NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (<100,000) –Industries –Construction sites <5 acres Phase II in 2003 –Small urban areas.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

MS4 Permit and Storm Water Management Program Overview
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
STORMWATER Did you know? From anywhere in Grand Rapids, it takes just 15 to 30 minutes for stormwater to get to a water body. The following slides show.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
Middle Tennessee State University
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Upper Merion Township’s New Storm Water Management Program
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
Env 247 Overview of Stormwater Management March 1, 2011.
South Carolina Stormwater Forum Current Practices in South Carolina.
Tracie Belongia CMS4S, Hancock County. Surveyor’s Office Health Department County Highway GIS SWMD SWCD.
Greg Stabach and Kim Adams Rogue Valley Council of Governments January 21 st, 2015 Rogue TMDL Meeting.
The Dirt on Water Pollution. What is a Watershed? All the water and the land area that “sheds” its water into a particular river, bay, or ocean.
National Pollutant Discharge Elimination System(NPDES) Permit.
NPDES Stormwater and the Town of Wrightsville Beach.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
TOWN OF NEW CASTLE PHASE II ANNUAL STORMWATER REPORT GP Effective May 1, 2010 Expires: April 30, 2015 Reporting Period: March 10, 2014-March 9,
NPDES Compliance with Phase II Storm Water Regulations San Francisco Bay Regional Water Quality Control Board Tobi Tyler, Water Resources Control Engineer,
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
MDOT Storm Water Management Plan Module 1: Introduction to Storm Water Management Together… Better Roads, Cleaner Streams.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
Stormwater Pollution Prevention Training
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
North Hennepin Community College MS4 Plan October 24, 2014.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Why STORM?. New NPDES Permits Changes to Phase 1 & Phase 2 Public Education & Outreach Requirements from 2007 permit Handout.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Iowa Certified Construction Site Pollution Prevention Inspector
Sacramento County Stormwater Quality Program
Stormwater Management Program
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Sacramento County Stormwater Quality Program
Presentation transcript:

NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (<100,000) –Industries –Construction sites <5 acres Phase II in 2003 –Small urban areas (1,000 people/mi 2 ) –Construction sites of 1 acre or larger $50,000 /violation/day fines

Identify sources of illicit discharges and how they enter the stormdrain network before they happen…  Septic waste  Car Wash waste water  Pet Waste  Industrial Discharges  Household toxic substances  Anything that is not stormwater Must also map stormwater system, develop rules prohibitng discharges, and educate public on BMP’s Illicit Discharge Detection & Elimination

Must develop and implement an Erosion and Sedimentation (E&S) control program. Must include an plan review program, inspection program. Construction Site Runoff Control

Post Construction Runoff Control Develop and implement strategies to insure that development used BMP’s to reduce quantity and improve quantity of stormwater entering streams.

-Increase Support -Increase Compliance - Impacts of stormwater discharges on local waterbodies - Steps to reduce stormwater pollution Examples: school programs, storm drain stenciling, fact sheets, civic group education, mass media Mobile Public Information Booth Public Education & Outreach

Public Participation & Involvement - Broaden public support - Enhance expertise Examples: Public meetings, volunteer monitoring, community clean-ups, storm drain stenciling, rain barrel projects, pesticide disposal, amnesty days

-Training staff (education) -Reducing fertilizer, pesticides, salt - Catch-basin cleaning NPDES - Pollution Prevention/ Good Housekeeping

Regulations for Developers

- Local Ordinances - The Georgia Erosion and Sedimentation Act of NPDES General Permits Construction Issued September 2005

What About Rural Areas?

Agriculture Exempt from most Stormwater Regulations Exempt from GA E&S Regulations NPDES on buildings >1acre CAFO Regulations Clean Water Act Safe Dam Act Land Application Wetlands protection TMDL Civil liability