Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.

Slides:



Advertisements
Similar presentations
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
T2K neutrino experiment at JPARC Approved since 2003, first beam in April Priorities : 1. search for, and measurement of,   e appearance  sin.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
2015/6/23 1 How to Extrapolate a Neutrino Spectrum to a Far Detector Alfons Weber (Oxford/RAL) NF International Scoping Study, RAL 27 th April 2006.
The JPARC Neutrino Target
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
LBNF Neutrino Beam Jim Strait, Fermilab For the LBNF/DUNE Team
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Long Baseline Experiments at Fermilab Maury Goodman.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Search for Electron Neutrino Appearance in MINOS Mhair Orchanian California Institute of Technology On behalf of the MINOS Collaboration DPF 2011 Meeting.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
Harvard Neutrino Group DoE Review August 21, 2006.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
BNL neutrino beam. Optimization and simulations Milind Diwan June 10.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
NEAR DETECTOR SPECTRA AND FAR NEAR RATIOS Amit Bashyal August 4, 2015 University of Texas at Arlington 1.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Neutrino Beamline Scaling Robert Zwaska Fermilab June 4, 2014 PIP-II Collaboration Meeting.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
T2K Experiment Results & Prospects Alfons Weber University of Oxford & STFC/RAL For the T2K Collaboration.
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop.
LBNE Beamline Planning and Options Vaia Papadimitriou Manager of the LBNE Beamline Accelerator Division Headquarters - FNAL P5 Meeting at.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Precision Measurement of Muon Neutrino Disappearance with T2K Alex Himmel Duke University for the The T2K Collaboration 37 th International Conference.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
MINERνA Overview  MINERνA is studying neutrino interactions in unprecedented detail on a variety of different nuclei  Low Energy (LE) Beam Goals: t Study.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
NuMI Flux, Leonidas Aliaga William & Mary July 25, 2012 Current Uncertainties And Future Plans International Workshop on Neutrino Factories, Super Beams.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
The MiniBooNE Little Muon Counter Detector
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
Presentation transcript:

Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration

Baseline = 800 miles LBNE Experiment 20 miles underground Near Detector ICHEP2

Goals: Mass Hierarchy and CP violation NH A ~ pure ν μ beam generated by the ~120 GeV MI proton beam. Wide-band matched to the L/E for the first and second oscillation maxima for a 1300 km oscillation length. ≈ 780 ν e events Measure relative ν μ and ν e rates at Far Detector for neutrinos and anti-neutrinos ICHEP ≈ 7000 ν μ events 3

Top of band: Best case beam and interaction systematics (with near detector) Bottom of band: Worst case beam and interaction systematics (no near detector) Exposure: 34 kt x 1.2 MW x 6 years (half ν + anti-ν). MH and CP Sensitivities ICHEP4

Beam  Extract from Main Injector at GeV  5.8 degrees down  Go up first!  Plan for 1.2 MW beam power at start  Upgrade path to 2.3 MW  NUMI-like  ~1 m graphite target  2 Focusing horns  204 m Decay pipe ICHEP 5.8 degrees down Physics report LBNEarXiv:

Design challenges Maximize beam power at the right energies Cost optimization Radiological safety System reliability – Corrosion – Cooling – Radiation damage – Accessibility – Spares ICHEP6

Neutrino flux uncertainties Need to understand the beam parameters very well as physics results depend on ability to estimate the neutrino flux – Avoid multiple interactions in the target – Alignment tolerances – Spot size – Downstream material – Horn behavior Near detector helps a lot as much of this cancels in a near/far ratio ICHEP7

New since 2012 Conceptual Design Be ready for 1.2 MW on day one (previous talk by Steve Brice) Helium instead of air in the decay pipe to increase the neutrino flux and reduce the systematics Optimization studies for beam energy GeV ICHEP8

Target Hall/Decay Pipe Layout ICHEP Target Chase: 1.6 m/1.4 m wide, 24.3 m long Decay Pipe concrete shielding (5.5 m) Geomembrane barrier system to keep groundwater out of decay region, target chase and absorber hall Work Cell Baffle/Target Carrier 204 m 4 m helium-filled steel Cooling panels 9

Preliminary target design for 1.2 MW ICHEP mm Currently simulating this target design and the NuMI horns with MARS and GEANT. 47 graphite segments, each 2 cm long Graphite fin stress Water line stress 10

Preliminary target design for 1.2 MW Expect to change a graphite target ~2-3 times a year during 1.2 MW operation – Limited lifetime due to radiation damage to graphite and thermal stresses – Increase the beam rms of 1.7 mm and Increase the graphite fin size to 10 mm Considering as an alternative a Be target – Radiation damage a factor of 10 less than graphite (subject of R&D) ICHEP11

