Dr. B.P Das Expert Consultant FAO, UN Former Engineer In Chief & Chief Advisor Department of Water Resources, Odisha Former Vice Chairman, EAC for River.

Slides:



Advertisements
Similar presentations
HYDRO POWER AND ENGINEERING MARVELS
Advertisements

Presentation Texas Water: What You Should Know November 6, 2010.
Environmental Flow Issues in Ganga Basin ByN.N.Rai Director, Hydrology Central Water Commission.
HYDRO-LOOK FOR THE ARABIC - ISRAELI CONFLICT Dr.Sahar Ahmed Haridy Cairo University, Faculty of Engineering, Hydraulics and Irrigartion Department.
Engineering Hydrology (ECIV 4323)
Fluctuation in Rainfall Variance in rainfall in Singapore.
Water for Nature in the Downstream Areas DR. BASHIR AHMAD.
Spatio-Temporal variability of Water resources in the Ganga basin By Subashisa Dutta Associate Professor DEPARTMENT OF.
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Inter Provincial Water Distribution and the Need for Reservoirs” Rao Irshad Ali Khan Member IRSA Punjab December.
The Ganges Water Conflict Prof. Hem Raj Subedee, Ph.D. Conflict, peace and department studies Tribhuvan, University Kathmandu, Nepal.
Ganga Basin Hydrologic Regime – Environmental Flow Perspective World Bank and INRM Consultants New Delhi February, 2015.
Okavango Basin Abigail Tomasek. Okavango Basin Approximately 1600 km long Majority of basin undeveloped and one of.
rd International Commission on Irrigation and Drainage, Executive Council Meeting, 7 th Asian Regional Conference And Irrigation Australia 2012.
Nile Hydrology Preliminary Research Anthony Makana Paris
1 Module 2 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
Do Now: We know that groundwater and river basins alone do not contain enough water to meet our present needs. Are there any ways that we can harvest the.
1 “TRANSBOUNDARY WATER COOPERATION IN CENTRAL ASIA” Dr. Saghit Ibatullin, Chairman Executive Committee of International Fund for saving the Aral Sea.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Environmental flows in IWRM Mike Acreman. IWRM goals Economically efficient water use Assessments of supplies, sound allocation, efficient technologies.
Deksyos Tarekegn National DSS Specialist - Ethiopia
Water Resources Development In Central Part Of India By Arthee.V Bte
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Hydro Electric Power Plant
Climate Change, Extreme Floods, and Dam Safety in Korea
Sediment Issues within Transboundary Basins Presented by Paul Bireta and Fernando Salas April 12, 2012.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Steering Committee 12 November Integrated Water Resource Management and its implications for the energy sector in Tajikistan PPCR Workshop on Climate.
The Jordan River Basin Fall Overview Location and History Importance of the Jordan Basin Problems in the Jordan Basin History behind the conflict.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Ms. Reba Paul, Bangladesh Water Partnership Bangladesh Water Partnership 2.3 billion people live in river basins under ‘water stress’(
The Aral Sea An Ecological Disaster. Where in the World?
Assessment and planning of the water resources under various scenarios in the Ganges and Indus basin: Glaciers contribution and WEAP modelling Devaraj.
Assessment Statements – Describe and evaluate the sustainability of freshwater resource usage with reference to a case study.
Indian Water Resources – An Overview
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
National Law Regarding the Environmental Conservation and the Challenges to Implement the Law Presented by Mr. Paw Khine Than Director Supreme Court of.
Water Resources in the Indus-Gangetic Basin
Impact of Climate Change in the Non- Glacial Fed Himalayan River System: A Case Study From the Kosi River in District Almora, Uttarakhand State (India)
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer.
Why river linking project in India INDIA having total land area is 3,287,263 sq km in this Irrigated land is only 558,080 sq km, rest of the land are un.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Aral Sea Basic Facts/Recap Once the fourth largest freshwater sea in the world at over 26,000 sq. miles, the words Aral Sea mean Sea of Islands. Served.
Why Groundwater is used? 1.Accessible to large number of users at an affordable price 2. Less capital intensive than surface water and is not dependant.
Multi purpose river projects and Integrated water resources Management Std X CBSE As per NCERT geography textbook Contemporary India II Dam – it!
HYDROLOGY AND WATER RESOURCES ENGINEERING PARUL INSTITUTE OF ENGINEERING & TECHNOLOGY. Semester:- 5 th Branch:- Civil Engineering.
Role of Storage in River Rejuvenation & Sustaining E-flow By Vinay Kumar Chief Engineer, Central Water Commission &N.N.Rai Director, Hydrology (NE) Central.
MULTIPURPOSE RIVER VALLEY PROJECT.
NATIONAL HYDROLOGY PROJECT CENTRAL WATER COMMISSION.
INDIAN INSTITUTE OF TECHNOLOGY ROORKEE India Water Week 2015 April 05, 2016 ARUN KUMAR Professor and MNRE Chair Professor Alternate Hydro Energy Centre,
TEHRI DAM & RESERVOIR River Discharge: 30 to 7500 Cumec Design Flood: 15,540 Cumec Gross Storage: 3,540 MCM Live Storage: 2,615 MCM Mean.
1 Storages and Environmental Flows Sharad K Jain National Institute of Hydrology, Roorkee
Development of River Basin Models for Investigation of Improved Water Management Options: Case Study of the Upper Godavari Basin in India Dr A.S. Garudkar,
Interlinking of rivers as an adaption strategy to address the impact of climate change on water resources Sustainable Lifestyle = Positive.
BASIN PLANNING & MANAGEMENT ORGANISATION, CENTRAL WATER COMMISSION
Presentation on Ken – Betwa Link Project-Phase-II
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Inter Provincial Water Issues − Challenges and Opportunities ”
ASSESSMENT OF ENVIRONMENTAL FLOWS FOR THE TAPI RIVER BASIN, INDIA
NO PLACE FOR US DAMS IN INDIA.
Integrated Water Resources Planning for optimal benefits to the society Panel Discussion-3 India Water Week 2017.
Devastation of Ganga Basin in Uttarakhand in June 2013;
The Aral Game.
Unit 4.4: Water Resources What causes water shortages?
Interference with the water cycle
THE COASTAL PLAINS.
Preciptation.
Presentation transcript:

