HEP 2007 – 20 Jul 2007 · Manchester, England Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer F.Petrucci INFN Sezione di Roma Tre and Dipartimento.

Slides:



Advertisements
Similar presentations
The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
Advertisements

The ATLAS B physics trigger
ATLAS Muon test beam, E. Etzion, NSS System Test of the ATLAS Muon Spectrometer in the H8 Beam at the CERN SPS Erez Etzion (Tel Aviv University),
D. Peterson, Muon Spectrometers at ATLAS and CMS, presentation to LEPP 19-Nov  spectrometers at ATLAS and CMS Our charge: Survivability Resolution.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
IJAZ AHMEDNational Centre for Physics1. IJAZ AHMEDNational Centre for Physics2 OUTLINES oLHC parametres oRPCs oOverview of muon trigger system oIdea of.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
LHeC : Muon Systems L. Pontecorvo.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Manoj Kumar Jha INFN – Bologna On Behalf of ATLAS Muon Calibration Group 20 th October 2010/CHEP 2010, Taipei ATLAS Muon Calibration Framework.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Marcello Bindi, on behalf of ATLAS Collaboration KRUGER 2010 : Workshop on Discovery Physics at the LHC 06/12/20101.
1998 IEEE Nuclear Science Symposium, Toronto, Canada High-Precision, Large-Volume Particle Tracking U. Bratzler* Outline (Example: Muon Tracking in ATLAS)
Muon-raying the ATLAS Detector
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
M. Bianco On behalf of the ATLAS Collaboration
Status & Readiness of the ATLAS Muon Spectrometer J. Chapman - University of Michigan on behalf of the ATLAS Muon Groups Particular Thanks to C. Ferretti,
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Luca Spogli Università Roma Tre & INFN Roma Tre
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Precision Drift Chambers for the ATLAS Muon Spectrometer
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Detectors for VEPP-2000 B.Khazin Budker Institute of Nuclear Physics 2 March 2006.
( ATLAS was designed for LHC: L=10 34 cm -2 s -1 ) [ Now we expect 7.5 x instantaneous and 10 x integrated luminosity ] PILEUP: from ~30  >200 proton.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Trigger & Tracking detector for CMS
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Status of BESIII and upgrade of BESIII
Atlas: Upgrade Phase I Massimo Della Pietra.
ATLAS-MUON Trigger hardware developments
CMS muon detectors and muon system performance
for the transition region on behalf of the RPC upgrade group
Commissioning of the MUON Spectrometers in ATLAS and CMS
ATLAS Muon Spectrometer and
RPC and LST at High Luminosity
Project Presentations August 5th, 2004
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Pre-installation Tests of the LHCb Muon Chambers
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Presentation transcript:

HEP 2007 – 20 Jul 2007 · Manchester, England Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer F.Petrucci INFN Sezione di Roma Tre and Dipartimento di Fisica, Università Roma Tre On behalf of the ATLAS Muon Collaboration

2 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 2 Summary   The ATLAS Muon Spectrometer   Status of the installation   Commissioning   First results from commissioning in the pit   Conclusions

3 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 3 MDT chambers in the ATLAS Muon Spectrometer The research program of the ATLAS experiment at the Large Hadron Collider requires the detection of photons, electrons, hadron jets, missing energy and muons with good momentum resolution over a large acceptance.  3 large toroidal magnets (two end-cap and one barrel). Bending power ∫Bdl~3 T∙m in the barrel region and ~6 T ∙m in the endcap.  3 tracking stations (Inner, Middle and Outer) in 8 Large sectors and 8 Small sectors  Muon tracking detectors:  good space resolution (~80 μm per point)  robust and reliable operation for many years.  Dedicated trigger detectors that also measures the second coordinate. Muon momenta are measured with large toroidal magnets and tracking is done in air.

