Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Friday 15th June 01:11 Injection.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Friday 31st August & night
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 20 March 2012.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Monday 3rd September - morning
Saturday 3rd November - morning
Tue/Wed 12/ :00 Probe beam back again
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Saturday 24 September 2011.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Wednesday 26 October 2011.
Saturday 26 November 2011.
Tuesday
Tuesday
Presentation transcript:

Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because the BLMs in IR7 were above dump threshold (114%).  The losses were caused by the trajectory perturbation caused by the missing LR beam-beam kicks (as expected) Fill 3121: ~150 pb-1 in 11h52m Ramp-down  The ventilation door UL24 has been checked and was found to be properly closed.  Additional door one level above it was not checked… sorted by Ghislain later in the afternoon LHC status

Tuesday 3 rd October - afternoon 16:17 beam dumped in ramp by LBDS internal error Start short access at point 2 (for ventilation door) and point 6 for LBDS  Again having problems with key distribution at PM25. Need to switch to automatic mode in order the key drawer to open. Call access specialist.  Same problem seen at PM65 (need to give access in automatic mode)  Access problem (for key distribution in restricted mode) was checked by J-F Juget, but still remains to be solved. Access specialists to be called at next daytime access, to continue tests. LHC status

Tuesday 3 rd October - afternoon LBDS trip due to a corruption of the MKD-B1 internal safety ASIbus.  The result of this type of failure is a switch off of the mains electrical power distribution (trip of the top circuit breaker). Local rearm of the safety chain required in the tunnel.  Failure propagates to the TCDQ-B2 as both equipment share the same electrical distribution in UA63. 18:20 injecting again 19:26 Ramp started  Problem to keep chirp on at start ramp. Tune viewer appears to accept the chirp setting, but later slips back to a "none" status on the excitation.  Ramp without chirp, and numerous restarts of the QFB  Later tune acquisition freezes up  Re-boot BBQ front-end on flat-top – beams dumped LHC status

Tuesday evening 19:41 beam dumped on flat top after re-boot of BBQ front end  blocked B2 BBQ acquisition was just a symptom and pointing to a more severe problem and B1 would have probably been blocked soon after as well.  either related to a driver problem or blocked DAB card, since the acquisition could only be recovered after a hard VME reset and not via a simple restarting of the corresponding FESA class on cfv-ua47-bqp and/or GUIs.  The energy transmission after the restarted seemed to have been OK. The step in the RT trim functions is probably due to the first tune value being send to the OFC being wrong after the front-end restart. (should have stopped the Q-FB).  The reboot of the front-end was inevitable since any further deterioration could have disabled also the vital energy update for the OFC (which wasn't blocked btw.) LHC status

BBQ/ energy to OFC LHC status OFB was working with the wrong energy, leading of course to weird kicks in the ramp... Not healthy, but the orbit remained stable.

Tuesday 2 nd October - evening 20:40 Re-injecting  1.6E11/bunch. However we were just above the MKI B2 vacuum interlock threshold - injected all but one batch for beam2 22:30 Stable beams fill 3124  Initial lumi: 6.4e33 cm-2s-1 23:31 Beam dumped - cryogenic conditions lost in IT.R2  Cryo temperature on top of the current lead of RCBXV2.R2 stabilized (went to 400 K)and we had the OK from the cryo operator to start.  Precycling the IT.R2 while cryo operator checks the behaviour of the CL. MKB B2 faulty – piquet called  PLC of the MKB, an access (in the UA) is needed.  Ron + kicker piquet in PM65 03:05 dry dump as requested by the kicker piquet, all looks fine LHC status

Wednesday 3 rd October - morning 03:30 – injecting physics beam 03:50 beams dumped at 450 GeV  Trip of PC of RQTD.A34B1 – reset after checks We reboot also the cfv-ua43-bqpll.  During this reboot we have to restart also the process BQBBQLHC_M on cfv-ua47-bq  Tune acquisition back (NB problem earlier in evening) 05:45 Stable beams fill 3126  Initial luminosity: 7.16e33 cm-2s-1 LHC status

Miscellaneous Scrubbing run postponed until before MD4 following discussion in LMC yesterday afternoon  Schedule update today Access requests:  BSRT (3 hours)  Ralph – UA47  ATLAS (1 hour), TOTEM  Tobias – point 8 – quick one - diamonds EOF:  Bunch length variation OD  Batch by batch blow-up LHCb polarity change (?) Ventilation door S23 LHC status