Dr. B.P Das Expert Consultant FAO, UN Former Engineer In Chief & Chief Advisor Department of Water Resources, Odisha Former Vice Chairman, EAC for River Valley & HE Projects, MoEF Chairman, Expert Body for studying Uttarakhand Disaster, MoEF Eco-system Benefit Rendered by Large Hydro Projects of India & Consequential River Rejuvenation

ROLE OF WATER STORAGE IN RIVER REJUVENATION AND SUSTAINING E-FLOWS Ecosystem benefit rendered by large Hydro Projects of India and Consequential River Rejuvenation Brain Storming Session-1 Dr. B. P. Das Former Chief Advisor & Engineer-in-Chief, WR, Odisha Former Vice Chairman, EAC for River Valley & HE Projects, MoEF Chairman, Expert Body for studying Uttarakhand Disaster, MoEF Chairman, Monitoring Committee, Indira Sagar & Omkareswar Command Area in Narmada Basin, MoEF Expert Consultant to FAO April 5, 2016

General Note Dams constructed across rivers for multiple uses result in abstraction of a large proportion of freshwater to meet consumptive use. Consequently the riverine reach below the dam gets deprived of its need to sustain the aquatic ecosystem particularly in lean season. While this is generally true for heavily harnessed rivers in arid basins, such as Amu- Darya, Syr-Darya draining to Aral Sea, Colorado, Indus and Nile the situation is absolutely different for tropical rivers in India in general and peninsular rivers in particular. The benefit to the river for sustaining aquatic biodiversity and general riparian use is presented for a few typical multipurpose projects of India.

General Note For rivers harnessed in peninsular India, 20% of MAF flows in non-monsoon in the riverine reach below dams against 5- 10% MAF that was flowing prior to construction of dams. This is substantiated by reference to pre and post dam hydrological scenario for two large dams in Odisha, Hirakud Dam on Mahanadi and Rengali Dam on Brahmani, Nagarjuna Sagar and Srisailam Dam on Krishna. Positive contribution of major dams in India to riverine health and sustenance of aquatic ecosystem in addition to enhancing the capability of the downstream reach to meet industrial / drinking water need and flushing out pollutant is established. For major dams almost 32-50% of the monsoon flow gets impounded in reservoirs & stored water at end of monsoon gets released after power generation synchronizing with Rabi / Summer irrigation need of the downstream. The estuarine region of the harnessed river is particularly benefited.

