Mu2e Protection Collimator, PC Andy Stefanik January 19, 2016.

Slides:



Advertisements
Similar presentations
A force applied over a surface is pressure.
Advertisements

BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
Cylinders and Actuators
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
Harvard PCM (Plate Cleaning Machine) Robert J. Simcoe (Bob) Ed Los Jonathan Grindlay.
Vacuum Vessel Production Readiness Review
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Steering Columns.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Senior Design: Validation of Design December 15, 2008.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
Shear Test Assembly update
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Blocking a b c d.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Warm Vessel Leveling Islands (Piers)
Selecting Electric Motors
Linear actuator Cylinders Single acting Double acting
Clutch Fundamentals.
HYDRAULICS & PNEUMATICS
C Air Compressor Up-fit and Plumbing Guide For LDI B3
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Additional Upstream Coil Shielding
IMP Cryomodule Assembly and Alignment
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
Internal Mount Flange Facing Machine
Senad Kudumovic Design engineer
Bunker Wall Design Wall ESS
SNS PPU Cryomodule Space Frame
Presentation transcript:

Mu2e Protection Collimator, PC Andy Stefanik January 19, 2016

Topics Requirements  Basic Physics  Engineering Integration Protection Collimator, PC Stand Installation Schedule To-do list January 19, 20162

Requirements PHYSICS: Mu2e Document The Compliance Report is Mu2e Document The PC complies with these requirements. ENGINEERING: Mu2e Document The PC complies with the requirements that are not marked TBD. January 19, 20163

Integration PC physical integration into the experiment is accomplished using the Mu2e CAD Integration Model, F January 19, 20164

PC cross sections January 19, 2016 Initial concept… Went from this to… 5

PC cross sections January 19, 2016 Moveable core “in” Moveable core “out” Stationary core Moveable core Vacuum vessel Up-down drive 6

PC core dimensions January 19, cm (3.15”) 50 cm (19.7”) 7

PC core dimensions January 19, cm (40”) 8

Beam scan aperture dimensions January 19, 2016 CF ID cm (7.812”) cm (8.75”) cm (8.25”) The requirement is cm (8.2”). 9 Beam scan aperture is centered on the beam.

Stationary core The stationary core is outside the vacuum vessel. 316L stainless steel weldment. Weight: 2,200 pounds. Overall dimensions (W x H x L): 515 x 454 x 1,016 mm (20.25” x ” x 40”) January 19,

Moveable core The moveable core is inside the vacuum vessel. 316L stainless steel weldment. Weight: 1,245 pounds. Overall dims (W x H x L): x x 1,031.1 mm (8.25” x 14” x 40.6”) January 19,

Vacuum vessel Outside dimensions (W x H x L): 254 x 654 x 1,162 mm (10” x 25.75” x 45.75”) 316L weldment. 770 pounds. January 19,

Vacuum vessel - Fabrication Box 635 pounds. 100% seal welded inside. Intermittent welds outside. Notched edges all around. January 19,

Vacuum vessel: Fabrication Top 135 pounds. Edge welded to the box. Not shown: A small port on top. Might use it for a gauge, leak checking. Option: Bolted top with indium seal. January 19,

Vacuum vessel: Loads Design:  Full external vacuum, 15 psi, with blank-off flanges on all of the ports, including the two beam ports.  Weight of the vacuum vessel, moveable core, and up-down drive components, ~ pounds, reacted along the two long surfaces of the center reinforcing plate. Lifting:  Weight of the vacuum vessel, moveable core, and up-down drive components, ~ 2,220 pounds, reacted at the lift points. Operating:  Same as the Design Loads except for the vacuum load on the two beam ports. January 19,

Vacuum vessel: Bellows Edge welded with CF flanges Bellows: 347 stainless steel CF Flanges: 304L stainless steel Gasket: copper 3” OD x 2” ID. The diameter might decrease in the final design. Extended length per segment: 1.05 Compressed length per segment: 0.2 Stroke per segment: 1.05 – 0.2 = 0.85” Required stroke: 8.25” January 19,

Vacuum vessel: Bellows Required number of segments: 8.25”/0.85” per segment = 9.7 → Use 10 segments. Ultimate number of cycles with 10 segments: 10,000 Expected number of cycles in the Mu2e experiment: 50 the first year and then roughly 1 per month after that. So the expected number of cycles is 100 to 200 over the lifetime of the experiment. Thus, we have a large margin on the number of cycles using the standard bellows. If we do not operate the bellows over its maximum range by using 12 segments and operating over the 10 segment range, the ultimate number of cycles remains at 10,000. January 19,

Vacuum vessel: Bellows From the vendor: The bellows will not squirm while under vacuum provided the flanges on the ends of the bellows are secure. However, if you vent the bellows to atmosphere while it is compressed, it will squirm. We will discuss bellows squirm with the beamline vacuum group and follow-up with the vendor. We will add an internal cylindrical guide in each bellows to prevent squirm if needed in the beamline vacuum system. Bellows diameter might decrease. Connecting rod diameter might increase. January 19,

Vacuum vessel: up-down drive Try to use a commercial linear lifter. MDC – 20 pounds maximum. January 19, 2016 LSM Ballscrew (Kurt J Lesker): Maximum axial load is 250 N (55 pounds) with a 6” clear bore and with a 300 mm maximum stroke. The full vacuum load is 425 pounds. The total lifting capacity of the lifter is 480 pounds which is less than half the moveable core weight. At this point, we are designing our own up-down drive. We continue to look for a commercial unit. 19