4 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 4 Trigger chambers: RPC Planes of 2 overlapping units. 2 gas gap and 2 planes of readout strips (  ) per unit. Saturated avalanche regime. Thin Gap Chambers (TGC) Multiwire proportional chambers in saturated mode. High Rate Capability. (  ) readout: wires and cathode strips Detectors Precision chambers: MDT (Monitored Drift Tubes) Two multilayers of staggered 3 cm diameter drift tubes. Gas mixture, 93%Ar−7%CO2, absolute pressure of 3 bar. Single point resolution ~80  m, drift time 700 ns. Low gas gain of 2×104 to avoid ageing effects. CSC (Cathode Strip Chambers) proportional wire chambers with cathodic strips. Single point resolution ~60  m; drift time ~30 ns

5 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 5 Installation Barrel spectrometer TGC wheel Endcap toroid

6 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 6 Installation (2) Barrel   Installation:   695/704 stations installed.   Missing few chambers in feet and lower sectors to permit Big-Wheels opening and access to the inner part of the detector.   Positioning:   Very well advanced (~95%). Mainly limited by interference with ID-Calo services. Endcap   6 out of the 8 Big Wheels installed: 4 BW sector C + 2 BW sector A (TGC1 and MDT1).   The 2 Small Wheels ready in Oct/Nov, the EO Wheels still missing (but all chambers are ready) Magnets   Barrel toroid: installed and tested   Endcap toroid: both EC toroids installed in June and July

7 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 7 Commissioning A level-by-level strategy was adopted :   Level I: Test of each station done on surface before installation   MDT tested for:   HV test, gas leak tightness, DCS functionality   Read-out via Test Pulse Runs   RPC tested for :   Leak tightness, Noise level   LVL-1 read-out via Test Pulse Runs   Level II: check basic functionalities with provisional services of the stations after installation in the cavern. Done for most of the stations.   DCS, FE electronics, noise runs   HV and gas leak tightness   Level III: check full functionality and sign-off of complete sectors (to be done with final services, power supplies and RO eltx) After level III full sectors are ready to be integrated in ATLAS

8 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 8 Commissioning (2) Status and plans:   Started from top sectors.   Finalize sectors 5 and 6 (partially commissioned)   Move to sectors 3–4 in August/September. Then sectors 1-2, 7-8, … Output of the level III sector commissioning:  Check general functionalities of single detectors.  Commissioning of power and DCS systems sector by sector.  Commissioning of sector alignment system.  List of dead and noisy channels.  Check of gas distribution.  Full test up to cosmic ray run  Fix of left over problems  Check/filling of the configuration DB for later use.

9 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 9 9 Sector 13 Sector 5 Sector June ’07 data taking period:  85 chambers:  71 Barrel MDT (sect. 5+6, side A+C) + 14 Endcap MDT (BW sect. 10, 11, 12). Apprx mdt tubes read-out.  No magnetic field  RPC trigger  Sector 5 side A  Fully operational alignment system  Services  MDT Gas: Barrel: recirculation mode (800lt/h) EC: open gas flow  LV-HV : power supplies and control system in final configuration November ’06 runs  Barrel Toroid at full field (20.5 kA nominal current reached at first cool down)  13 MDT stations (2% of the barrel) in sectors 12,13,4, side A  RPC trigger  Muon Barrel Alignment (15% of barrel system) First results from Barrel commissioning in the pit

10 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 10 First results from Barrel commissioning in the pit PX 14 D=18 m SX 1 Y Z PX 16 D=12.6 m 60 m 35 m 15.9 m 53 m Cosmic rays mainly form the shafts.  RPC trigger in Sector 13 side A. Measured rate: 5 Hz/m 2  Cosmics tracks from both shafts.  RPC trigger in Sector 5 side A. Mesured rate: Hz.  Cosmic tracks from PX14.

11 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 11 Runs with magnetic field (November ’06 runs)

12 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 12 Runs with magnetic field (November ’06 runs)  Clear separation of  + and  -  Angular distribution consistent with geometry (two peaks correspond to near and far access shafts)  Momentum spectra consistent with expectations  Ratio  + /  - ~ 1.5 Find more details on the simulation of cosmics in the presentation by Thijs CORNELISSEN.

