Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Dan Cheng QXF Structures Working Group November 7, 2014 Implications for the split-shell MQXFS concept.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
TQS Structure Design and Modeling
SQXF Mirror QXFSM1 Strain Gauges
ERMC/RMM activities May 2017
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II

Outline 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 2 Observations and feedback on assembly processes (old) Axial end loading modifications (new) Summary and Status (updated)

Improved Coil Support Spud 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 3 Procedures and tooling were adjusted after the disassembly incident Redesigned coil support spud was incorporated into the use of coil pack builds #3-5 – Screws positively engage with each coil to prevent relative motion

MQXFS1 Coil Pack Insertion Rails 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 4 Coil pack was inserted into the shell & yoke assembly with the insertion rails

MQXFS1 Coil Pack Insertion Rails 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 5 Rails were removed when the bladders were first cycled

MQXFS1 Master Keys & Shims 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 6 MQXFSD Alignment and load keys required many shims in nominal dimensions MQXFS1 keys were increased in thickness – 1 mm per each load key half, and 2 mm in alignment key – This reduced the amount of shim required during bladder operations Material was changed to bronze instead of mild steel

MQXFS1 Wire Routing 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 7 IL wiring is being routed under the axial end plates via SLA (Accura Bluestone) wire guides

Threaded holes in Collars 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 8 There are still some chips that are being generated by the screwing/unscrewing process of the aluminum collarpacks – Chips were vacuumed after bolting operations Long magnet designs plan for Load Pad and Collar stacks to be preassembled, and only load pads would be bolted – CERN has already tested this option in the short model with promising results

Feedback on Axial Loading 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 9 First time the axial loading rig was used with real coils (with leads) – Copper-stabilized leads made it difficult to position aluminum pusher w/o damaging Kapton around cable – Size of pressure cylinder required hardway bending of exiting leads due to the sizes of the aluminum pusher, cylinder mounting baseplate, and backing plate

Feedback on Axial Loading 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 10 Modifications employed – Changed pressure cylinder from RSM-1000 to RSM-750 Loading only required 18,000 lbs. force (4000 psi on 4.5 in 2 ) – Cylinder change reduced radial requirement by ¼” (6.35 mm) = less hardway bend Cut back surfaces on aluminum pusher, cylinder mounting base, and backing plate – Also added a generous radius (¼”) to the pusher channels (next slide)

Feedback on Axial Loading 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 11 Temporary protection of leads using sections of heat-shrink tubing Radii on edge of grooves

Summary 8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 12 Magnet assembly incorporated improvements – Redesigned coil support spud was used – Coil pack insertion rails were used successfully – Increased key thicknesses to reduce required shimming – Wire guides to protect and route instrumentation wires – Axial loading system required some modifications Status – Axial loading was completed this week – Electrical QA result show no issues (report to follow) – Pizza box is being fabricated; magnet splice activities to start next week – Connector mounts & wiring and magnet support are in fabrication – Shipping and handling is being coordinated between FNAL and LBNL

8/27/2015 MQXFS1 Assembly Observations and Feedback Part II 13 Additional Slides