Telecommunication Laboratories Jia-Lun Wang, Shinn-Yan Lin, Yi-Jiun Huang, Huang-Tien Lin and Chia-Shu Liao APMP 2012 November 26, 2012 MSL Wellington,

Slides:



Advertisements
Similar presentations
Remote Monitoring and Control System
Advertisements

1 1 COMPASS Satellite Navigation System Development Nov. 26 th -28 th, 2008, Beijing China Satellite Navigation Project Center SIDEREUS 2008.
External Interfaces and the Connector Board Interfaces Specified Originally 2x Camera Link camera2x Gigabit Ethernet camera Power Supply (9V to 36V)10/100.
ESE – Andrew Rusek Applications of Computer Modeling in Electromagnetic Compatibility (EMC) Tests (Part1) P8. Field Pattern of Three Radiating.
Global Navigation Satellite Systems Research efforts in Luleå Staffan Backén, LTU Dr. Dennis M. Akos, LTU.
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
Visualization of Wireless Computer Networks Dunbar, Matt D., Kansas Applied Remote Sensing Program and University of Kansas Geography Department, and Becker,
The importance of switching in communication The cost of switching is high Definition: Transfer input sample points to the correct output ports at the.
Harbin Institute of Technology (Weihai) 1 Chapter 2 Channel Measurement and simulation  2.1 Introduction  Experimental and simulation techniques  The.
Lesson 4 – UNDERSTANDING NETWORK CABLING. Network topologies Network cabling Installing and maintaining Network cabling Selecting and installing a SOHO.
Setup “Do’s & Don’ts Presented By:
Chapter 26 Communication Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify common.
Tunisia, April 2015 “Homologation Procedures & Type Approval Testing for Mobile Terminals for ARB Region” Presented by: Mr Zied SALHI.
Unpack From Box and Inventory Technical Bulletin User’s Manual Assembly Procedure Direct or Strap Pole Mounting Kit Face to Southern Sky High Temperature.
Handheld Spectrum Analyzer R&S FSH
Ground Station for Satellite Operation (CySat) May Client: Matthew Nelson Advisor: John Basart Team: Karl Deakyne, SungHo Yoon, Luke Olson Cyclone.
CNS Systems, Inc. Communication, Navigation and Surveillance © 2002 CNS Systems, Inc. GPS Receiver Test Bed at USNO Prepared for the 34th Annual Precise.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
Time stamping with CAEN V1290N Bled, 26 th – 28 th March 2008 Dušan Ponikvar, Dejan Paradiž Faculty of Mathematics and Physics Ljubljana, Slovenia.
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Page 1CSNC 2012 Integration of COMPASS in a multi-GNSS receiver: frontend design, signal processing issues and results from early operations N. Falk, T.
Wireless Sensor Networking for “Hot” Applications: Effects of Temperature on Signal Strength, Data Collection and Localization.
HIMALAYA Test Review 16/12/2013 STI Deliverables: D4.1, D4.2 and D4.5.
Development of Long-Range UHF-band RFID Tag chip Using Schottky Diodes in Standard CMOS Technology Nhan Tran, Bomson Lee, and Jong-Wook Lee School of Electronics.
CZEPOS – a Multipurpose Positioning System for the Czech Republic Oldřich Pašek – Czech Office for Surveying, Mapping and Cadastre Jan Řezníček – Land.
High Speed Data Converter University
GNSS Receiver - Software Radio Concept František Vejražka Czech Technical University in Prague Faculty of Electrical Engineering.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
GPS based time synchronization of PC hardware Antti Gröhn
Network Computing Laboratory Radio Interferometric Geolocation Miklos Maroti, Peter Volgesi, Sebestyen Dora Branislav Kusy, Gyorgy Balogh, Andras Nadas.
Communication Networks Fourth Meeting. Types of Networks  What is a circuit network?  Two people are connected and allocated them their own physical.
(More) Interfacing concepts. Introduction Overview of I/O operations Programmed I/O – Standard I/O – Memory Mapped I/O Device synchronization Readings:
Time and Frequency activities at CENAMEP Panama, 2015.
NSGF 2000 PICO EVENT TIMER HERSTMONCEUX SLR STATION.
Claudinei Rodrigues de Aguiar Federal University of Technology - Parana Paulo de Oliveira Camargo São Paulo State University.
Calibration of geodetic (dual frequency) GPS receivers Implications for TAI and for the IGS G. Petit.
GLOBAL POSITINING SYSTEM WORKING,ERRORS AND CORRECTION USING DGPS Department Of Electronics and Communication Engineering.
November 15 Timing is Everything A software approach for a generalized profilometer Dr. John B. Ferris Stephen Chappell Cameron Rainey.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Troubleshooting Your Network Networking for Home and Small Businesses – Chapter.
Computing Basics Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
University of Kansas 2004 ITTC Summer Lecture Series Network Analyzer Operation John Paden.
KHz-SLR PC Board Eastbourne, October 2005 for kHz SLR Complete PC Board.
 It is the transmission of data from one place to another.  A data communication system is made up from hardware, software and communications facilities.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Advanced Science and Technology Letters Vol.44 (Networking and Communication 2013), pp Preliminary Application.
View on GPS and Galileo ‘From across the Atlantic…’ Ruth E. Neilan International GNSS Service (IGS) Central Bureau Jet Propulsion Laboratory/California.
BPM stripline acquisition in CLEX Sébastien Vilalte.
SIDE SCAN HARDWARE CONFIGURATION
Mini-GPS2 and Canopy GPS Synchronization
TOPIC : Test Techniques for some complex circuits UNIT 4 : Design For Testability Module 4.2: DFT Techniques.
4.2.1.Position determination Proposed modifications AECS 12 nd. meeting Moscow, 9-11 February 2016.
Korea University Ubiquitous LAB. Chapter 8. Design selection Ph.D Chang-Duk Jung.
GPS Receiver Calibration by BIPM Aimin Zhang National Institute of Metrology(NIM), China APMP/TCTF 2012 in Wellington, New Zealand.
COMPUTER NETWORKS Lecture-8 Husnain Sherazi. Review Lecture 7  Shared Communication Channel  Locality of Reference Principle  LAN Topologies – Star.
Astronomisches Institut der Universität Bern Global Navigation Satellite Systems for Positioning and Time Transfer T. Schildknecht, A. Jäggi R. Dach, G.
Vladimír Smotlacha, CESNET Alexander Kuna, IPE Time and Frequency Transfer in All-optical Network TNC 2011 Prague 17 May 2011.
Yasuhisa Fujii National Metrology Institute of Japan (NMIJ) Jia-Lun Wang National Time and Freq. Standards Lab,Taiwan (TL) Michael Wouters and Bruce Warrington.
Modem. Introduction: A modem [Modulator -Demodulator] is a device. Data communication means transmitting digital information form one computer to other.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
GPS receiver calibration: a tutorial Michael Wouters, NMIA Bruce Warrington, NMIA.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
GPS Receiver Calibration Demostration - Principle and Data Analysis
System Design, Implementation and Review
Installation-Troubleshooting-Maintenance
TWSTFT using DPN signals
ADC32RF45 Testing.
CH-6 CABLE TV.
Presentation transcript:

Telecommunication Laboratories Jia-Lun Wang, Shinn-Yan Lin, Yi-Jiun Huang, Huang-Tien Lin and Chia-Shu Liao APMP 2012 November 26, 2012 MSL Wellington, New Zealand National Time and Frequency Standard Lab., Telecommunication Laboratories(TL), Chunghwa Telecom Co. Ltd., Taiwan GPS Receiver Calibration Demostration

Telecommunication Laboratories GPS Receiver Calibration Exercise  Introduction  The Procedure for GPS Receiver Calibration System Setup (Hardware & Software) Data Record & Analysis Observation Data at MSL  Calibration Trip in Asia GNSS Receiver Calibration Trip  Detailed Principle and Data Analysis  Summary and Discussion

Telecommunication Laboratories Introduction  GPS time and frequency is one of the most accurate techniques for comparison of remote clocks.  To implement GPS calibration periodically is necessary for providing accurate time transfer. Absolute Calibration Differential Calibration Link Calibration  In this report, the GPS exercise demonstration and detailed calibration procedures are presented.

4 GPS Calibration System Architecture Telecommunication Laboratories

GPS Calibration System Accessories  GNSS receiver Septentrio PolaRx4 PRO  Antenna CRG2-DM-mini-GG choke ring  Antenna cable About 45m long  Personal Computer For data record  Time Interval Counter  Aluminium Tripod

Telecommunication Laboratories Antenna Mounting & Cable Setup (I)

Telecommunication Laboratories Antenna Mounting & Cable Setup (II)  Mounting Location Considerations Choose a location for the GPS antenna assuring maximum visibility of the satellites The optimum location must not shaded by any structure or by other antennas  Spacing to Other Antennas & Equipment Ensure a proper spacing from other antennas to avoid desired signal degradation because of interference Avoid installing antenna or routing cable around other communications equipment generating frequencies harmonic

Telecommunication Laboratories Antenna Mounting & Cable Setup (III)  Cable considerations Minimizing the length of the cable from the antenna to the receiver for maximum signal strength Using low loss type cable as GPS antenna cable (ex. CFD400- LW 16.8 GHz )

Telecommunication Laboratories GNSS Receiver  Multi-constellation GPS 、 GLONASS 、 Galileo  Multi-frequency GPS L1/L2/L2C/L5 GLONASS L1/L2 Galileo E1/E5a/E5b/E5  External 10 MHz reference To synchronize the GNSS measurements  Networking, remote operation, and data logging

Telecommunication Laboratories GNSS Receiver Setup  Connect the antenna cable to the N-type connector of receiver  Use a RG-58 cable to input external 10 MHz as frequency reference input of receiver  Use a RG-58 cable to connect 1PPS out of receiver to the input of counter  Connect USB cable to PC  Power on the receiver

Telecommunication Laboratories Time Interval Counter Setup  Connect 1PPS output of the receiver and Device under test to the counter input of A and B, separately  Make time interval measurement

Telecommunication Laboratories Cable Dealy Measurement  First, connect BNC T-Connector to time interval counter (TIC)  Second, Connect 1PPS output of the time source to one side of T-connector  Finally, Connect the other side of T-connector to TIC  Make time interval measurement (Cable Delay) 1PPS input Cable under-test

Telecommunication Laboratories Software Setup (Receiver, TIC)  Receiver software - RxControl Control receiver Log data Monitor navigation solution  Time Interval Counter software Measurement data record with time tag

Telecommunication Laboratories Data Record & Analysis Rinex to CGGTTS Rinex File CGGTTS File Data Analysis

Telecommunication Laboratories Common Clock Tests (Polax4_965- Polax4_966)

Telecommunication Laboratories Common Clock Tests (TWTF- Polax4_965)

Telecommunication Laboratories Observation Data at MSL

Telecommunication Laboratories Calibration Trip in Asia Ref. from ministry of foreign affairs republic of CHINA (TAIWAN)