MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.

Slides:



Advertisements
Similar presentations
MVD A SSEMBLY T WO HALF FRAME DONE – D IMENSION T ESTED A NCILLARIES FOR F RAMES DONE – D IMENSION T ESTED F RAME A SSEMBLY & F INAL M ACHINING – MUST.
Advertisements

Series L Air conditioners for Laboratories.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Chapter 2: Overall Heat Transfer Coefficient
One-Dimensional Steady-State Conduction
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Vacuum system.
Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Heat Transfer Equations For “thin walled” tubes, A i = A o.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Installation of the T600 at Fermilab CSN2, September 22,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Exercises for Q1. Insulated copper tube A thin walled 10 mm copper tube is used to transport a low-temperature refrigerant with a temperature that is.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Update on the PSB Cooling and Ventilation Systems
Feedback on transfer line sizing and flow calculations for UT
A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Update of MVD services and requests
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
HFM Test Station Main Cryostat
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Micro Vertex Detector of PANDA Strip Detector
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
cooling and supports of the forward endcap EMC
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
Integration – preliminary ideas on routing and tests
Integrated Design: APEX-Solid Wall FW-Blanket
WG4 – Progress report R. Santoro and A. Tauro.
Work packages status in Torino and perspectives
Pixel CO2 Cooling Status
Detector Technology Group
VELO Thermal Control System
ESS elliptical cryomodule
Steam traps Applications and Recommendations
Proposal for new coil design the CBM magnet
Presentation transcript:

MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND DC-DC CONVERTER -DEFINE OF THE PIXEL, STRIP AND SEVICES MODULARITY -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE PACKAGE SECTION OF ALL THE COOLING TUBE ALONG THE PATH -EVALUATION OF PRESSURE DROPS ALONG THE PATH -INSERTION OF PATCH PANELS -OPEN QUESTIONS S.COLI - DEC.20141

PIXEL - 42 TUBES: 65 m INLET and 65 m RETURN outside the magnet 2,5 m INLET and 2,5 mt RETURN inside the magnet 2,3 m in the MVD (53 U tubes) WATER VOLUME: about 160 liters MASS FLOW RATE: about 16 lit/min COOLING CIRCUITS: 21 TUBE MODULARITY: circuits with 3 U tubes + circuits with 2 U tubes (0,3 lit/min each U tube) STRIP - 44 TUBES: 65 m INLET and 65 m RETURN outside the magnet 2,5 m INLET ad 2,5m RETURN inside the magnet 2, 7m in the MVD WATER VOLUME: about 190 liters MASS FLOW RATE: about 10 lit/min COOLING CIRCUITS: 22 TUBE MODULARITY: circuits with 3U tubes + circuits with 2 U tubes + Disk-Tubes (0,3 lit/min each tube) SERVICES - 64 TUBES: 65 m INLET and 65 m RETURN outside the magnet 2 m INLET ad 2m RETURN inside the magnet 1 m in front of MVD WATER VOLUME: about 270 liters MASS FLOW RATE: about 30 lit/min COOLING CIRCUITS: 32 TUBE MODULARITY: 32 circuits (0,9 lit/min each) DIMENSION of the HYDRAULIC CIRCUIT for MVD SYSTEM (PIXEL + STRIP + SERVICES): S.COLI - DEC SUMMARING About 640 lit About 56 lit/min About 75 circuits 150 Tubes

GBT Boards: Wing in Al (175 W/mK) Tube Φ in 5 mm, Φ est 6 mm in SS (15W/mK) Chip Area = 20mm*20mm Power Flux= 10000W/m 2 TOT Power= 64W (=4*16 GBT boards) WING DIMENSIONS: 12mm X30mm X780mm INNER WATER TEMP=18°C WATER FLOW RATE= 0,9lit/min Alpha= 1700W/m 2 K Ideal contact between tube and wing Glue layers neglected S.COLI - DEC GBT AND DC-DC CONVERTER BOARDS PRELIMINARY THERMAL ANALYSES DC-DC Converter Boards: Wing in Al (175 W/mK) Tube Φ in 5 mm, Φ est 6 mm in SS (15W/mK) Chip Area = 10mm*10mm Power Flux= 30000W/m 2 TOT Power= 132W (=3*44 DCDC-Converter boards) WING DIMENSIONS: 10mm X 25mm X 424mm INNER WATER TEMP=18°C WATER FLOW RATE= 0,9lit/min Alpha= 1700W/m 2 K Ideal contact between tube and wing Glue layers neglected

