MADX tutorial: injection and extraction systems Dr Rob Apsimon Dr Öznur Mete.

Slides:



Advertisements
Similar presentations
Update on the Effect of the Septum Stray Field Stephan I. Tzenov 29 April 20151EMMA Commissioning Meeting.
Advertisements

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Eric Prebys, FNAL.  So far, we’ve talked about nice, periodic lattice, but that may not be all that useful in the real world. In particular, we generally.
Neil Marks; DLS/CCLRC Cockcroft Institute 2005/6. Injection and Extraction into/out of Accelerators Neil Marks, DLS/CCLRC, Daresbury Laboratory, Warrington.
M. LindroosNUFACT06 School Accelerator Physics Transverse motion Mats Lindroos.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Spin Tracking Using the Bmad Software Library David Sagan Cornell Laboratory for Accelerator-Based Sciences and Education.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
Accelerator Physics Issues Shekhar Mishra Sept 17-19, 1996 Main Injector DOE Review.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Lecture 7 Lattice design with MAD-X Dr. Suzie ASTeC Intense Beams Group STFC Rutherford Appleton Lab.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
MadX proposals R. De Maria, 29/8/2014. Makethin and thick dipoles Issues: Dipole edge elements cannot be used together thick dipole elements unless one.
Measurements at 40cm and Computer Aided Segment By Segment corrections Measurements at 40cm and Computer Aided Segment By Segment corrections Piotr Skowroński.
Eric Prebys, FNAL.  In our previous discussion, we implicitly assumed that the distribution of particles in phase space followed the ellipse defined.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
EMMA injection & extraction Takeichiro Yokoi(Oxford University)
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
New Gantry Idea for H + /C 6+ Therapy G H Rees, ASTeC, RAL 4 th September, 2008.
HYBRID WARM-COLD SYNCHROTRON FOR THE MUON COLLIDER Al Garren July 28, 2011.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
UPDATE IN PTC-ORBIT PSB STUDIES Space charge meeting ( ) * Vincenzo Forte * Follows LIS meeting presentation 16/04/2012.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Harmonic.
Principals of fast injection and extraction R. Apsimon.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Bug Elimination Ghislain Roy MAD-X Meeting 09 May 2014.
Lecture 8 Lattice design with MAD-X Dr. Suzie Sheehy ASTeC Intense Beams Group Rutherford Appleton Lab.
Lecture 7 Lattice Design & MAD-X Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
, UKNF Meetin, Imperial College J. Pasternak Status and Recent Progress in the Muon FFAG Designs J. Pasternak, Imperial College, London / RAL.
FFAG 4-Bend Injection Line into EMMA C. Johnstone, Fermilab EMMA phone conference July 24, 2007.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
Specifications for Central Region Layout
Orbit Response Matrix Analysis
Review of new High Energy Rings
ILC Z-pole Calibration Runs Main Linac performance
Injection system design for high-energy circular collider FCC-hh
Lecture 7 Lattice design with MAD-X
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Alternate Lattice for LCLS-II LTU Y
MD Studies for LIU PS Injection
Multiturn extraction for PS2
Strip-line Kicker R&D at KEK-ATF
PS2 Injection/Extraction Layout
Multi-Turn Extraction for PS2 Preliminary considerations
Comparison of NMC rings for PS2
Pulsed Sextupole Injection for Beijing Advanced Photon Source
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Linear beam dynamics simulations for XFEL beam distribution system
Booster to Ion Ring Transfer Line
Presentation transcript:

MADX tutorial: injection and extraction systems Dr Rob Apsimon Dr Öznur Mete

What you will learn You will learn to use the follow new MADX commands: – Seqedit: edit and existing sequence Don’t need to rewrite the entire sequence from scratch! – savebeta and beta0: Obtain and use beam parameters from an arbitrary point in an existing sequence Need this to match injection/extraction cells – Match constraints with macros Vastly more flexible than the normal matching routine

Add new sequence to your sequence file (ex6.seq) Set your kicker and septum strengths to zero initially Define the kicker and septum magnet as kickers

Modify your madx file Remove “stop” command from old file Define kickers and septum magnets in storage ring sequence. Use seqedit command to insert markers and magnetic elements into the storage ring.

Use savebeta to obtain beam parameters at start of injection/extraction cells

Create a macro for the extraction cell Define beam command for the extraction cell sequence Define a macro to “use” the extraction cell sequence and run the Twiss module with the beta0 command

Match with the use_macro command The kicker strength needs to be enough to clear the septum blade of the septum magnet (2 cm in this example) The septum magnet strength needs to be enough for the beam to clear the outer radius of the downstream quadrupole (1 m in this example)

Plot the horizontal position through the cell

Your beam trajectory should look like this!

Seqedit Extract – Extracts a subsequence from an existing sequence Cycle – Change the start point of the sequence Flatten – Removes drift lengths from a used sequence Move – Moves the location of one or more elements in a sequence

Seqedit Install – Inserts an element into an existing sequence Remove – Removes an element or group of elements from a sequence Replace – Replaces one or more existing elements in a sequence with new elements Reflect – Reverses the order of elements in a sequence

Seqedit: extract Define the kicker kicks Use seqedit to put in the markers “msept” and “mquad” and extract the sequence for the extraction region