Vacuum vessel: up-down drive We are currently using a stainless steel screw jack. Other options are a scissors jack or a four-post jack. I have not found either of these jacks in stainless steel and with sufficient capacity yet and I don’t think I will. The screw jack is lubricated with grease. We need to purchase the jack with the rad-approved grease used in our beamlines or replace the OEM grease with our grease after we get it. Alternatively, we can purchase the jack with a rad-hard grease that is the vendor standard. January 19,

Vacuum vessel: up-down drive Core in the beam-on position January 19, Edge-welded bellows Worm gear machine screw jack with travelling nut Jack cross beam Frame Guards attach to the frame Spherical washer Connecting rod with pin connection at each end Extra internal volume at each beamline port to aid pump down

Vacuum vessel: up-down drive Core in the beam-scan position January 19, cm (21.6”)

Vacuum vessel: up-down drive January 19, 2016 Chart courtesy of Nook Industries Column strength for stainless steel jacks: PC load on one jack = 700 pounds max with 20” max screw length. 23 CAUTION: Chart does not include a design factor.

Vacuum vessel: up-down drive Jack info:  Capacity: 0.66 tons = 1,320 pounds.  Gear ratio: 24:1 (20:1 or greater ratio ACME machine screw jacks can be considered self-locking in the absence of vibration.)  Turns of the worm gear per inch of travel: 96  Torque to raise 1 pound: in-Lbs  Lifting screw diameter: 1”  Maximum allowable input: 0.5 horsepower  Maximum input torque: 14 in-Lbs  Maximum load at 1750 rpm: 1320  Duty cycle limit: 25% (75% time off) January 19,

Vacuum vessel: up-down drive Horsepower required to operate the jack with no arrangement of gearbox efficiencies included:  Load per jack: 700 Lbs  Input rpm: (96 turns of the worm gear per inch of travel) x (8.25 inches of travel) / 10 minutes = 80 rpm  Torque: (0.015 in-Lbs/Lb) x (700 Lbs) = 10.5 in-Lbs  Horsepower per jack: (0.006 hp with the 6:1 gear ratio) January 19,

Vacuum vessel: up-down drive Driver options:  Electric motor  Pneumatic motor  Pneumatic cylinder The pc environment:  Magnetic field: 350 gauss  Radiation level: TBD  Residual radiation: TBD January 19,

Vacuum vessel: up-down drive The current plan is to use an electric motor to drive the jacks. Working with others on the motor:  Dan Schoo: “We can supply you with the limit switches, a motor controller and a means of controlling it through ACNET. Once the motor is specified we can help find one and order it.”  Dan Schoo: “I have never done any research or read any data on operating AC induction motors in a strong magnetic field. I suspect that a 350 gauss field would freeze any motor.”  Nikolai Andreev (TD, mech eng) is looking at motors for the rotating collimator mid-way through the Transport Solenoid that work near the solenoid, so he might be able to help us on motor selection or solutions January 19,

Vacuum vessel: up-down drive Using a motor in the 350 gauss magnetic field is not settled yet. In the end, we may have to locally shield it. The motor might be equipped with a brake. A torque-limiting coupling will be used. January 19,

Vacuum vessel: Details The center of the aperture bore in the moveable core will be referenced to alignment fiducials on the stationary core. The PC will have brackets to mount Beam Loss Monitors. AD will pump down the PC along with the beamline. We have started working with the AD vacuum group on a plan. We might have to add a large pump-out port on the vacuum vessel. The PC has extra internal volume at the beam line ports to aid pump down, as shown on slides 20 and 21. The vacuum vessel is located to the stationary core. January 19,

Vacuum vessel: Assembly The connecting rod is seal welded to the upper conflat flange. The seal weld must be cut out to replace a bellows. January 19, Seal weld Bellows diameter might decrease. Connecting rod diameter might increase

PC Lift Points The stationary core has two lift points. These lift points are designed to lift the completely assembled PC. The vacuum vessel will either have one integral lift point or two separate lift points. The lift point(s) are designed for the weight of the vacuum vessel, the moveable core, and the up-down drive. The stationary core shall not be connected to the vacuum vessel when using the vacuum vessel lift points. January 19, At two points on the vacuum vessel.

Stand January 19, We will use the stand design that AD has for the beamline magnets. Rob Reilly sent me this photo of the stand. The stand is black in the photo. The PC stand will be made with 6061-T6 aluminum. The PC stand will have its own Engineering Note. Miniboone line

Stand The AD magnet stands will have an adjuster on top; the adjuster is shown below. The PC will not have the adjuster. January 19,

Installation The PC will be installed in the same way as the magnets will be installed. From Rob Reilly: “I intend to have these on stands with Hilman rollers, to bring the magnets in on the monorail and set them on their stands in the aisle, then roll them into place. Since we have to move the M4 line magnets in two directions I will have them on rotating rollers.” The protection collimator will be installed on its stand, rolled into the beamline, and aligned using the fiducials on the stationary core. After alignment, the electrical will be hooked up and the up-down drive will be tested. January 19,

Schedule January 19,

To-do List Review all of the final requirements. Continue working with the AD Groups. Complete PC final design. Internal Project review of the PC final design. Review the schedule. Analysis and Engineering Note for the PC. Analysis and Engineering Note for the stand. Analysis and Engineering Note for the vacuum vessel spreader bar if it has two lift points. Complete the Fermilab Engineering Manual Risk Assessment. January 19,