U tubes (  e 2mm.) in MP35N CIRCUITS FOR 3 U tubes CIRCUITS for 2 U tubes OUTSIDE MAGNET INSIDE MAGNET INSIDE MVD COOLING CIRCUITS INSIDE MVD INSIDE MAGNET OUTSIDE MAGNET  i 8 mm 0,9 lit/min  i 6 mm 0,9 lit/min  i 2,5mm 0,3 lit/min  i 10mm 0,9 lit/min  i 6mm 0,9 lit/min  i 2,5mm 0,3 lit/min  i 8 mm 0,6 lit/min  i 6mm 0,6 lit/min  i 2,5mm 0,3 lit/min  i 10 mm 0,6 lit/min  i 6mm 0,6 lit/min  i 2,5mm 0,3 lit/min MVD COOLIG CIRCUIT MODULARITY S.COLI - DEC CIRCUITS FOR DC-DC CONVERTER and GBT OUTSIDE MAGNET INSIDE MAGNET INSIDE MVD COOLING CIRCUITS  i 8mm 0,9 lit/min  i 6 mm 0,9 lit/min  i 10 mm 0,9 lit/min  i 6mm 0,9 lit/min PP3 PP4 U tubes (  e 5mm.) in SS316 5mt 2,5mt 1m +Utube 1m+Utube 2,5mt 5mt 5mt 2 Utube=1m

DIMENSION of the HYDRAULIC CIRCUIT for MVD SYSTEM (PIXEL + STRIP + SERVICES): TUBES FROM COOLING PLANT TO MAGNET: INLET LINES= 75 INSULATED TUBES [Diam ext. 16mm each+ insulation] RETURN LINES = 75 TUBES [Diam ext. 16mm] = 0,65 m* 0,15m total section for Tubes FROM COOLING PLANT TO PANDA (Stainless steel) IN FRONT OF THE MAGNET DOOR (PP4) -150 Pressure sensors (one on each tube) CLOSE TO MVD (immediately in front of the magnet) + fittings -150 Readout cables and Power supply TUBES INSIDE THE MAGNET (around the beam pipe) -8+8 Polyurethane tubes - inlet + return lines (diam. 6-8mm) for GBT Boards Polyurethane tubes – inlet + return lines (diam. 6-8mm) for DC-DC Converter Boards Polyurethane tubes – inlet + return lines (diam. 6-8mm) for MVD internal patch panels Polyurethane tubes- inlet + return lines (diam. 2,5-4 mm) from internal patch panels to MVD U-Tubes for GBT and DC-DC Converter Boards in Stainless steel INSIDE THE MVD -53 U-tubes for PIXEL + 24 U-tubes for STRIPS + 8 Strip Disks in MP35N THE COOLING PLANT -PLC -Tank -Vacuum pump -Inlet pump + filter -Water cleaning unit -Manifolds and 75 inlet tubes -Manifolds and 75 return tubes -Heat exchanger -75 pressure regulator, + 75 flow meters + 75 valves on return lines + 75 water Temperature sensors -150 pneumatic valves -Other sensors (tank level indicator, pump pressure sensors, water temperature sensors…) S.COLI - DEC

MVD HYDRAULIC CIRCUIT PNEUMATIC VALVES TEMPERATURE SENSORS FLOW METERS PRESURE REGULATORS HEAT EXCHANGER -PUMP -VACUUM PUMP -PLC -CONTROLS PRESSURE SENSORS COOLING PLANT PNEUMATIC VALVES S.COLI - DEC.20146

