LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.
Advertisements

Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Dmitry Kayran Beam commissioning.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Report Technical Director Storage-Ring-Installation Completed
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
Beam Commissioning Adam Bartnik.
PIs: Riad Suleiman and Matt Poelker
Injector Performance Requirements Conventional Facilities Update
The Cornell High Brightness Injector
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
Center for Injectors and Sources
R. Suleiman and M. Poelker September 29, 2016
PIs: Riad Suleiman and Matt Poelker
Advanced Research Electron Accelerator Laboratory
PIs: Riad Suleiman and Matt Poelker
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6 2 (up to 2.6??) Cooling sections 2x20 m Charge per ion bunch 3 nC (30x100pC) 3 nC (30x100pC) RMS norm. emittance < 2.5 um <2.5 um Average current 30 mA

LEReC layout 63.9 m to IP2 e- e- Beam Dump 20° Bending Magnets COOLING in Blue RHIC ring in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e- Gun 704 SRF Booster Cavity 2.1 GHz Cu Cavity 9 MHz Cu Cavity 704 MHz Cu Cavity Commissioning Diagnostic Line 1 Diagnostic Line 2 RHIC TRIPLET RHIC DX 180° Bending Magnet e- e- LEReC Solenoids Compensating (LF) Matching (HF) Merger/Transport

LEReC Meetings LEReC Beam Physics & Lattice LEReC Cathodes: usually Fridays bi-weekly C.J. Liaw, JT LEReC DC Gun: Phone conference with Cornell usually Fridays, bi-weekly C.J. Liaw LEReC DC Gun to Booster Cavity: bi-weekly, S. Nayak LEReC Booster Cavity Modification, K. Smith LEReC Diagnostic Beam Line: weekly, K. Smith LEReC warm RF Cavities: Vendor phone conferences, tuner and window design, A. Zaltsman LEReC beam diagnostics: weekly, T. Miller LEReC transport and cooling beam lines: bi-weekly, JT Cooling section loose ends, transport instrumentation (for DC Gun)

Updated LEReC Org chart

Cooling Section Installation RHIC Components moved and operational in their new locations! Cooling section vacuum and magnets installed. Work to complete: Profile Monitors (4) assemble and test Emittance slits (2) assemble and test BPM buttons – 2 damaged during installation Emittance slit vacuum chamber leak

Cooling Section 2016 or 2017 Installations Standard Profile Monitor Assemblies (4) (2 chambers held for drive testing) 180o Magnet Assembly Magnet (magnetic measured) Hybrid PM/ES/BPM Assemblies (2) Vacuum chamber (measured) Magnetic field monitoring (characterized) Stand (non-moving) Bellows assemblies Add Std. BPM/ move solenoid Emittance Slit Assemblies (2) (Chamber held for drive testing) Magnet shielding test assembly April DOE Review: Test Set-ups Complete

2016 Schedule Update Installation of the DC eGun in 02:00 to commissioning with beam during the 2017 RHIC run has become the project priority. Cathode insertion mechanism/develop a cathode production system DC eGun to Booster cavity transport line. Laser transport, laser table with temperature control, communications Controls, communications, MPS, ACS, trays, water, power, cleanrooms Temporary beamline in place of the Booster cavity. First section of the high energy transport line: magnets, PS, vacuum, etc. First diagnostic line with faraday cup/beam dump.

DC Gun & Commissioning Transport Line ERL Beam Dump 20° dipole Merger Solenoid LEReC Profile Monitor ERL Emittance Slit 2.1 GHz Cavity 704 SRF Cavity (not installed) ERL Solenoid? DC Gun ERL Solenoid Gun to Booster Cavity Transport line installed ERL Solenoid ERL DCCT LEReC Profile Monitor ERL ICT ERL Halo Monitors & Pick-ups DCCT ICT BPM BPM ID 1.87

Gun to Booster Laser trace for 6mm laser spot offset Relocated laser mirrors Redesigned and Relocated Solenoid and Corrector Magnets Relocated BPM’s and Profile Monitor Added clearing electrodes (updated BPM buttons) Redesign DC Gun Anode Redesign Booster Cavity upstream end Need to add remove adjustment for solenoids.

Gun to Booster

DC Gun Installation (- Booster Cavity) Need Transport Laser line, laser table 2.1 GHz coax/waveguide Work platform for DC gun access Cable tray, water, power for DC gun and 2.1 GHz Clean rooms Co-exist with CeC components 2017

