Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
August 27, 2006R. Garoby Introduction 5 GeV version of the SPL Scenarios for accumulation and compression Conclusion SPL-BASED 5 GeV PROTON DRIVER.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
Proton Driver Developments and the Neutrino Factory Christopher R Prior ASTeC Intense Beams Group STFC Rutherford Appleton Laboratory, U.K.
UK Neutrino Factory Conceptual Design
Proton Driver Scenarios at RAL and CERN
Towards a Common Proton Driver for a Neutrino Factory
Plans for a Superconducting Proton Linac at CERN
1- Short pulse neutron source
Proton Drivers Leo jenner – Joint Fermi / Imperial
Meson Production Efficiencies
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
Collective Effects and Beam Measurements in Particle Accelerators
A Design Study of a Compressor ring for
The SPL-based Proton Driver at CERN
General Issues for a Multi-MW driver
Elena Benedetto, CERN 16/12/08
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
JLEIC 200 GeV ion beam formation options
Updated MEIC Ion Beam Formation Scheme
Choice of harmonic number with the consideration of ion beam formation
Presentation transcript:

Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal

Neutrino Factory - Our Specs 4 MW beam power GeV kinetic energy 5 bunches of 3 ns length Hz rep rate Target

Neutrino Factory: ¿our? Approach H- Linac Laser assisted charge- exchange Injection 5 GeV Accumulator Ring Compressor Ring Target R. Garoby, E. Benedetto, M. Aiba, M. Meddahi CERN, Geneva, Switzerland

5 GeV Linac as Proton Driver H - 50Hz Penning Source Chopping at 3MeV SC only after DTL -> save cost Step in frequency after DTL -> reduce footprint 5GeV H- Source RFQChopperDTLLEBTPIMS (SC) 160MeV 80 MeV 3 MeV 45 keV LowBeta (SC) HighBeta (SC) 352 MHz704 MHz Linac4/SPL…

Linac Time Structure H - Ion Source 50 Hz rep rate Batch length: 140 ns (50 linac bunches) Gaps of 60 ns (chopper) … 480 µs 20 ms 5 batches / accumulator turn 2400 batches (10 14 protons) / pulse After Chopper

H - – Injection Laser assisted to avoid foil Transverse painting to reduce SC effects

Accumulation and Compression H- Linac 5 GeV Accumulator Ring (Circ: ~300 m ) Compressor Ring Target Injection into Acc-Ring (480 turns) Accumulation: transverse x and y phase-space painting No RF in Accumulator Ring (Isochronous) Slippage Factor = 0

Bunch Compression Required bunch length 3ns Bunch rotation in two ways – Fast bunch compression with voltage detuning – Dephasing of the longitudinal bucket – Consider ¼ of synchroton period M. Aiba

Extraction - Target Fast extraction Tungsten rotating wheel target H- Linac Charge- Exchange Injection 5 GeV Acumulator Ring Compressor Ring Target

Conclusion Linac length/energy Laser assisted H- stripping to avoid foil damage Accumulator + Compressor vs All-In-One longitudinal requirements contradictory Avoid ramping of circular machines Use multi turn injection to achieve required bunch current - power

Green Field Hot target cooling water flows through a generator providing part of the electricity needed by the accelerator facility Hot target cooling water flows through a generator providing part of the electricity needed by the accelerator facility

Green Field Hot target cooling water flows through a generator providing part of the electricity needed by the accelerator facility Locate neutrino factory next to nice mountains to provide nice skiing and hiking area for scientists… Hot target cooling water flows through a generator providing part of the electricity needed by the accelerator facility Locate neutrino factory next to nice mountains to provide nice skiing and hiking area for scientists…

Extra slides

Linac as proton driver Parameters: – Output Energy 5GeV – 70mA peak current – 35 % chopping factor – 2.4% duty cycle -> 480 us pulse length – Num. particles per bunch 1.14 x10 9 – Num. Bunches per pulse =50