Horn Operation at 1.2MW ICHEP Parameters700 kW1.2 MW Current Pulse Width2.1ms0.8ms Cycle Time1.33s1.20s Horn Current230kA Target Width7.4mm10mm Protons Per Spill4.9 X X Beam heating and joule heating on horn 1 generate unacceptable power input into the horn inner conductor with the new target design and the NuMI horn power supply (2.1ms pulse width). Higher energy depositions from the target can be offset by reducing the current pulse width to 0.8ms (requires a new horn power supply). These changes allow the design current to remain at 230kA which is the upper current limit for a NuMI conductor design. Water Tank 12

 Decay pipe cooling air supply flows in four, 28-inch diam. pipes and the annular gap is the return path (purple flow path) (Helium increases the flux by ~10%) ICHEP  Concentric Decay Pipe. Both pipes are ½” thick carbon steel Decay pipe 13

LBNE Absorber Complex – Longitudinal Section ICHEP Decay Pipe The Absorber is designed for 2.3 MW A specially designed pile of aluminum, steel and concrete blocks, some of them water cooled which must contain the energy of the particles that exit the Decay Pipe. concrete CCSS Steel Al Steel Hadron Monitor (needs R&D ) Thermal, structural, mechanical engineering development in progress 14

LBNE Near Detector Fine-Grained Tracker – 460 m from target Low-mass straw-tube tracker with pressurized gaseous argon target Relative/absolute flux measurements High precision neutrino interaction studies ≈ 10 7 interactions/year! Additional target materials possible Proposal pending in India ICHEP Dr. Zelimir DJURCIC at 1630 today in the Neutrino section 15

Physics optimization studies Use G4LBNE – GEANT4 simulation based on G4NUMI LBNE Fast MC for detector efficiency/purity – GENIE event simulation – Parameterized detector response ICHEP Target Horns 16

Beamline contributions to absolute flux ICHEP Predicted absolute flux errors at the near detector vs. energy 17

Errors on Near/Far ratio ICHEP18

Mostly cancel in a near/far ratio ICHEP 0.5 mm alignment tolerances lead to error on Near/Far ratios << statistics Near to far ratio is less sensitive 19

Signal rates at different proton energies ICHEP Estimated  e rates for baseline MW beam power, 35 kT detector Feed-down source Signal region Events/ GeV Integrated difference in figure of merit S/√S+B between between 120 and 80 GeV is +8% for, +16% for ν̄ 20

Helium vs. Air ICHEP Study for neutrino beam mode – LBNE doc: 8144 He yields 11% more flux GeV 4% less anti-nu background GeV 21

Potential optimizations ICHEP Change GeV GeVComment DK pipe Air  He * DK pipe length 200 m  250 m (4m D) $ DK pipe diameter 4 m  6 m (200m L) $ Horn current 200 kA  230 kA Proton beam energy 120->80 GeV Target graphite fins  Be fins Increase target lifetime Total~1.4~ 1.5 Ratio of   e CC appearance rates at the far detector Simplifies the handling of systematics as well Recently approved Subject of R&D 22

From the P5 report Timeline ICHEP23

Conclusions Significant progress with preliminary design effort in many Beamline systems. Robust simulation framework is aiding physics and value optimization Lots of opportunities for collaboration on Beamline components as well as on beam simulations and R&D efforts. ICHEP24

Beam simulations Primary beam magnet and power supply design and construction Primary and neutrino beamline instrumentation Target R&D Target, Baffle and Horn support modules Horn R&D for 2nd generation 1.2 and 2.3 MW Design and construction of cooling panels for the target chase shield pile Upstream decay pipe window Corrosion studies for target chase, decay pipe and absorber Radiation simulation verification – simulate known irradiations at known facilities and compare with actual measurements Hadron production studies that provide essential input for the prediction of the neutrino flux. And many more….. Design Opportunities ICHEP 25

BACKUP ICHEP26

Beam design parameters ICHEP The Long-Baseline Neutrino Experiment: Exploring Fundamental Symmetries of the Universe arXiv:

Parameters cont. ICHEP28

Proton Improvement Plan-II Performance Goals ICHEP - 80 GeV PIP-II doc: 1232 S. Holmes et al. 29

Replace existing 400 MeV linac with a new 800 MeV superconducting Linac 1.2 MW beam power to LBNE at start-up of experiment. Plan is based on well-developed superconducting RF technology. Strong support from DOE and in the recent Prioritization Panel report. Flexible design - future upgrades could provide > 2MW to LBNE. Proton-Improvement-Plan Phase II (PIP-II) ICHEP Steve Brice Talk 30

R&D needs At 1.2 MW R&D will be needed on: – target (materials) assuming minimal modifications will work – horns (2 nd generation) assuming minimal modifications will work – hadron monitor At 2.3 MW additional R&D will be needed on: – target (materials, shape, cooling,…) – horns – hadron monitor – primary beam window (only cooling aspects affected by 1.2 MW) ICHEP31