Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Ion Accelerator Complex for MEIC January 28, 2010.
Eurisol driver: heavy ion capabilities A. Pisent, M. Comunian, A. Facco, E. Fagotti, (INFN-LNL) R. Garoby (CERN), P. Pierini (INFN-MI)
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Introduction to the China-ADS project and accelerator design Jingyu Tang Institute of High Energy Physics, CAS Beijing, China FNAL Seminar, August 18,
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
APS Short Pulse X-ray (SPX) Design Study July 27-29, 2010.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Warm and Cold Ion Linac: Comparison and Optimization March 30, 2015.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
Using step-like nonlinear magnets for beam uniformization at target in high intensity accelerarors Zheng Yang, Jing-Yu Tang, IHEP, China P.A. Phi Nghiem,
CW Linac Lattice August, 29 N.Solyak, B.Shteynas.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Introduction to China-ADS and the driver accelerator Jingyu Tang Institute of High Energy Physics, CAS Beijing, China CEA-Saclay Seminar, March 29, 2012.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Study on IFMIF Beam-Target Interface
Zheng Yang, Jing-Yu Tang, IHEP, China
General Design of C-ADS Accelerator Physics
Physics design on the main linac
Alternative/complementary Possibilities
Hosting Orsay Walid KAABI
MOMENT Overview Jingyu Tang Institute of High Energy Physics, CAS
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
High Power Linacs 3.5 MW beam power 1979.
Challenges and Perspectives of Accelerator Driven Systems (ADS)
Injector Chain General and more about p-RCS
Beam operation status in C-ADS cryomodule at IMP/IHEP
Superbeams with SPL at CERN
CEPC RF Power Sources System
ADS Accelerator Program in China
Neutrino beams in China
Injector Chain General and more about p-RCS/i-RCS
Electron Source Configuration
CEPC Injector Damping Ring
Pulsed Ion Linac for EIC
Considerations on Beam Diagnostics Physics
MEBT1&2 design study for C-ADS
Physics Design on Injector I
RF introduction Anders Sunesson RF group leader
Status of the JLEIC Injector Linac Design
DTL for MEIC Ion Injection
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International Review Meeting on Accelerator Physics Design of C-ADS, September 19-20, 2011

Main topics Special features and design goals of the C-ADS linac Phased R&D and construction milestones Organization of the C-ADS accelerator physics Key parameters, physics schemes and technical schemes Charges to the review committee

Special features and design goals of the C- ADS linac Medium-energy, very high beam power, very high reliability, CW beam  RAMI principles  Superconducting structure as possible Reliability and availability much higher than actual accelerators in operations  Very strict on beam trips  Installed tolerance: over-design, redundancy, fault-tolerance  Local compensation method for key device failures ParticleProton Energy (GeV)1.5 Current (mA)10 Beam power (MW)15 Duty factor (%)100 Beam Loss (W/m)<1 Beam trips/year 1s 5m <25000 <2500 <25

Roadmap of C-ADS program RFQ + HWR RFQ + Spoke 2013 ~5 MeV ~50 MeV 201X 50/150 MeV ~ ~1 GeV ~ ~1.5 GeV 5~10 MW t 100 MW t ≥1 GW t Development of injectors Individual Integrations Integral testPhase II target/reactor Phase III target/reactor 10 MeV Phase I R&D Facility Phase II Experiment Facility Phase III DEMO. Facility

Main check-points for the C-ADS linac Phased development on C-ADS linac should follow the check-points  Phase 1 – first step (2013)  Accomplish two different schemes for the major part of the injector by IHEP and IMP: an RFQ + 5-MeV superconducting section, CW operation but no beam current requirement.  Phase 1 – second step (2015)  Accomplish two injectors by IHEP and IMP, and the main linac of 25 MeV, CW operation but no beam current requirement  Phase 1 – third step (2016)  Accomplish the linac of 50 MeV, CW and 10 mA beam (?)  Phase 2 (2022)  Accomplish the linac of not lower than 600 MeV, CW and 10 mA beam  Phase 3 (2032)  Accomplish the linac of GeV, CW and 10 mA beam

Organization of the C-ADS accelerator physics studies A joint IHEP-IMP group of the accelerator physics was formed in March This is important for the two labs collaborating on the project.  General design of the accelerator scheme  Interface definition  Better for organizing reviews  Mutual benefit from exchanging experience on design method, tool utilization etc. The joint group is also helpful for the training of young staff and students. (training by work, seminars, schools) Frequent exchanges, discussions by video meeting etc.

