Paola TDAQ 13-09-2010 1 FTK STATUS (valid for both Option A & B) Paola Giannetti for the FTK collaboration  Work done for each milestone since the TDAQ.

Slides:



Advertisements
Similar presentations
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Advertisements

LAV contribution to the NA62 trigger Mauro Raggi, LNF ONLINE WG CERN 9/2/2011.
B triggering Fabrizio Palla INFN Pisa Consorzio CMS Italia Firenze 7 Sept
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
The ATLAS B physics trigger
Track quality - impact on hardware of different strategies Paola FTK meeting Performances on WH and Bs   2.Now we use all the layers.
1 N. Davidson E/p single hadron energy scale check with minimum bias events Jet Note 8 Meeting 15 th May 2007.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
DUAL-OUTPUT HOLA MAY 2011 STATUS Anton Kapliy Mel Shochet Fukun Tang.
Sept 30 th 2004Iacopo Vivarelli – INFN Pisa FTK meeting Z  bb measurement in ATLAS Iacopo Vivarelli, Alberto Annovi Scuola Normale Superiore,University.
1 Hadronic In-Situ Calibration of the ATLAS Detector N. Davidson The University of Melbourne.
Status of FTK simulation June 16,2005 G. Punzi, Pisa.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Simulation Tasks  Understanding Tracking  Understanding Hardware 1.Two types of tasks: a.Implementing known functions in ATLAS framework b.Understanding.
My work PAST WORKS: 1) (Madrid) Data Analysis in L3, LEP: - Measurement of the Mass, Width and Cross Section of the W boson production at LEP, Study.
FTK poster F. Crescioli Alberto Annovi
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Faster tracking in hadron collider experiments  The problem  The solution  Conclusions Hans Drevermann (CERN) Nikos Konstantinidis ( Santa Cruz)
September 30, 2004FTK meeting1 Making the FTK Physics Case M. Shochet 9/30/04.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
Selection cuts on Bs→ with FTK F. Crescioli, P. Giannetti, M. Dell'Orso, G. Punzi, G. Volpi 2/5/2006.
HERA-LHC, CERN Oct Preliminary study of Z+b in ATLAS /1 A preliminary study of Z+b production in ATLAS The D0 measurement of  (Z+b)/  (Z+jet)
Valeria Perez Reale University of Bern On behalf of the ATLAS Physics and Event Selection Architecture Group 1 ATLAS Physics Workshop Athens, May
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Simone Gennai SNS, INFN-Pisa1 Radion searches in CMS A first look to  hh G. Dewhirst, L. Fano, S. Gennai, S. Nikitenko.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
Physics at LHC Prague, 6-12 July, 2003 R. Kinnunen Helsinki Institute of Physics A/H ->  and H + ->  in CMS R. Kinnunen Physics at LHC Prague July 6.
ATLAS B-Physics Reach M.Smizanska, Lancaster University, UK
Alberto AnnoviFTK meeting - September 30, 2004 Ideas for a Fast-Track trigger processor - FTK... an evolution of the CDF Silicon Vertex Trigger (SVT) A.
FTKSim Status and plans FTK Meeting 07/13/2006 F. Crescioli, M. Dell'Orso, G. Punzi, G.Volpi, P. Giannetti.
M. Gilchriese Basic Trigger Rates December 3, 2004.
ATLAS Trigger Development
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Study on search of a SM Higgs (120GeV) produced via VBF and decaying in two hadronic taus V.Cavasinni, F.Sarri, I.Vivarelli.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Tommaso Boccali SNS and INFN Pisa Vertex 2002 Kailua-Kona, Hawaii 3-8 November 2002 High Level Triggers at CMS with the Tracker.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
La Thuile, March, 15 th, 2003 f Makoto Tomoto ( FNAL ) Prospects for Higgs Searches at DØ Makoto Tomoto Fermi National Accelerator Laboratory (For the.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Associative Memory design for the Fast Track processor (FTK) at Atlas I.Sacco (Scuola Superiore Sant’Anna) On behalf Amchip04 project (A. Annovi, M. Beretta,
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
Status of FTK Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Fabruary 2, 2010 Status & Evolution of FTK (impact on Italian groups) Schedule.
Global Costs based on TP (6-10 y): ~1150 K€ Italy ~1150 K€ USA ~200 K€ Waseda ~300+ extra K€ new institutions Costs for 2013 run ~400 K€ Italy ~500 K€
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Status of FTK Paola Giannetti INFN Pisa for the FTK Group ATLAS Italia November 17, 2009.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
New AMchip features Alberto Annovi INFN Frascati.
UPDATE ON HARDWARE 1 1.VERTICAL SLICE & COOLING TESTS 1.ONLY a TEST STAND or a SMALL DEMONSTRATOR ?? 2.CRATE.
Outline The Pattern Matching and the Associative Memory (AM)
Federico Lasagni Manghi - University of Bologna
IAPP - FTK workshop – Pisa march, 2013
FTK: update on progress, problems, need
The Associative Memory – AM = Bingo
FTK Update Approved by TDAQ in april
More technical description:
Project definition and organization milestones & work-plan
Cost &Personnel Estimates Project Organization
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Pending technical issues and plans to address and solve
Optical data transmission for
FTK variable resolution pattern banks
The Silicon Track Trigger (STT) at DØ
F. Crescioli, P. Giannetti, M. Dell'Orso, G. Punzi, G. Volpi
Commissioning of the ALICE-PHOS trigger
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Kohei Yorita Young-Kee Kim University of Chicago
Presentation transcript:

Paola TDAQ FTK STATUS (valid for both Option A & B) Paola Giannetti for the FTK collaboration  Work done for each milestone since the TDAQ approval o Software: Architecture study, improvement, understanding o Hardware advancement  For L2 triggers: as soon as FTK is approved, we will need L2 algo. update to profit of FTK early-available tracks (2013) 1. Optimize b, tau, and muon efficiency using tracks at the beginning of LVL2 2.New triggers to increase efficiency and searched phase space (2 examples) EM isolation only 60 and 120 MeV THs 60 MeV 120 MeV Pythia W→  2,6  (a)Use tracks before calorimeter if convenient (i.e. isolation) (b)Use more complex b-tag algos→large overlap with offline b-tag (c)Use new tau-tag algos→large overlap with offline tau-tag (d)What to do at EF when L2 selects high quality bs & taus?

Paola TDAQ t0= Atlas approval of TDAQ action → funds become available 1.Performance vs. Min P T at 3×10 34 on going3 months 2.Single track efficiency vs. beam offset done3 months 3.Investigate adding XON/XOFF to new HOLA done 4 months 4.Improve efficiency in the barrel/forward interface region advanced6 months 5.Performance versus dead channel fraction (wildcard option) just started 6 months 6.TSP simulation including varying-resolution pattern banks advanced 8 months 7.Optimization of clustering at 3×10 34 just started 9 months 8.Production readiness review for dual-output HOLA expected June 1112 months 9.Specify system size for 3×10 33, 1×10 34, and 3×10 34 on going12 months 10.Prototype in lab (EDRO & AM); start TDAQ integration on going 12 months 11.Handling FTK errors in level-2 and Event Filter 14 months 12.Studies with real ATLAS data just started 18 months 13.Select baseline design 18 months 14.Integrate FTKSim into ATHENA 18 months 15.TDR including tests of prototype boards 24 months Milestones associated to the TP

Paola TDAQ Milestone #1: Performance vs. Min PT at 3×10^34 Systematic studies started for the Min P T 1 - 1,5 - 2 GeV (Option B). 45 k 230 k 2,9 k 57 k 83 k Reduction of factors PT [1/GeV] Guido Volpi - Pisa Electron reconstruction compared to other 3×10^34 : they are not much worse than Muons & Pions NEXT: test performance losses on b and tau tagging, track- based isolation etc. etc. using offline analysis. Anton Kapliy & Yangyang Cheng Chigaco 1 st STEP 2 nd STEP

