di Roma, Sapienza The joint Sapienza/INFN-LNF group is active in the field.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Undulator parameters choice/wish based on a simplified XFEL cost model Jürgen Pfingstner 29 st of July 2015.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 GdA_CLIC meeting  Research & Innovation Action  INFRADEV : Design studies INFRADEV : Design studies Project: “X-band technology.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Thesis: Introduction Study for a failsafe trigger generation system for the Large Hadron Collider beam dump kicker magnets prepared by Martin Rampl.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
FP7: EuCARD after a year of preparation… A.Jeremie.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
X-band Based FEL proposal
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Summary of modifications for WP3 TIARA preparation meeting; May 2010 Removed Sub-tasks:  Remove ‘Identification of Accelerator Research Areas’ (WP3.1.1.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuPRAXIA European Plasma.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
TIARA WP 7 Ionisation Cooling Test Facility (ICTF) Task 7.2 Novel Pulsed RF Power Amplifier Design.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
CALIFES A proposed electron beam test facility at CERN
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
WP11 – ANAC Report on First Semester
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
EuCARD2 WP11 Topical Meeting
UK X FEL Kick-off Meeting
Abstract EuSPARC and EuPRAXIA projects
Task T HTS Dipole Magnet Design and Construction
Uppsala Commitment to ESS and FREIA Planning
WP 17 Materials for Extreme Thermal Management (PowerMat)
SLS Vertical Emittance Tuning
It is all about extreme high acceleration gradients
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
ESS RF Development at Uppsala University
Task 2: High-gradient normal-conducting technology development
CEPC RF Power Sources System
CompactLight WP6 – Kick-Off Meeting
Presentation transcript:

WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End month36 WP TitleHGA (High Gradient Acceleration) Activity TypeRTD Objective Upgrade of SPARC Test Facility for High Gradient Acceleration studies of electron beams for SuperB and FEL projects Participant number78 INFNPSI Person-months 67  5428  24 20% cut 15% cut

Changes after budget cut One Subtask (9.1.1) cancelled: “design and construction of a SLED (pulse compressor)” Cut of Milestone 9.2 (SLED design) PSI will keep their Task on RF-LLE but implementation at SPARC will be performed by INFN personnel Keeping sub-contract with Rome University for 30 keuro  re-scoping their contribution with RF bench measurements and simulation of wake fields in accelerating structures New travel rate (650 euro/travel) Consequence of budget cut: lower final energy due to SLED cut (possible implementation after TIARA with other funds). This will not have impact on the main scope of the WP that is the test of the C-band Linac

New Tasks & Subtasks 9.1SPARC-UPStudy of SPARC upgrade in energy 9.1.1ACCP-DESDesign of a C-band accelerating structure prototype: simulation and optimization 9.1.3ACCP-CADDesign of a C-band accelerating structure prototype: preparation of CAD mechanical drawings 9.1.4ACCP-DESModifications of the accelerating structures design if needed after prototype test 9.2ACCP-CADModifications of CAD mechanical drawings if needed after prototype test 9.2RF-LLERF Low Level Electronics 9.2.1LLE-DESDesign of a digital LLRF electronics 9.2.2LLE-CONConstruction and test of a prototype at SPARC 9.3SPARC-CONConstruction and test of SPARC C-band section 9.3.1HGA-HDWAcquisition of necessary hardware and material 9.3.2ACC-PROTConstruction and test of an accelerating structure prototype with a reduced number of cells to be tested at high power 9.3.3ACC-CONConstruction, installation on SPARC of the final accelerating structures 9.3.4ACC-TESTTest of C-band upgrade at SPARC

New Deliverables NumNatShort nameDescriptionMonthPM D9.1PSPARC-CConstruction of accelerating structures2454 D9.2OSPARC-TCommissioning and test of the C-band Linac structure at SPARC 3524 NumNatShort nameDescriptionMonth M9.1OHARDW-AHardware acquisition6 M9.2RACC-DDesign of accelerating structures18 M9.3RRF-LLE-DDesign RF-LLE18 M9.4PRF-LLE-PFirst RF-LLE prototype24 New Milestones

New budget (k € ) INFN + PSIOriginalReducedCut (%) Personnel (PM) Travels (direct) Material (direct) Sub-contracting30 - Total cost

New GANNT chart