Resources for the C-ADS accelerator physics IHEP and IMP have allocated sizable resources for the C-ADS accelerator physics  9 staff: 6 from IHEP (5 full time), 3 from IMP (1 full time)  9 students: 5 from IHEP, 4 from IMP Non-official collaboration from USTC: on HEBT- target interface Lacking of experience  Most staff are very young and new comers in the high- intensity proton linac  Almost all the students have entered the field recently (less than one year).  Intensive training is absolutely necessary. Recently IMP began to send young guys to IHEP for training

Key design features Beam energy for phased C-ADS development  5 MeV (RFQ + one SC cryomodule)  50 MeV (injector + one Spoke section)  150 MeV (full spoke section, for injection into T/R)  600 MeV (minimum energy for spallation)  MeV RF frequency  RF frequency for the main linac has been determined to be 325/650 MHz (same as Project-X)  RF frequency for the injectors follows two options: one is with 325 MHz and the other with MHz. IHEP and IMP are developing the injector in different schemes in parallel.

Superconducting acceleration structures  For main linac, single-cell spoke cavities and 5-cell elliptical cavities  For Injector-I, IHEP is pursuing spoke cavities (half and three-half wavelength)  For Injector-II, IMP is pursing HWR or CH cavities De-rated performance, redundancy and compensation methods to increase the overall linac reliability  De-rated parameters for operating key elements  Two injectors (hot-spare)  Redundancy in RF sources, power supplies and controls  Compensation methods for cavity and focusing element failures

Warm transitions between cryomodules to facilitate quick replacement of failed cryomodules, beam loss collimation and beam diagnostics Less types of SC cavities  Solution 1: 3 spoke cavities, 2 elliptical cavities  Solution 2: 1 HWR cavity, 2 spoke cavities, 2 elliptical cavities Space-charge dominant regime?  With 325-MHz injector, tune depression about 0.75, close to the regime  With MHz injector, tune depression about 0.64 (main linac), inside the regime

Main linac Layout of the C-ADS linac ‘ Hot stand-by ’ Local compensation Two identical injectors on line, either with scheme injector-1 or with scheme injector-2

Strategy for the first step At IHEP, we have studied different lattice schemes for the injector-I, and proposed the following strategy for the first 5-MeV section by end 2013 (if one long cryomodule of <11 m is acceptable)  Just building a full-scale RFQ (3.2 MeV) and a short cryomodule housing six cavities (~5.5 m). It accelerates the beam of MeV in nominal operation voltage.  It will accelerate beam to 5 MeV with reduced cavity performance or one cavity not working  It will accelerate beam to 5 MeV with half nominal operation voltage but an increased synchronous phase (no current requirement at this stage) For Injector-II at IMP, similar strategy can apply

It is helpful to ease the development requirement in the first step (number of cavities, cryomodule, infrastructure etc ) In the future, the six cavities will be reused in the full length cryostat (12 cavities) by discarding the short one.

Overall commissioning strategy This needs to be studied in the future Just some thoughts listed here  For Phase I – first step (5 MeV, no current requirement): CW RF, low-current pulsed beam  verify technical development of the RFQ, low-beta SC cavities and cryomodule  For Phase I – second step (25 MeV, no current requirement): CW RF, high-current pulsed beam  verify technical development of the MEBT and long cryomodules, performance of RFQ at nominal operation, performance of low-beta SC cavities with long-pulse beam, main linac test with at least one injector, beam characterization, deciding on future injector scheme based on the R&D performance)

A question to the review committee  If we commission the SC linac with pulsed beam, there are two options: one is to operate the linac in pulsed mode, there might be a problem concerning Lorentz-detuning; the other is just to extract the beam from the ion source in pulsed mode by keeping CW RF.  Should we design the linac being able to work in both CW and pulsed mode?

Review charges Reviewing the physics design what have been presented by the C-ADS accelerator physics group. Evaluating the profoundness, entirety and quality of the work of the AP group. Judging if the actual physics design is at the least level sufficient to help the C-ADS managers to make the decision: either that we can pursue the design scheme and particularly provide inputs for hardware R&D or technical designs, or that very important changes in the design scheme must be taken before going into hardware development.

Helping in choosing the most appropriate design solution among the more-than-one solutions for different subjects proposed by the AP group, or even suggesting a different approach. Suggestions to the accelerator physics work in the near future and in a longer term. Comments on if the actual manpower allocated for the physics design is appropriate. Comments on the collaboration both international and domestic.

Suggestions to the C-ADS management how to best pursue the C-ADS R&D phase (or Phase 0). What about technology development? There may be some additional specific questions to the committee.