Summary of DCS Manufacturers Meeting March 22/23, 2004 Peter Woolner Mitretek Systems 703-610-1724.

Slides:



Advertisements
Similar presentations
NEXT STEPS Decide if you want to work with NCAT by November 1, 2007 Send Carol Twigg an with a copy to Kevin Lemoine.
Advertisements

Using ECF in the Company Market Alan Barlow: Claims Director Endurance Worldwide Insurance Ltd Automating the Claims Process Through Electronic Solutions.
S. N. Satashia, Prem Kumar, M. Jeyamani & Tata Sudhakar
Fundamentals of Data & Signals (Part II) School of Business Eastern Illinois University © Abdou Illia, Spring 2015 (February18, 2015)
DCPR FREQUENCY PLANS DCS MANUFACTURERS MEETING NOVEMBER 10, 2004 Peter Woolner Mitretek Systems
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Doc.: IEEE p Submission September 2008 Carl Kain, Noblis (USDOT) Response to Comments on Optional Enhanced ACR and AACR Values Date:
NTIA TRANSMIT SPECTRUM REQUIREMENTS FOR THE REVISED DCPRS CERTIFICATION STANDARDS DCS MANUFACTURERS MEETING NOVEMBER 10, 2004 Peter Woolner Mitretek Systems.
DBCP 21 Buenos Aires Argos 3 October 2005 ARGOS 3 – THE NEXT GENERATION Bill Woodward – SAI.
A SINGLE FREQUENCY GPS SOFTWARE RECEIVER
Heuristic Evaluation IS 485, Professor Matt Thatcher.
CDMA X RTT Overview. Global 3G Evolution.
August 16, 2000IMA1 Mathematical Challenges in GPS: New Opportunities Using New Civil Signals for Multipath Mitigation and Carrier Phase Ambiguity Resolution.
Club Program for October 2006 By Rick Sohl – K5RIC.
High survival HF radio network Michele Morelli, Marco Moretti, Luca Sanguinetti CNIT- PISA.
DCP COMMAND …bringing two-way communications to your DCPs.
DCP COMMAND …bringing two-way communications to your DCPs.
Phase Tracking During VHT-LTF
TRANSMIT SPECTRUM ISSUES MANUFACTURERS MEETING AUGUST 2004 Peter Woolner Mitretek Systems
1 Responses to Vendor Comments DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems
Doc.: IEEE /0099 Submission Payload Symbol Size for 11ax January 2015 Ron Porat, BroadcomSlide 1 Date: Authors:
Data and Computer Communications
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 PETER WOOLNER MITRETEK SYSTEMS KAY METCALF NOAA GOES DCS PROGRAM MANAGER NOAA DECISION BRIEFING STIWG AND TWG NOVEMBER 7-8, 2006 ASHEVILLE, NC.
1 EE 499 Wireless Communications Project by Team 4: Arati NagarkarHemant Samtani Supriya HerwadkarChinmay Shete Shivani KaushalSalil Sawhney.
Final Project Review Team Vibraid April Vibraid Michael Balanov (Mike) EE Spyridon Baltsavias (Spiros) EE Reona Otsuka (Leo) EE Andrew Woo (Andy)
Computer Communication & Networks Lecture # 05 Physical Layer: Signals & Digital Transmission Nadeem Majeed Choudhary
Satlink V2 (SL2-G312-V2) What are the differences compared to the prior Satlink?
Doc.: IEEE /875r1 Submission Hyun Seo Oh, ETRI July 2008 Slide 1 Radio Transmission Technology for V2V/V2I Applications Date: Authors:
WP4 – Sound Object Identification WP5 – Enriched Access Tools.
1 DCPRS CERTIFICATION STANDARD STATUS DCS MANUFACTURERS MEETING MAY 18, 2006 Peter Woolner Mitretek Systems
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
1 DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems Link Budgets.
…bringing two-way communications to your DCPs DCP COMMAND.
SPECTRUM ANALYZER 9 kHz GHz
1 CS v.2.0 Outstanding Items DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 THE GOES N GENERATION SATELLTES April 27, 2004 Peter Woolner, Mitretek Systems.
Options for Data Distribution in the GOES-R Series GOES User Conference SESSION 5 Peter Woolner / Mitretek.
DCPR TRANSITION FROM GOES I/M TO GOES N/P: A UNIQUE OPPORTUNITY FOR POWER REDUCTION DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems.
CDMA Technology OverviewFebruary, Page 3-1 CDMA Technology Overview Lesson 4 - CDMA Reverse Channels.
Doc.: IEEE /235r0 Submission May 2001 Philips SemiconductorsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
Amplitude/Phase Modulation
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
Transmission Media. Quiz: ANGEL->Lessons->Quiz 2 Figure 1Figure 2 Figure 3Figure 4.
Doc.: IEEE Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary PHY.
Doc.: IEEE /??r0 TG4a PresentationSlide 0 Ultra Wideband in Europe The final few regulatory processes May 2006.
Certification Standards V.2 Peter Woolner Noblis May 20,
EUM/OPS/09/VWG/003 M. Horny Issue 1 – October 2009 Page 1 Plans for the Introduction of a High Rate DCP Service on MSG DCP and HRDCP Comparison HRDCP.
Doc.: IEEE /1484r4 Submission January 2012 Hongyuan Zhang, et. Al.Slide 1 11ah Data Transmission Flow Date: Authors:
doc.: IEEE /409r0 Submission March 2002 Mathilde BenvenisteSlide 1 Persistence Factors in EDCF Mathilde Benveniste
Decom North Sea Late Life Planning Portal (L2P2) Design Workshop – Follow-up 13 January
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
1 Wireless Networks Lecture 19 cdmaOne/IS-95 Dr. Ghalib A. Shah.
Spectrum Policy Technological Solutions for Policy Problems Allen Petrin ©2003 all rights reserved 1 System Architecture for a Dynamic-Spectrum.
1 DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems /300 Auto Detect.
Experience with igloo2 FPGAs in the CMS HCAL upgrade Tullio Grassi Univ of Maryland, USA 10 Feb 2016.
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
RFI Protection Activities in IAA RAS
PHY Design Considerations for af
Contractor Mode Administration Tab Overview
UWB Receiver Algorithm
Gains provided by multichannel transmissions
Response to Comments on Optional Enhanced ACR and AACR Values
Response to Comments on Optional Enhanced ACR and AACR Values
Development Work Group 0209 Straw Man Update
Numerology for 11ax Date: Authors: March 2015 Month Year
HL-LHC power converter requirements Thermal settling drift
Month Year doc.: IEEE y18/r0 March 2018
Presentation transcript:

Summary of DCS Manufacturers Meeting March 22/23, 2004 Peter Woolner Mitretek Systems

Most Of The Proposed Changes Seem To Be Acceptable As Is B: 3.1 Format C: 3.2 Scrambling D: 3.4 Encoder Flush E: 3.5 Interleave (?) F: Prohibited Characters (?) G: EOT H: 3.8 Max Message I: 3.9 Freq Adjust (rt) M: Modulation Stability N: 4.4 Phase Noise P: Mid Band Spectrum Q: 4.6 Fail-Safe

Non-Agreed Items (1) A: 2.1 Timing Accuracy –All agreed 300 should be as tight as 1200 –Most considered ±0.1 s too tight but ±0.5 s was easy –The reason cited was the length of time after a GPS fix before shutdown is required –Corresponding reduction in message lengths are: Alloc. Window Bytes at 300 bps Bytes at 1200 bps 0.1 sec0.5 sec0.1 sec0.5 sec 5 sec sec

Non-Agreed Items (2) Frequency Plan, Frequency Stability, and Filters –1200 bps in 1500 Hz, 30 Hz, RRC required –1200 bps in 2250 Hz, ~100 Hz, RRC optional Relative effects (if max 20 ch at 1200) are: –Loose 20 channels at 300 bps –System data rate goes from 97.6 to 93.3 kbps –Max msg/hour goes from to (No Int’l chan, 25% 5 sec, 75% 10 sec)

Non-Agreed Items (3) Power Control was considered desirable but would be best if control was remote Became another item to consider in the DCPI discussion

DCPI NTIA is asking questions about the current DCPI link which does not meet their Power Flux Density requirements NOAA must respond in a few weeks I believe DCPI must be re-designed or it will be lost permanently

Potential Reasons for DCPI A revised and improved DCPI link could be used for the following: –An alternate timing reference –An alternate frequency reference –A remote control system including EIRP –An easier way to reduce required DCP EIRP (saving battery or prime power consumption) –A failure analysis tool –A last resort override for NOAA –Platform interrogation

Possible Power Reduction Process Measure all uplink powers relative to pilot and calculate average Notify all users of this average level Get 1200 bps users to reduce to avg. level Get 300 bps users to reduce to avg. -3 dB Repeat until desired level is reached ALL users would need to cooperate over the full adjustment period (months or years) unless remote power control is made mandatory

Steps to Implement a New DCPI Users decide what they want it to do System design and format for how to do it Vendors design and estimate costs Users decide if the cost is worth the benefits