AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)

Slides:



Advertisements
Similar presentations
AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Advertisements

Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
AT Equ. Groups / AB-CO Control responsibility Sharing.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Operation in AB-CO 2005 & Beyond
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
The TIMING System … …as used in the PS accelerators.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
controls Middleware – OVERVIEW & architecture 26th June 2013
Wojciech Sliwinski for BE-CO group Special thanks to: E.Hatziangeli, K.Sigerud, P.Charrue, V.Baggiolini, M.Sobczak, M.Arruat, F.Ehm LHC Beam Commissioning.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
CERN LASER Alarm System Katarina Sigerud, CERN ACS workshop, 9 October 2005.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
AB-CO review Support for Cryogenics. Philippe Gayet AB/CO IS CERN, 20/09/05 Outline Scope Hardware Type, Responsibility sharing, Status Basic software.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
FAIR Accelerator Controls Strategy
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
© 2001 By Default! A Free sample background from Slide 1 Shot by Shot Logging Status Report of Ti8 Tests AB/CO Technical.
Experimental Areas Controls Review  AB/CO Viewpoint Vito Baggiolini (on behalf of the CESAR team and several people in CO)
Strategy to achieve smooth upgrades during operations Vito Baggiolini BE/CO 1.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
BE-CO review Looking back at LS1 CERN /12/2015 Delphine Jacquet BE/OP/LHC Denis Cotte BE/OP/PS 1.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
22 Sept 2005CO Review1 Services to Equipment Groups, AB/CO Viewpoint Marc Vanden Eynden, Ronny Billen, Franck Di Maio, Philippe Gayet, Eugenia Hatziangeli,
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
AB/CO Infrastructure surveillance Alastair Bland, AB/CO 18 th May 2005 (thanks to Pierre Charrue for the original PowerPoint presentation in September.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
LHCONE Monitoring Thoughts June 14 th, LHCOPN/LHCONE Meeting Jason Zurawski – Research Liaison.
The MA section of AB/CO FirstEvent Welcome ! RADE Information Event Adriaan Rijllart (AB/CO) 2 Outline 10:00 The context 10:15 Introduction to RADE 10:35.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Archives/References for SPS Faraday Cage Timing Vito Baggiolini AB/CO after discussions with M. Arruat, J.-C. Bau, R. Billen, A. Butterworth, F. Follin,
JIRA in BE-CO for Exploitation Marine BI Seminar 20 November
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
What means QA for PLC Programming Philippe Gayet ATC/ABOC Days.
- My application works like a dream…does it. -No prob, MOON is here. F
AB-CO Review Controls for BDI
SPS Applications Software issues - startup in 2006 and legacy problems
0v1.
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
Presentation transcript:

AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)

Status in March 2006  New Control Center  Restart PS (Early for LEIR) & SPS after 1 full year stop  Major SPS Timing change  New control HW (Timing modules, VME controllers,…), but also ageing components (Camac)  Mix of new (FESA, Java apps) and previous controls technologies  Growing obsolescence of Exploitation tools  Too many gray responsibility areas (CO,OP,Eq-Groups)  Multiple console managers & OS  All with LHC HW Commissioning in parallel

Scenario for 2006  Must start 2006 with previous organisation: CO piquet for PS complex (when possible) experts on-call for SPS =>Limited Objectives But Reinforce CO Exploitation with: a dedicated Exploitation Manager, covering all machines, with mandate to: a dedicated Exploitation Manager, covering all machines, with mandate to:  Identify and agree with partners on responsibility limits (reduce ‘gray’ areas)  Drive towards Homogenization through the different domains: FE OS, HW, Applic.layers…  Add support structure for Industrial Controls (at first, for LHC Hardware commissioning)  Push for diagnostic tools usable by Operators

Later Scenarios: Piquet or On-Call? OP must share a common view!! Piquet + guaranteed availability + single entry point + solves directly all common CO pbs + Enforce homogeneous diagnostic tools - may need to call expert if complex pb - (?) need proper central info - probably no single piquet for all accelerators On-Call - may need to call several numbers to get answer - OP must first diagnose the right domain + more in-depth knowledge => faster repair + (?)No need for Eq.Grp to provide central info or diagnostics + One Call list may cover all machines & domains

Converging PS/SL methods Following actions will unify tool & information interface:  FE Startup sequence ‘a la SL’, (from DB as in PS) – (effective now)  Console Manager & generic controls (knobs,..)  Alarms (LASER) – but lacks PS facilities…  FESA progressively replacing GM(PS) or SL-Equip (but need info on device/physical address relation)  Other possible actions (to be discussed): source code directory for operational sw in front-ends Reduce file system dependencies (in view of CNIC..)

Centralising Exploitation Information Based on naming standards & DBs:  Layout DB Two layers of description System (PLC, VME, GATEWAY, FIP segment, Server,..) Functional Component (slot) of system (board, Supply, CPU,…) Connection to functional slots (timing, Power, Ethernet..)  ABCAM Asset management tool describing all physical control equipment associated to a functional slot - but just starting to contain relevant data… - mostly LHC -

Other Actions  Clarify responsibilities with equipments in all grey areas.  Enforce procedures for reception & change tracking  Identify & execute urgent legacy software upgrade Old LynxOS versions, OS9… HP / Windows servers Important Orphan applications  Integrate all existing diagnostic tools LASER (AP), GTPM (OP), XCLUC (IN), Spectrum (IT -CS), TIM (OP), PVSS UNICOS integrated diagnostics (IS/IN), Application integrated diagnostics (AP),DiagCMW (FC), TIMING Tools (HT), PLC consoles Tools (IS), FIP diagnostic Tool (IS), Logging monitoring (DM)…

CO Operation Responsibilities AP Java Applications framework High level applications for : -LEIR -LHC HC LASER HT Timing /Sequencing Remote reset FE FC CMW FE IN Servers FE (via xcluc) PIC/WIC IS PVSS IEPLC CRYO FIP Test bench DM Logging Configuration DB ABCAM LAYOUT DB All CO sections will have activities related to Exploitation in 2006

Present piquet Know How AP Java Applications framework Legacy Application High level application : -LEIR -LHC HC LASER HT Timing /Sequencing Remote reset FE FC CMW FE IN Servers FE (via xcluc) PIC/WIC IS PVSS IEPLC CRYO FIP Test bench DM Logging Configuration DB ABCAM LAYOUT DB

Sharing Responsibilities inside CO  The Exploitation Responsible in charge of: Interface toward OP (ABOP,…) and Eq.Groups (responsibility limits) Coordination of control system integration Requesting procedure/documentation to system teams Coordinating the diagnostic tools development Requesting from the different teams the functionalities necessary to operation.  CO sections organize (alone, in synergy with other,…) the operation support of the systems they deploy. Not systematic organization (PIQUET OR LIST) Intervention teams can be grouped i.e. : hardware for VME, gateway, FIP, PLC PVSS/PLC & PVSS/FEC applications support  Create a Real Operation Oriented policy within the entire CO group =>All this implies sufficient resources devoted to this task….