General Note Benefit of Farakka Barrage The Farakka Barrage across river Ganga in Murshidabad district of West Bengal was constructed in 1970 to replenish the freshwater flow in river Hoogly for improving navigability to Calcutta port. The feeder canal from Farakka brought in 850 m3/s perennially into Hoogly estuary, feeding the Sundarban mangroves, which forms the largest chunk of 4,000 km2 in India. As Ganga (Padma) flowed to Bagladesh causing dearth of freshwater the mangroves were slowly perishing, with salinity increasing to ppt, detrimental for the mangroves. With increased freshwater flow from Farakka barrage, not only the mangroves flourished due to decrease of salinity by ppt but also the fishery production went up from 7,000 Ton (1970) to almost 70,000 Ton currently attributable to the healthy mangroves in the Sundarban.

Mahanadi Basin Hirakud Dam

Non-monsoon Flow Below Hirakud Dam Hirakud Dam intercepts 83000km2 of 1,48,000km 2 of overall basin Mean Annual Flow 50 MAcft Monsoon Flow 47 MAcft Non-monsoon (without Hirakud Dam) 3 Macft Non-monsoon flow ( ) deduced from Hirakud data Macft Post Dam non-monsoon flow actual( ) 5 Macft Comparison of actual/derived flow at delta head in pre & post dam situation

Brahmani River Basin Rengali Dam

Non-monsoon Flow Below Rengali Dam Rengali Dam intercepts 25,250km 2 of 39,268km 2 of overall basin Mean Annual Flow 20,000Mm 3 Monsoon Flow 18,000Mm 3 Non-monsoon (without Rengali Dam) 2,000Mm 3 Non-monsoon flow( ) would have been 1123Mm 3 Post Dam non-monsoon flow actual( ) 3434Mm 3 Comparison of actual/derived flow at delta head in pre & post dam situation

Krishna River Basin Nagarjunasagar dam

Non-monsoon Flow Enhancement in Krishna Basin Basin Area – km 2 Annual yield of Krishna River – 78100Mm 3 (CWC) Bachawat Award(1976) accepted 75% dependable yield as 63900Mm 3 Non-monsoon flow of Krishna River – 6409Mm 3 Two Mega Projects in Andhra Pradesh Nagarjunasagar intercepts km 2 Mean annual flow 42360Mm 3 (CBIP) Live storage of 6940Mm 3. Srisailam intercepts km 2 Mean annual flow 52160Mm 3 Live storage of 7080Mm 3 Major Projects in Karnataka Hipparagi Barrage, Alamatti Dam, Narayanpur Dam, Tungabhadra Dam Major Projects in Maharastra Koyna Dam

Post monsoon Study of Krishna Basin Nagarjuna Sagar (Operational 1974) As on 31 st Oct. live storage available is 6940 Mm 3 Srisailam(Operational 1984) As on 31 st Oct. live storage available is 7080 Mm 3, Which flows down to Nagarjuna Sagar excluding an abstraction of maximum 200 Mm 3 in the non-monsoon Consumption Rabi requirement for ultimate command areas of 1 Mha of Nagarjuna Sagar is about 2000 Mm 3. Overall flow available at Nsagar is around 13000Mm 3. Average flow below Nagarjunasagar Dam upto Krishna barrage Non-consumptive water available11000Mm 3 Add D/S contribution of 44000km 2 and return flow3500Mm 3 On the average almost Mm3 flows from NSagar dam to Krishna barrage at Vijayawada (in the post 1985 period) against 7000Mm3 prior to construction of the dam helping the aquatic environment and significantly stabilizing the delta command.

Enhancement of Non-monsoon Flow in Krishna Basin

Conclusion Hydrological basin studies of three major east flowing rivers, Mahanadi, Brahmani and Krishna have been presented. It is clearly established that in predam situation the tail reach of the rivers used to convey 5 to 15% of the annual flow with insignificant flow during summer months March through June. After impounding by the dams the non-monsoon release and the downstream basin contribution have resulted in substantial increase (20-25% of the mean annual flow) helping the aquatic environment of the entire riverine reach in the downstream. The major dams are thus contributing positively to river rejuvenation and aquatic environment.

THANK YOU