Paola TDAQ Milestone #2: Single track efficiency vs. beam offset Efficiency vs offset – used bank: 11L, 50x64x144, 100K events/point Jordan Webster - Chicago Typical x misalignment < 200  m Typical z misalignment < 10 mm d0 resolution 0, ,992

Paola TDAQ Milestone #3: Investigate adding XON/XOFF to new HOLA Anton Kapliy & Fukun Tang - Chicago Proposal for implementing flow control in the FTK fiber approved by S. Preliminary studies have shown we can use the cheapest Cyclone IV GX FPGA to: 1.host the modified LSC (link source card) firmware 2.directly use its internal transceivers/receivers (dropping the external SERDES). Anton: modify the firmware to allow for flow control from FTK side Fukun: will soon start the new board layout. We are on track for a fully tested prototype by June, 2011, with a CERN production readiness review shortly after that. Production & testing in time for installation during the 2012 shutdown.

Paola TDAQ Milestone #4: Improve  in the barrel/forward interface region Missing gap SCT pairs Missing any SCT pairs WH 10^34 Joe Tuggle - Chicago 1 ring of modules (all  ) at the larger  in the barrel and 1 disk at the smallest  in the forw. in the layers allowed to be missing

Paola TDAQ Milestone #6: TSP simulation & varying-resolution pattern banks Guido Volpi & Roberto Vitillo - Pisa Depth 0 Depth 1 Depth 2 PARENT PATTERN FAT ROAD Thin ROAD AM resolution TSP resolution We do have now a structured “pattern bank”, where each thin road is connected to its parent pattern in FTKsim. Ongoing tests for TSP algo after the RoadFinder (AMsim) in FTKsim; we have studied the bank composition and AM FAKE roads. AM Fake road is a AM matched pattern whose kids do not match the event Low probability to fire AM patterns: few kids (1 or 2): big advantage to test it at TSP resolution! All blank Half-SS can AM level as fakes TSP level the fake has good probability to be deleted LOW coverage patterns High probability to fire AM patterns (symmetric): many kids (up to 20 or more): no advantage to test it at TSP resolution! More than one kid can TSP level. Low probability to be a fake AM road HIGH coverage patterns KID 0 1

Paola TDAQ We can use don’t care on the least significant bit when we want to test the pattern AM resolution or use all the bits to test TSP resolution Test of AM patterns: 1.all single kid TSP resolution 2.For all few kid patterns use don’t care only for layers where both Half-SS are used by kids AM resolution (don’t care ) TSP resolution to exclude the right half in these layers Guido Volpi & Roberto Vitillo - Pisa All AM roads AM roads with at least 1 matched kid Fake AM roads # of kids 34 How to implement “variable resolution” in the AMchip AM pattern distribution vs Number of kids Majority of patterns with a single Kid TSP bank SS sizes: 48 (pix  ) – 40 (SCT) – 72 (pix z) AM bank SS sizes: 96 (pix  ) – 80 (SCT) – 72 (pix z) 2,8 M patterns in AM barrel 8 Mpatterns in TSP barrel AM & TSP Pattern Bank for 23 ev. pileup # of kids

Paola TDAQ Milestone #9: Specify system size..1×10 34 and 3×10 33 Concentrate now on (17-19 pile-up events) 2020 comes much later and will profit of a very advanced technology……. Sim with 75 pile-up events after 2020! 17,6 pile-up ,0 pile-up 10 34

Paola TDAQ Using the variable resolution in a new AM chip for WH (# of pile-up events = 23) Banks coverage ~ 95% 8.0 → 2,80 AM level (35%) per region (barrel only) 20 TSP → 7 AM level (35%) per region (all detector) Using TSP resolution in the AM bank for AM patterns with 1,2,3 kids: 3600 goes down to 1325 roads/AMboard → gaining a factor ~ 3! For a full detector FTK: less than 4000 out with a limit of less than 2000 out with a limit of Guido Volpi & Roberto Vitillo - Pisa FTK Demonstrator with old chip, barrel only: running now on 17,6 pile- up events to understand DATA FLOW → however we consider it a test, It is not necessary to have large margins for Even a small AMchip (12 mm 2 65 nm (MPW 80 k€) with variable resolution implemented, could do it, even without the TSP. Very low consumption DATA FLOW (Option A) assuming 16 AMboards in a core crate (numbers are for barrel only – a factor ~2,5 has to be applied for “all detector”): 3600 roads/AMboard of which 733 have a kid match at TSP level → 80% fakes