Diagnostics: Gun to Booster Cavity Parameter Instrument Position BPM System Current / Charge ICT, DCCT, Faraday Cup Profile Profile Monitors (PM) Halo Moveable Halo Detectors Emittance Multislit mask + PM Equipment specifications: Solenoids, Dipole, BPM’s Beam diagnostics hardware and electronics Beam line vacuum 2 Solenoid(s) D&M Correctors Extracted Laser YAG (2) BPM’s (2) Phase PU Clearing Electrodes BPM BPM BPM Faraday Cup YAG YAG BPM BPM DC Gun (Photocathode) DCCT Injection BPM = 6 YAG = 3 ICT = 1 DCCT = 1 Emittance Slit = 1 Halo Pairs = 2 Faraday Cup (& pick-ups) = 5 704 MHz SRF Booster Em-Slit ICT Vertical & Horizontal Halo Monitors & Pick-Ups Laser Injection Port Laser Optics Table 2.1 GHz Warm Cavity Cornell Layout GtB – modify for offset laser spot Bake-out to 200C near DC Gun DC Gun instrumentation: Large Button or ERL Buttons or Striplines?? Profile Monitor in Laser Cross Cathode Camera in Laser Cross

Transport Line Instrumentation Analysis, mechanical design, and procure components for entire transport line. Assemble, test, and install components needed for DC gun commissioning. BPM chamber assemblies and stands (new or ERL buttons?) Profile monitor vacuum chambers (ERL drive assemblies) Emittance slits (ERL parts?) Halo monitor Faraday cup for diagnostic line 1 DCCT and ICT

2016 Schedule (No Change) Installation of both new warm RF cavities at 02:00 with the goal of commissioning both during the 2017 RHIC run. Design and procure both 2.1 GHz and 704 MHz cavities Procure and install PA’s Design and fabricate tuners for both with drive system and controls. Procure RF windows and vacuum transition components Design (route), procure, and install coax/waveguide Installation stands, water, cable tray, etc. Determine if 2.1 GHz cavity can be installed in “final” position. Install 9 MHz cavity if possible.

2.1 GHz Cavity Cavity fabrication contract awarded, first vendor meeting yesterday. Windows ordered, Jlab tested. Aluminum cavity testing underway Tuner design underway Vacuum wave guide and wave guide Stand assembly design

704 MHz Cavity Cavity fabrication requisition prepared Drawing revision for frequency change RFP out – Bids due 2/5/15 Tuner design Window design Frequency 703.6 MHz No. of cells 1 Rsh 5.0 MOhm R/Qacc 178 Ohm Cavity voltage 430 kV Required RF power 37.0 kW Installed RF power 50 kW

2017 Installation – Long Lead Items Booster Cavity Conversion Cryogenic system installation for the Booster Cavity Diagnostic line 2, AKA commissioning beam line. 704 MHz “deflecting” RF Cavity Fast beam kicker system with beam dump Spectrometer deflector system Spectrometer faraday cup/beam dump Beam line (transport) components: magnets, PS, diagnostics, vacuum, stands Controls, communications, cable tray Cathode production system

Booster Cavity Installation

Commissioning Beam Line RF Settling Time ~250μs Full power on dump Instrumentation Exposure ~10μs LASER Kicker Beam Sampling Technique for high power single macro bunch measurements Need dump design May need to kick beam out of transport for defocusing optics and proper beam dump Corrector added before deflecting cavity BPM added after deflecting cavity Single Layer Mu-Metal shielding should be installed Simulations & calculations suggest instrument sensitivity exceeds requriements for cooling Confirmation from AP pending... Cost & schedule estimate needed in 2 weeks! Fixed YAG Deflecting Cavity (704MHz) From Transport Section HVDC Deflector Medium Power Beam Dump (Full Power ~250μs) Solenoid To Merger Scanning YAG Profile Monitor Faraday Cup YAG & Slit ----- Meeting Notes (2/18/16 16:00) ----- 1.5mm depth helps. How about adding quadurpole component to defocus the beam during the kick? Still need to model the kicker and plates for impedance! Dmitry suggests a larger beam pipe in this line. Commissioning B/L YAG = 3 Faraday Cup = 1 Defining Slit = 1 Beam Sampling Technique: Dumps all beam before RF cavity steady state condition is reached; thereby providing low average power samples representative of steady state high power beam.

99.41” 19.68” 72.87” 49.90” ----- Meeting Notes (2/18/16 16:00) ----- need sloping transition into the electrostic deflector. entire spectrometer line should be mumetal shielded 67.62”

April 2016 – DOE “Mini” Review Schedule update with revised milestones highlighting DC gun installation. Project Change Request for Diagnostic Line 2 Funds Cost estimate in 2 weeks: 704 MHz “deflecting” RF Cavity (Zaltsman, Smith, Brutus) Fast beam kicker system with beam dump (Mernick, Hock) Spectrometer deflector system (Thieberger, Miller, Hock) Spectrometer faraday cup/beam dump (Miller) Beam line (transport) components: magnets, PS, diagnostics, vacuum, stands (Hock, Mahler, Bruno, Miller, Mapes) Internal: Cathode production system schedule and cost (Rao, Tuozzolo, Liaw, Hamdi)

