Take 5 for Safety E. Lessard March 22, 2016. Pressure Safety Accident  Tallahassee, Fla. — On Wednesday, Oct. 21, 2015 at about 10 a.m., an accident.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Lock Out/Tag Out (LO/TO)
Lockout/Tagout Awareness Training
Lockout/Tagout/Verify Awareness
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
The Control of Hazardous Energy
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
Lockout/Tagout for Injection Molding
A Presentation of the SPI-OSHA Alliance
Lockout/Tagout for Thermoforming Control of Hazardous Energy OSHA 10-Hour Outreach Training Program for the Plastics Processing Industry A Presentation.
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout (The Control of Hazardous Energy)
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Lockout/Tag-out Procedures
Lockout/Tagout Training for Authorized Employees Murray State University.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout - Tagout Control of Hazardous Energy CFR
Lockout/Tagout for Extrusion
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Lockout / Tagout Control of Hazardous Energy
Lockout/Tagout Authorized Employee Slide Show Notes
Trindel Insurance Fund
LOCKOUT TAGOUT (LOTO) Awareness Training Program 1 Updated 6/29/04 by SN.
A Presentation by Vincent & Vincent Companies
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management LOTO – Authorized May 2011.
Process Safety Management
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
Basic Isolations and Lock Out. Disclaimer  IMPORTANT: The information in this presentation is of a general nature, and should not be relied upon as individual.
Control Of Hazardous Energy
CONTROL OF HAZARDOUS ENERGY. Types of Energy To Be Controlled  Kinetic – Energy of motion  Potential – Energy of position  Electrical – From generated.
Mine Safety & Health Conference HAZARDOUS ENERGY CONTROL LOCK and TAG Todd Nicholes.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
A Presentation of the SPI-OSHA Alliance
Energy Control Procedures Lockout/Tagout 29 CFR Paul Schlumper, PE, CSP Georgia Tech Research Institute.
Pennsylvania Bureau of Deep Mine Safety Lockout/Tagout Program.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
Lockout/Tagout.
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Lock out / Tag Out The Control of Hazardous Energy.
Procedures.
How to Effectively & Efficiently Control
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
Pressure release when breaking containment
Take 5 for Safety E. Lessard March 17, Equipment Identification Issue at NREL  On March 10, 2015, an NREL employee was performing preventative.
Hazardous Energy Isolation (LOTO) Awareness Plus
Lockout/tagout for authorized employee
LOCKOUT/TAGOUT/VERIFY
Energy is a good servant but a cruel master.
Start the program by pressing “enter”.
Chapter 9 Safety Permit Systems
Lock Out & Tag Out.
Energy Control Procedures Lockout/Tagout 29 CFR
Proper Lockout Procedure
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
Control of Hazardous Energy Lockout/Tagout 29 CFR
The Control of Hazardous Energy
Lock Out Tag Out Michael Vangeli 11/15/2018.
Energy Control Procedures Lockout/Tagout 29 CFR
LOTO(V) Procedures MESH Process Safety, 8.7 Energy Control
Presentation transcript:

Take 5 for Safety E. Lessard March 22, 2016

Pressure Safety Accident  Tallahassee, Fla. — On Wednesday, Oct. 21, 2015 at about 10 a.m., an accident occurred at the National High Magnetic Field Laboratory that resulted in the fatality of a mechanical worker  Two mechanical technicians were attempting to remove a blind flange from supply piping on a magnet cooling water system  When loosening the nuts on the flange collar, an explosion occurred. The flange, the water behind the flange, or some combination of both, struck and propelled one mechanical technician backward and into the metal support structure for the cryostat, resulting in his death  A second technician, who was approximately 10 feet away at the time of the explosion, sustained minor injuries

Analysis  It was discovered that a compressed air valve that delivers the compressed air needed to positively seat a pneumatic valve for this water system was in a CLOSED position, and thus was not delivering compressed air to positively seat the valve  Leakage of water past the valve caused high pressure water (~325 psig) to compress the air in the supply piping, which allowed pressurized water and pressurized air to be built up behind the flange  Zero energy verification was initially performed for this segment of the piping approximately two weeks prior to the incident  Although the water drain and vent valves on the water supply piping were initially opened, neither of these valves nor the compressed air valve were locked into their OPEN positions  The flange was successfully removed and re-installed several times over the first week; during the second week of work, a LOTO was removed so that electricians could test solenoid actuators on the pneumatic valves  Upon completion of the electrical tests, the LOTO was re-established; however a re- verification to confirm zero energy in the cooling water piping was not performed  Sometime during this testing period, the compressed air valve needed to seat the pneumatic valve was CLOSED; this, combined with the fact that there was no re- verification to confirm zero energy prior to subsequent flange work, led to the incident 3

Causal Factors Identified  There was no physical re-verification performed by the Primary Authorized Employee to confirm zero energy in the water piping prior to removal of the blind flange  There was no single person coordinating day-to-day tasks  Personnel relied on an ineffective LOTO process in their efforts to eliminate hazards  Work planning and control for the work was less than adequate; documents to plan the work reduced the apparent risk down to a point that called for no additional reviews by subject matter experts or safety personnel  Workers lacked a comprehensive understanding of the cooling water system  The cooling water system was not designed with positive isolation points to enable complete and verifiable separation of high-pressure water from the worker  Human factors, including labeling of piping, valves, and visual indicators, were not well integrated into the magnet cooling water system design 4

Picture of the Week – Safety Briefing Photo Who convinced the guy to climb up and push the button in order to start the projector? 5