Hoeilaart, 19 February 2009 Slide 1 CITE tests for 06-131 and 07-038 HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.

Slides:



Advertisements
Similar presentations
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Advertisements

Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Larry Wolf, chair Marc Probst, co-chair Certification / Adoption Workgroup March 19, 2014.
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 20 March 2014 Authors: NameCompanyPhone .
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22,
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Eurostat Standardisation DIME-ITDG 2015 Item 6 DIME-ITDG February
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Frascati, 16 July 2009 Slide 1 CITE tests for and HMA-T Phase 2, AR-2 Meeting 16 July 2009, Frascati Nicolas Lesage, IGN.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
HMA Identity Management Status
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
CEOS OpenSearch Project II
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
WPS updates from ESA Projects
Ordering Services for EO Products SWG ATS / ETS
HMA Identity Management Status
IMAA-CNR activity report
CITE tests for and HMA-T Phase 2, FP Meeting
Ordering Services for EO Products SWG ATS / ETS
CEOS OpenSearch Project II
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-FO Task 1 EOP Metadata
HMA Follow On Activities
CEOS OpenSearch Project II
Contributions to Testing and Reference Data
Submission Title: [ e Closing Report for November 2015 Session]
Standardisation Status Update
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
Web Service Security support in the SSE Toolbox
CITE tests for and HMA-T Phase 2 Progress Meeting
ESS Standardisation State of play
Ordering Services for EO Products Abstract Test Suite (ATS)
CEOS OpenSearch Conformance Test Document
HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
CITE tests for and HMA-T Phase 2, FP Meeting
CEOS OpenSearch Project
(Minimal and INSPIRE Conformance Levels)
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
CNR-IMAA Proposal ( and )
EO profile for WMS progress report
Presentation transcript:

Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN

Hoeilaart, 19 February 2009 Slide 2 Toc  Work performed  Work planned  Schedule  Issues and concerns

Hoeilaart, 19 February 2009 Slide 3 Work performed  WP0 – Management Meetings & telecons: KO meeting, September telecon Reporting  WP1 – Improve P&P HMAT-TN-0001-IGN HMA-T Phase 2 Testing Policy, Issue 1, 25/08/2008HMAT-TN-0001-IGN  Defines the ATS and ETS development process for HMA-T Catalogue protocols  Specifies input, output, context, resources of the process HMAT-TN-0001-IGN HMA-T Phase 2 Testing Policy, Issue 1, Revision 1, 03/02/2009HMAT-TN-0001-IGN  Includes an ATS template based on the other partners’ ATS layout

Hoeilaart, 19 February 2009 Slide 4 ATS and ETS development process Candidate Protocol Implementations Report Test Platform Support Deployed ETS ATS Service Protocol ATS, Acceptance test plan Recommendations for evolution of the protocol Test report Test Platform Reference Impl. Deployment & validation Development Platform ETS Reference Impl. Test Data, ETS & documentation Issues

Hoeilaart, 19 February 2009 Slide 5 Work performed  WP2 – CITE Tests for OGC & WP3 – CITE Tests for OGC Spacebel and ESA propose that IGN will be the editor of the ATS and ETS that will be presented/submitted to the CITE WG. The IGN document should integrate the ATS and ETS contributions from other partners with the same CITE subject (CNR and con terra). The Policy document should ensure that the “merging” at the end will be straightforward  Agreed in principle.  The convergence between the different inputs will not be so straightforward even with the policy document. IGN proposes to handle the coordination.

Hoeilaart, 19 February 2009 Slide 6 Work planned  WP0 – Management Attend meetings and telecons Reporting Resolve RIDS and open actions  WP1 – Improve P&P Revision 2 to be submitted end of Feb Revision 3 (including ETS Template) to be submitted end of March  WP 2 & 3 – CITE tests Develop ATS and CTL test scripts for OGC and OGC Submit ATS to EO EP and CIM EP SWG in OGC Submit ETS to OGC CITE SC

Hoeilaart, 19 February 2009 Slide 7 Proposed schedule  (WP1) Revision 2 of HMAT-TN-0001-IGNHMAT-TN-0001-IGN  (WP2&3) First draft ATS merging partner’s ATS + list of issues  Start of ETS development  (to be confirmed) : teleconf to address the issues  (WP2&3) Consolidated draft ATS for a week review  (WP1) Revision 3 of HMAT-TN-0001-IGN including ETS TemplateHMAT-TN-0001-IGN (W2&3) Submission ATS to OGC SWG  (W2&3) Deployment on the ESA Test Platform / release of ETS  During the support phase : revise ATS and ETS as needed Submit ETS to CITE SC

Hoeilaart, 19 February 2009 Slide 8 Issues  Scheduling Revised date of AR-2  Coordination Anticipate release of 1st draft ATS and list of issues 6 march 2009 Confirm a teleconf around 13 march 2009 Anticipate review of consolidated ATS between march 2009

Hoeilaart, 19 February 2009 Slide 9 MAJOR RIDs  YC-01 : Document was supposed to be independent of "HMA“ (…) catalogue specific content was to be separated from policy part Revision 2 of HMAT-TN-0001-IGNHMAT-TN-0001-IGN OGC already has its own policy specification  YC-02 : MOM-2003 required ATS and ETS documentation to be stand-alone documents. The current guidance uses HMAT document template. The information should be in a document (e.g. draft OGC change request for ATS and normal OGC template for ETS HMAT-TN-0001-IGN is not expected to become an OGC DocHMAT-TN-0001-IGN IGN will provide ATS and ETS as OGC document.  YC-03 : ETS Template Revision 3 of HMAT-TN-0001-IGN (lack of feedback)HMAT-TN-0001-IGN  YC-05 : ETS scripts should not stop after first non-conformance, even when non- conformance wrt a mandatory requirement Revision 2 of HMAT-TN-0001-IGNHMAT-TN-0001-IGN Stop only if the non-conformance blocks the testing

Hoeilaart, 19 February 2009 Slide 10 Open actions (1/2)  #51: Propose an acceptable planning possibly with incrementals delivery Done in this presentation  #50: Confirm merging of ATS and ETS documents into a document to be submitted to OGC Wrong formulation of action : ATS and ETS will be provided as separate documents merging ATS and ETS from partners Done in this presentation  #49: include guidelines on conformance classes in Policy document Done (no RID on this)  #48 : Separate « policy » part from catalogue specific parts in policy document Revision 2 of HMAT-TN-0001-IGN (See YC-01 RID)HMAT-TN-0001-IGN

Hoeilaart, 19 February 2009 Slide 11 Open actions (2/2)  #47: Explain status of ISO19139, « srv » namespace and issues as per MOM Done in coordination with ERDAS (F. Houbie)  #35: Align conformance class to take into account proxy implementations Noted, but there is an issue related to reference specs not established to enable this  #34: Includes rules listed in MOM in policy document update Partially done Double check this in preparation of Revision 2 of HMAT-TN-0001-IGNHMAT-TN-0001-IGN  #12: Provide information on ISO on the wiki Oops!? To be done ASAP