LEReC Cooling Section Design Room LF & HF solenoid and 20o dipole magnets fabrication drawings (KH) Beam Diagnostics: BPM chamber and buttons (VDM) Beam Line 5” bellows with shields fabrication drawings (GW) 20o dipole vacuum chamber for impedence review (KH) 180o dipole fabrication drawings (KH) Spectrometer magnet (180o dipole) revisions (KH) 180o vacuum chamber + large sliding bellows fabrication drawing (KH) Beam Diagnostics ES W slit & chamber fabrication drawings (VDM) 20o dipole vacuum chamber fabrication drawings (KH) Cable tray and penetration drawings and excel sheet (AF) Beam Diagnostics: PM vacuum chamber fabrication drawings (GW) Beam Diagnostics: standard PM fabrication drawings (GW) Beam Diagnostics: special “hybrid” ES/PM/BPM fabrication drawings (GW) Beam line solenoid/BPM stands & vacuum chamber stand (VDM) 20o magnet stand drawing (KH) 180o magnet w/hybrid assembly BPM stand drawings (KH), add BPM?? on hold Magnetic shielding drawing and solenoid magnetic measurement test station (VDM) In tunnel, magnetic measurement “mole” for stray field studies Quadrupole and skew quadrupole correctors for HF dipoles

LEReC Design Room Source Design Work DC Gun Vacuum Chamber Fabrication Drawings (JH) DC Gun SF6 Pressure chamber specification control drawings (JH) DC Gun cathode cooling design for Karl S. Cornell (JH) DC Gun stands (JH) DC Gun to SRF booster cavity beam line (JH) DC Gun to SRF booster cavity laser port, view port, profile monitor (JH) DC Gun to SRF booster cavity solenoid/corrector magnets (JH) DC Gun to SRF booster cavity BPM’s DC Gun cathode insertion drive assembly ERL Gun to Booster Cavity Modifications: U/S cathode to beam tube, FPC, D/S beamline & HOM (SS, JH) Cathode coating system cathode bakeout vacuum chamber & heater (KH & BM) Cathode coating system deposition vacuum chamber w/internal cathode transport system (KH) Cathode coating system transport vacuum chamber – ferris wheel (KH & WJ)

LEReC Design Room Other Work RHIC 1:00 move real estate drawings (V.DM.) Cryogenic system layout (RM) 2.1 GHz warm cavity spec. control drawings (MG) 2.1 GHz warm cavity tuner, wave guide, and warm test model (MG) 704 MHz warm cavity spec. control drawings (SP) Transport & Merger line layout (RM, KH) Locate booster cavity, solenoids, BPM’s, RF Cavities, PM’s, Diagnostic Lines Transport & Merger Line Solenoids (KH) Transport Line Solenoid Stands Transport & Merger Line Bellows and Pump Ports (GW) Transport & Merger Line CT’s (GW) Transport & Merger Line BPM’s (GW) Transport & Merger Line Correctors Transport & Merger Line Profile Monitors Merger Line Flying Wire Diagnostic Beam Lines and Components Kickers, RF cavity, beam dump,

PS Layout Phase 1

Diagnostics: Transport Parameter Instrument Position BPM System Profile YAG Profile Monitors (PM) YAG BPM BPM BPM BPM BPM BPM BPM BPM 704 MHz Warm Cavity 704 MHz Warm Cavity 2.1 GHz Warm Cavity Quadrapole(s) 2 locations Solenoid(s) 11 locations e-Beam Transport BPM = 8 YAG = 1 Beam pipe size 2.38 ID does not match ERL Bake-out to near RHIC and near Booster Cavity?? ERL Buttons for BPM’s OK?? Profile Monitor drives from ERL, vacuum chamber? ERL emittance slit drive Commissioning line dipole angle 2nd 2.1 GHz cavity location? Another 20o dipole?

Commissioning Beam Line Beam Sampling Technique for high power single macro bunch measurements Parameter Instrument Profile YAG Profile Monitors (PM) Absolute Energy Electrostatic Energy Spectrometer Magnetic Energy Spectrometer Energy Spread Slit + PM in dispersive section Longitudinal Phase RF Deflecting Cavity + Dipole & PM YAG & Slit HVDC Deflector Solenoid From Transport Section To Merger Section Faraday Cup Medium Power Beam Dump (Full Power ~250μs) Fixed YAG Scanning YAG Profile Monitor Deflecting Cavity (704MHz) Separate Group Meeting Kicker TBS Merger solenoid?? Internal beam dump TBD Deflecting cavity design underway HVDC deflector TBD Another 20o dipole? TBD Fixed and Scan YAG’s dumps Commissioning B/L YAG = 3 Faraday Cup = 1 Defining Slit = 1

Merger/Transport Need Quadrupole Magnet Spec’s Merger Solenoid BPM Quadrupole Bellows Gate Valve Corrector 20° dipole Need Quadrupole Magnet Spec’s Same as dump quadrupole? Move gate valve down stream of 20o? Instrumentation line Wire Scanner Profile Monitor Profile Monitor 704 Cavity 9 MHz Cavity Triplet Quadrupole Profile Monitor 20° dipole Gate Valve Quadrupole Beam Dump

IP 02:00 Merger Solenoid Emittance Slit 2.1 GHz Cavity Profile Monitor Commissioning line 20° dipole