PANDA AREA S.COLI - DEC PANDA in ASSEMBLY POSITION PANDA FINAL POSITION MVD COOLING PLANT MVD TUBES PATH

S.COLI - DEC MVD COOLING PLANT – OUTSIDE THE PIT INLET RACKS (PIXEL, STRIP, SERVICES) PLC HEAT EXCHANGER (?) 3,8 mt 3,5 mt

S.COLI - DEC MVD COOLING PLANT – IN THE PIT RETURN RACKS (PIXEL, STRIP, SERVICES) TANK+ VACUUM PUMP INLET PUMP + WATER CLEANING UTIT

S.COLI - DEC MVD COOLING SYSTEM – INLET AND RETURN TUBES PATH INSIDE PANDA AREA TUBE PAKAGE SECTION ALL ALONG THE PATH [0,65m X 0,15 m] h= 2 mt INLET LINES RETURN LINES

S.COLI - DEC MVD COOLING SYSTEM – INLET AND RETURN TUBES PATH INSIDE PANDA AREA TUBE LENGHT:~ 65 m

S.COLI - DEC MVD COOLING SYSTEM– PATCHPANELS PP1: TRANSITION (FLEX-METAL TUBES) PP2: FOR ASSEMBLY PP3: FINAL PP4: PRESSURE SENSORS AND FITTINGS, AFTER CAL INSERTION PATH ? BEFORE CAL INSERTION

S.COLI - DEC MVD COOLING SYSTEM– REQUEST 1 THE RETURN TUBES AT THE HEIGHT OF THE FLOOR? CROSSING PROBLEM?

S.COLI - DEC MVD COOLING SYSTEM– REQUEST 2 CAN THE MVD OCCUPY THE RIGHT SIDE OF THE PIT? CROSSING PROBLEM? AVAILABLE AREA?

CIRCUITS FOR 3 U TUBESG[g/s]G[l/m]L[m]d i -d e [mm]V[m/s]ReP_drop[bar] INLET OUT OF THE MAGNET 150, ,324000,2 INLET IN THE MAGNET 150,92,56-80, ,03 IN THE MVD (PIXEL) 50,30,3+1+11,84+2,51, ,25+0,32 RETURN IN THE MAGNET 150,92,56-80, ,03 RETURN OUT OF THE MAGNET 150, , ,04 CIRCUITS FOR 2 U TUBES G[g/s]G[l/m]L[m]d i -d e [mm]V[m/s]ReP_drop[bar] INLET OUT OF THE MAGNET 100, ,216000,06 INLET IN THE MAGNET 100,62,560, ,01 IN THE MVD (PIXEL) 50,30,3+1+11,84+2,51, ,25+0,32 RETURN IN THE MAGNET 100,62,560, ,01 RETURN OUT OF THE MAGNET 100, , ,03 CIRCUIT FOR 1 U TUBE SERVICES G[g/s]G[l/m]L[m]d i -d e [mm]V[m/s]ReP_drop[bar] INLET OUT OF THE MAGNET 150, ,324000,2 INLET IN THE MAGNET 150,926-80, ,03 IN THE MVD 150,9150, ,03 RETURN IN THE MAGNET 150,926-80, ,03 RETURN OUT OF THE MAGNET 150, , ,04 PRESSURE DROP IN THE COOLING CIRCUITS LIMIT=0,6 bar S.COLI - DEC LIMIT=0,6 bar

S.COLI - DEC MVD COOLING SYSTEM – QUESTIONS Can the return tube be located on the floor along the external wall? Can the MVD occupy the right side of the pit ? From where does the cold water arrive? AIR line at 6 bar? Where? Is the door a passage? Can we put the patch panels? The small patch panel4 on the floor held by the CAL support (charriot)? After CAL insertion, we need to cut tubes to patch panel 4 (?) The path for the flex tubes from PP3 to PP4?