Paola TDAQ Milestone #10: Prototype in lab (EDRO & AM);TDAQ integration LAMB Standard cell chip FPGA for Roads P3 serial LVDS Control FPGA for SS Input Board Power consumption: 230 1,8 V 1V Phase 1 → 128 A today → 230 A Phase 1 Fast and dense connectors Thin powerful - FPGAs Prototype Crate able to provide 230 W Cooling tests – Rack design 4 48 V→ 1,8 -1,2 V DC – DC converters A output M. Piendibene Pisa Stabile-Andreani Milano A. Lanza Pavia Power/rack ~ 15 kW

Paola TDAQ Vertical Slice plan in Bologna: Bologna (EDRO) - Pisa (AMBoard) - Frascati (pixel clustering ) – Milano-Pavia (TSP-AMboard) Pixel clust. Fibers PC + Pseudo Hola Pixels Fired channels DO Roads + hits S-link SLink to PC or to other HW pieces (TSP)? A. Annovi M. Beretta LNF

Paola TDAQ nm 90 nm NEXT YEAR – MAY BE MARCH Mini-asic COULD be 90 or 65 nm THE AMCHIP04 PROTOTYPE Design: L.Sartori (Ferrara) M.Beretta (LNF) E. Bossini, F. Crescioli, I.Sacco (Pisa) Test: A.Lanza (Pavia) 90 nm miniasic

Paola TDAQ How to use FTK – new L1 & HLT selections - a couple of examples B S ->  ( x3 using soft second  ) B s  IP  ) Bs mass F.Crescioli-Pisa Athena + FTKsim Bs→  IEEE Trans. Nucl. Sci. 55, 145 (2008) LVL1: single  (Pt>6 GeV) LVL2 II  = track Pt>2,3,4,5,6 GeV II  i.p. (μ)>100um i. p. (Bs)<100um 4.8 GeV < M(μμ) < 6 GeV 30 fb-1 II  Pt>6 GeV 66 Bs ev. (|η|<1) 178 Bs ev. (|η|<2.5) II  Pt>3 GeV 230 Bs ev. (|η|<1) 546 Bs ev. (|η|<2.5|) LVL2 Backg. (bb in QCD – Pythia) Rate II  Pt>3 GeV O(10Hz)  Hadronic B Decay B look for 1 track or more with i.p.>100  m and search 2-track or multi-track B decays

Paola TDAQ S/√B ~ 23 (30 fb ) Learn about low Mass peaks: Z→bb, Z → tau tau ATL-COM-PHYS I.Vivarelli- ATLFast Z→bb LVL1: 3 jets Pt>80, 30, 30 GeV LVL2 tag 2 b-jet OR 2 tau-Jet min < Mbb or Mvis < max OR LVL1: 1 soft  (Pt>6 GeV) 2 soft jets Pt>25 GeV OR 4 soft jets for Hbb,Htt… LVL2 tag 2 b-jet or 2 tau-Jet OR 3 b-jet min < Mbb < max IEEE Trans. Nucl. Sci. 51, 391 (2004) ATL-COM-DAQ b (or tau) Leading Jet (PT>80 GeV) Boosted Z→ bb Mbb GeV QCD bb background Trigger bias

Paola TDAQ Conclusions The LHC schedule is more clear: we will have 75 pile-up events in 2021! The new LHC schedule + “variable resolution pattern” results favors a new 65 nm AM chip implementing the new features soon, possibly being sufficient up to 2019 (42 pile-up events)+ a new version for 2021 (above 75 pile-up events) A lot of work has been done, much more is needed – we need interaction with the TDAQ for HLT selections It is important to measure on data the background rates & update the L2 – EF selections