Infrastructure Recovery Workshop Report post-Floods in North-Central Victoria – Practitioners Experiences Malcolm Styles Engineering Management Styles.

Slides:



Advertisements
Similar presentations
Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
Advertisements

Alex Nickson, policy and programmes manager, climate change adaptation and water Community Flood Planning in London.
91 st Annual Meeting & Exposition April 1 – 4, 2012 Anaheim, California Are You Prepared for a Disaster? Nancy Brooks, Iowa State University Cory Harms,
Shenagh Gamble Sustainability Programs Coordinator Local Government Association of the Northern Territory.
Recent experiences in Australia and New Zealand. Scope Of Events 2009 Victorian Bushfires – 9 th worst in the world – 183 deaths 2010 – 2011 – Queensland.
Natural Disaster Financial Assistance (NDFA) November 2013.
Natural Disaster Financial Assistance (NDFA) January 2015.
Regional Development Australia Fund Round Two Guidelines Overview This presentation is intended as an overview only. For the full guidelines visit
RPC Involvement in the Recovery after Tropical Storm Irene Presented by Tom Kennedy (Southern Windsor County RPC) and Susan Schreibman (Rutland RPC) on.
 Research data is an important asset.  We need to work together to build an infrastructure that facilitates good data management.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
* In 2008 discussions between Wattle Range & Robe – improve compliance and maintenance of CWEMS Schemes * Shared Services options explored with the LGA.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Image here Effective Road Maintenance on Limited Budgets Grantley Switzer General Manager Recreation, Culture and Community Infrastructure Latrobe City.
1 Presentation On Disaster and preparedness situation in Uganda At SILVER SPRINGS HOTEL, UGANDA 16 th -SEPTEMBER-2011 BY LAZARUS OCIRA
Conditional Grant Province of KZN Recapitalisation of Community Libraries.
WMIG AND LIMPOPO REGIONAL OFFICE LIAISON MEETING Lessons Learnt – Inkomati CMA Establishment and Development 12 December 2006.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
The Integrity Toolkit for Palestinian Local Government Units. Could it be used as a Two Folded Social Accountability Tool? Ibrahim Bisharat Birzeit University.
Strategic Planning for Statistics in Australia PARIS21/UNESCAP Forum on Strategic Planning for Statistics in South-East Asian Countries – Bangkok, June.
Water Supply Planning Initiative State Water Commission November 22, 2004.
BRIEFING ON DISASTER MANAGEMENT BILL LOUIS BUYS CHIEF DIRECTOR: DISASTER MANAGEMENT.
Future of Local Audit: Arrangements for smaller bodies SLCC Larger Councils Conference 20 April 2012.
Eccles Housing Market Report Community Committee Meeting 25 th January 2005 Shahla Zandi Strategy and Planning (Partnerships and Planning)
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Audit Advisory Committee Public health transition update 22 January 2013.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
Commissioning & Contracting What will be needed in the brave new world of SDS? Our thinking so far …
Transport Network Reconstruction Program Safer Roads Surfaces Disaster recovery panel session 16 May 2011.
1 Governance, accountability and performance reporting in the public sector Des Pearson Executive in Residence August 2013.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Neighbourhood Planning Miles Thompson Shared Planning Policy Manager South Oxfordshire and Vale of White Horse District Councils
ASSOCIATION OF FINNISH LOCAL AND REGIONAL AUTHORITIES (AFLRA) NORTH-SOUTH LOCAL GOVERNMENT CO-OPERATION PROGRAMME BASIC COURSE MARCH 2009.
Future Resilience in Emergency & Asset Management Date: 23/08/2012 Presented by: Anthony Genovese.
Issues surrounding the Red River Flood of Outline Introduction Impacts of the flood Flood protection works Manitoba Water Commission (MWC) Current.
Seniors Alert Scheme Sean McLaughlin Dept. of the Environment, Community & Local Government Seniors Alert Scheme ( previously known as – Community Support.
Click to edit Master subtitle style 6/8/12 Department of Cooperative Governance PUBLIC HEARINGS: IMPLEMENTATION OF THE WHITE PAPER ON CLIMATE CHANGE :
Regional Planning for Sea-Level Rise in Hampton Roads Benjamin McFarlane, AICP Regional Planner NOAA Hydrographic Services Review Panel October 26, 2011.
Process of Planning, Designing and Financing a Hospital
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Learning the lessons 2012 and 2014 procurements of audit services.
Presentation to the Portfolio Committee Establishment of an Agency for Social Security 26 February 2003 Department of Social Development.
Civil Contingencies Act and Risk Management ALARM South East 11 th MAY 2005 Prepared by Carolyn Halpin Chairman ALARM, t he National Forum for Risk Management.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Prevention of Violence Against Women in Emergencies Jill Karena, Manager Community & Culture Municipal Recovery Manager ACTION PLAN.
Flood Forum Victoria 14 November 2014 Presented by: Joe Buffone Deputy Commissioner Director Risk & Resilience.
Policy Background Roger White Head of Policy. Aberdeenshire Council – Vision Serving Aberdeenshire from mountain to sea – the very best of Scotland The.
SURF BEACH CATCHMENT, KIAMA Floodplain Risk Management Study & Draft Plan Community Information Newsletter March 2016 The study area investigated in the.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
GOVERNMENT’S CLIMATE CHANGE RESPONSE INITIATIVES By Tibaire Emmanuel UNV/CCFU 1.
FLOOD RECOVERY, RESILENCY & SUSTAINABILITY Town Hall Meetings – April 12 & 16, 2016.
Australian Infrastructure Financial Management Guidelines Engineers & Accountants Speaking the Same Language Andrew ThomasAnnette Martin President IPWEA.
Integrity Pact Partner Event 17 June 2016 Brussels Eng. Lazar Lazarov Road Infrastructure Agency.
FLOOD FORUM VICTORIA About the Floodplain Management Association.
March 2012 Flood event – Community Engagement. Todays discussion 1.Summary of the event 2.Impact on the community 3.Opportunities for engagement 4.Key.
Procurement Development Programs
Local Government Risk Agency
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Enterprise Content Management Owners Representative Contract Approval
Infrastructure Standards Model
Loddon Campaspe Integrated Transport Strategy
School Cleaning Update
Preparation of Local Adaptation Plans & Establishment of Local Offices
Asset Management Update
Loddon Campaspe Integrated Transport Strategy
RGF - Overview What is the Regional Growth Fund (RGF)
Infrastructure Standards Model
Ann Marie Roberts, Resilient Communities Officer
Presentation transcript:

