Calculate Spending and Efficiency Variances ©1. Why So Much? ©2.

Slides:



Advertisements
Similar presentations
Verify Unit of Measure in a Multivariate Equation ©
Advertisements

Calculate Point Of Indifference Between Two Different Cost Scenarios
Calculate A Production Plan With The Inventory Chain Template © Dale R. Geiger
Calculate a Production Plan with the Inventory Chain Template ©
Calculate Probability of a Given Outcome © Dale R. Geiger
Calculate Point of Indifference Between Two Cost Scenarios
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Identifying Cost Relationships High-Low Method © Dale R. Geiger
Calculate Breakeven Point © Dale R. Geiger
Calculate Total Cost and Per-Unit Cost for a Given Production Volume ©1.
Calculate Schedule and Cost Variances with Earned Value Analysis © Dale R. Geiger
Identify Sensitive Variables through What-if Scenarios ©
Identify Sensitive Variables © Dale R. Geiger
Calculate Total Cost And Per-Unit Cost © Dale R. Geiger
Calculate Net Present Value © Dale R. Geiger
Calculate Total Cost And Incremental Costs © Dale R. Geiger
Calculate Volume and Performance Variances ©1. What Does it Mean?? 37 Best in class or worst? Best in class or worst? 37 out of 100? or 37 out of 37?
Calculate Volume And Performance Variances © Dale R. Geiger
Flexible Budget, Overhead Cost Variances and Management Control
Calculate Expected Values © Dale R. Geiger
Define Governmental Operating Activities © Dale R. Geiger
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Calculate Financial Position © Dale R. Geiger
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Calculate Expected Values of Alternative Courses of Action 1.
Verify Unit Of Measure In A Multivariate Equation © Dale R. Geiger
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Calculate Present or Future Value of Cash Flows © Dale R. Geiger
Explain Causes of Variances with the Reconciliation Format ©1.
Calculate Present or Future Value of Cash Flows ©
MCS UNS chapter 6 :Variance Analysis
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
Allocate Single Cost Pool to Users 1. Have you ever been here? 2.
Calculate Economic Order Quantity © Dale R. Geiger
Hanson Inc. has the following direct material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 1,700 pounds of material.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 PowerPoint Author: LuAnn Bean, Ph.D., CPA, CIA, CFE Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Explain the Impact of Poor Cost Information © Dale R. Geiger
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Flexible Budgets, Direct-Cost Variances, and Management Control Dr. Hisham Madi.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Calculate Economic Order Quantity © What do you think? Corporal O’Reilly, the supply clerk, knows that it costs the Army money to generate a purchase.
Chapter 17 Overhead Cost Management Flexible Budgets.
11th Edition Chapter 11.
STANDARD COST.
Flexible Budgets and Overhead Analysis
Explain Causes Of Variances With The Reconciliation Format
Flexible Budgets and Overhead Analysis
Verify Unit of Measure in a Multivariate Equation
Calculate Spending and Efficiency Variances
Calculate a Production Plan with the Inventory Chain Template
Calculate Volume and Performance Variances
Calculate Schedule and Cost Variances with Earned Value Analysis
Explain the Impact of Poor Cost Information
Calculate Spending and Efficiency Variances
Recommend Investment Course of Action Based on NPV Calculation
Calculate a Production Plan with the Inventory Chain Template
Cost-Benefit Analysis Training: APS Case Study (cont’d)
Calculate Projected Costs with the Cumulative Average Learning Curve
Calculate Breakeven Point in Units and Revenue Dollars
Variance Analysis Chapter 10.
Calculate Expected Values of Alternative Courses of Action
Flexible Budgets and Overhead Analysis
Demonstrate After Action Review Proficiency Role Playing Exercise
Demonstrate After Action Review Proficiency Role Playing Exercise
Presentation transcript:

Calculate Spending and Efficiency Variances ©1

Why So Much? ©2

Terminal Learning Objective Task: Calculate Spending and Efficiency Variances Condition: You are training to become an ACE with access to ICAM course handouts, readings, and spreadsheet tools and awareness of Operational Environment (OE)/Contemporary Operational Environment (COE) variables and actors. Standard: with at least 80% accuracy Identify root causes of Spending and Efficiency Variances Identify and enter relevant scenario data into macro enabled templates to calculate Spending and Efficiency Variances ©3

Why So Much? ©4

Getting to the Root Cause Imagine that in a normal week of driving you expect to use 20 gallons and you planned on spending $4 per gallon ©5

You Actually Spent You cut down on driving last week and the pump registered only 18 gallons, but the cost per gallon went up to $5 Note that your total variance is $10 unfavorable ©6

What if No Price Change? ©7

How Did Price Impact? ©8

Putting it All Together note that the net of efficiency and spending variance equals the total variance © 9

Relating to Volume Variance plansales volumeflexibleperformanceactual varianceplanvarianceresults unitsfcst=actual= price/unitfcst= =actual salesfcst===actual variable/unitfcst = =actual variable costfcst===actual fixed costfcst= =actual profitfcst===actual flex budgetefficiencyintermediatespendingactual results variable costvarianceproductvariancevariable cost =∆= ∆= resource quantity should have usedactually used XXX price per resource should have paid actually paid Efficiency and Spending Variances are going one level deeper in trying to understand the root cause of the variable cost change © 10

Other Applications There are many, many application of spending and efficiency variances People cost is hours*rate/hour Material cost is parts*cost/part Tank Maintenance is miles*cost/mile There are many other types of variance Some of which are useful in certain circumstances All of which follow the same logic you have learned here ©11

Learning Check What does the efficiency variance reveal? The spending variance is favorable but the efficiency variance is unfavorable. How would you describe the situation? ©12

Exercises Evaluate Efficiency and Spending Variances for each of the scenarios below: ©13

Gasoline Example ©14 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Gasoline Example ©15 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 1000 gallons * Price should have paid * Price should have paid * Price actually paid $4/gallon $4000

Gasoline Example ©16 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 1000 gallons 1200 gallons * Price should have paid * Price should have paid * Price actually paid $4/gallon $3.9/gallon $4000 $4680

Gasoline Example ©17 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 1000 gallons1200 gallons * Price should have paid * Price should have paid * Price actually paid $4/gallon $3.9/gallon $4000($800)$4800 $120$4680

Staff Example ©18 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Staff Example ©19 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid $50 $2500$500$2000 0

Maintenance Example ©20 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Maintenance Example ©21 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 600 miles * Price should have paid * Price should have paid * Price actually paid $20/mile $25/mile $12,0000 ($3000)$15,000

Editing Example ©22 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Editing Example ©23 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 200 pages350 pages * Price should have paid * Price should have paid * Price actually paid $5/page $6/page $1000($750)$1,750 ($350)$2100

Electricity Example ©24 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Electricity Example ©25 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 150 kw120 kw * Price should have paid * Price should have paid * Price actually paid $.3/kw $.5/kw $45$9$36 ($24)$60

Telephone Example ©26 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Telephone Example ©27 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 400 min550 min * Price should have paid * Price should have paid * Price actually paid $.2/min $.15/min $80($30)$110 $27.50$82.50

Food Example ©28 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used * Price should have paid * Price should have paid * Price actually paid

Food Example ©29 Projected Cost Efficiency Variance Intermediate Product Spending Variance Actual Cost Resource level should have used Resource level actually used 2000 cal2500 cal * Price should have paid * Price should have paid * Price actually paid $.05/cal $.04/cal $100($25)$125 $25$100

Spreadsheet Exercises ©30