Infrastructure Recovery Workshop Report post-Floods in North-Central Victoria – Practitioners Experiences Malcolm Styles Engineering Management Styles Bendigo Victoria Flood Forum Mildura 14 November

Background The storm events in Victoria

Background (cont.) 3

4

5

6

Mount Alexander Quanta of Damage repaired Re sheeted over a million square metres of road Repaired/replaced 920 small culverts Repaired/replaced 187 larger culverts (>750 Ø) Restitution of 25 bridges & major culverts (>10m²) Major repairs to five large culverts and bridges 100 flood ways and fords repaired 12,025 tonnes of spalls used to stabilise culvert and road drainage systems 15,000 square metres sealed roads repaired 7

Background (continued) 8 Figure 4The major national natural disaster funding arrangements Expenditure for 2009 ‑ 10 to 2012 ‑ 13

Bendigo Practitioners Workshop (June 2014) Australian Government Productivity Commission of Inquiry Natural Disaster Funding Terms of Reference relevant to the workshop 9

Workshop Questions WORKSHOP What is good practice in infrastrucure flood recovery? Areas of: Response, emergency works Identifying and documenting damage, regional consistency Procurement issues; use of contractors, consultants; insurance of infrastructure Assignment & control of works Reporting, and claims, future funding issues Liaison with other authorities Mitigation and resilience measures – what was in place, and what since 10

Workshop Outcomes – Immediate Emergency Response The Councils used in-house crews for emergency responses plus contractors registered with the local Councils Broad inspections & photos Not enough signs Supervisors assessed and prioritised emergency works Problems about materials supply and lack of experienced contractors 11

Workshop Outcomes – Longer-term recovery Various models used (e.g. Loddon Shire purchased more plant, put relief staff on 2 year contracts, and used their experienced staff to do the recovery works) Others used schedule of rates contractors and external consultants to co-ordinate recovery efforts and administration Varying systems of inspections, recordings of damage & estimates 12

Workshop Outcomes – Procurement Experiences Emergency work often poorly recorded Sandbagging, temporary toilets, showers should have been organised by others, not Councils Long timeframe to record and estimate damage (months). Often due to poor initial recording. Delays in setting up external contracts, and some specification documentation scant in details, understanding of skills/plant, required outcomes. Precast products supply delays 13

Procurement Experiences (cont.) 14

Procurement Experiences (cont.) Questions Raised: How to better co-ordinate with flood-affected neighbours? Can particular works be grouped/batched (e.g. small drain repairs/replacements; re-sheeting works on area basis, bridge repairs, larger culvert repairs, etc.) and separate tenders invited? Insurance of flood-vulnerable local road infrastructure – is it an option? 15

Assignment and Control of Works Various models used (refer to earlier slide) VicRoads undertook an “audit inspection” role on behalf of the State Department of Justice There was confusion amongst Council administrative and some Council engineers and supervisors about the roles and responsibilities of external consultants appointed to assign and control the works Some Council Environmental and Planning staff had difficulty in being able to co-operate with recovery efforts, as did some consultants in being able to appreciate the Council’s planning and environmental imperatives CMAs were supportive at emergency response phases, but some became quite bureaucratic as time went on 16

Mitigation and Resilience 17

What was in place? Great people responding to the emergency events Flood response plans (a mix of effectiveness) Some supplies of sandbags and signs – not enough? Not much thought had been given to marshalling road infrastructure recovery works 18

What has happened since? A lot about how to deal with emergency response. Australian Government Commission of Enquiry Draft Report More $ towards resilience projects (e.g. Loddon Shire – three towns flood studies; Gannawarra built a higher south levee plus flood studies for two towns; Central Goldfields has completed Carisbrook & Dunolly; Macedon Ranges has done flood studies for Gibson & Woodend. 19

What has happened since (continued)? State Emergency Service has completed many Flood Guides for towns (e.g. Koondrook, Carisbrook, Dunolly, Kerang, Quambatook, and working on five guides for towns/communities in Loddon Shire. Community Flood committees have been set up. Operation plans being integrated into Municipal Emergency Management Sub-plans 20

Future Actions 21

Future Actions Refer to the AGPC draft report proposed recommendations (which are advocating far more outcome-based sustainability and resilience measures – with significant costs to be borne by State and local governments in recovery works) Council-controlled road infrastructure asset management planning must build in resilience measures Need to streamline longer term recovery of infrastructure through documentation of “best practice” measures established post-the Queensland and Victorian flood disasters 22

Future Actions (cont). 23

Future Actions (continued) 24

25