13 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 13 Commissioning sectors 5 & 6 (June ’07) MDT hit map (example of one layer of a middle station in run 11533). Check dead/noisy tubes, trigger coverage,…   No trigger in eta region 5 in this run. The angle of incidence of the track segments and its dependence on Z coordinate (along the beam line) are consistent with cosmic tracks coming from the main shaft. Tube number ~10 m (half a sector length)

14 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 14 Commissioning sectors 5 & 6 (June ’07) Drift time parameters (MDT chambers test)   All t 0 ’s within a chamber are very close, as expected. t0t0 t max  Spectrum length (t max -t 0 ) is an estimator of drift properties. Spectrum length distribution for all the chambers is good.  One chamber with a much shorter spectrum (closed gas valve). mezzanine number Time (ns)

15 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 15 MDT space-time relation Space-time relations are computed in each MDT chamber with an auto- calibration procedure.   All r(t)’s for the chambers in sector 5A in a run in June `07 are within 30  m. Black = Magnet OFF Red = Magnet ON BIL3A13 Multilayer 1 Rt(Magnet Off) - rt(Magnet ON)  A measurement of the effect of magnetic field on r(t) relations has been performed during november runs with the magnet on. It is taken into account in the calibration procedure.  r(t) (mm) Time (ns)  r(t) (mm)

16 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 16 RPC efficiency and correlation with MDT Measurement of RPC efficiency with two independent methods:  Use only RPC information (RPC self-tracking).  Extrapolate MDT tracks in the RPC (MDT Tracking). Systematics are under investigation, the two methods are consistent and a good correlation between the detectors is shown. BML Confirm: inner RPC planes. BOL Confirm: outer RPC planes. Each point refers to two contiguous gas gap in η. Only η view can be used in coincidence with MDT. Thanks to the University and INFN groups of Roma Tor Vergata and Lecce

17 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 17 Conclusions   The installation of the barrel ATLAS muon spectrometer is finished. The endcap is well advanced.   The magnet system has been installed and the barrel toroid already tested at nominal current.   Sector commissioning of the spectrometer started.   Overall good behaviour of the chambers tested so far.   Trigger system, DCS, Alignment and DAQ systems well advanced.   Combined runs taken with the calorimeters.   We are working to have the full system commissioned and ready to be integrated in ATLAS... … many thanks to all the people involved in installation, DAQ, DCS, alignment, offline and online software for their efforts (the list is too long!)

18 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 18 BACKUP SLIDES

19 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 19  two multilayers of 3 (in Middle and Outer rings) or 4 (in the Inner ring) layers of staggered drift tubes each.  thin wall (400 μm thick) 3 cm diameter aluminum tubes.  Gold-plated W-Re anode wire, 50 μm diameter is tensioned at 350 g crimped in copper pins.  low longitudinal diffusion gas mixture, 93%Ar−7%CO 2, absolute pressure of 3 bar.  low gas gain of 2×10 4 (3080 V andode voltage) to avoid ageing effects. MDT chambers

20 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 20 RPC  Planes of 2 overlapping units. 2 gas gap and 2 planes of readout strips (  ) per unit.  Electrodes: graphite layer +2 mm Bakelite plates.  Gap gas: d = 2 mm, surface =1.72×0.75m 2 ÷ 2.96x1.2m 2.  Saturated avalanche regime C 2 H 2 F 4 (94.7%)C 4 H 10 (5%)SF 6 (0.3%), atmosferic pressure, HV~10 KV  Rate Capability ~ Qintegrated=0 > Qintegrated=210mC/cm2 = 7y LHC x 5 (Safety Factor) Trigger chambers Thin Gap Chambers (TGC)  Multiwire proportional chambers  2-D information: wires and cathode strips  Wire spacing: 1.8 mm, anode-cathode gap: 1.4 mm  50  m W anode wires  C0 2 /n-Pentane 55/45 in saturated mode  High Rate Capability

21 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 21 ATLAS RPC CHAMBERS Muon Barrel Spectrometer: LV1 RPC trigger   Pivot Hit Coincidence Window (Low Pt plane) Coincidence Window (High Pt Plane)  Identify  `s candidate tracks  On-detector trigger/readout electronics: Coincidence Matrix ASIC’s (CM)  Assign bunch crossing number (25 ns)  Select Region of Interest:  x  x   Programmable Pt thresholds   and  view trigger   second coordinate (pitch ~3 cm)

22 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 22 Alignment System - Barrel   5817 sensors in total   MDT inplane system monitor chamber deformations O(1)  precision   Proximity and Axial system align chambers within layer 10  precision   Projective system align chambers within sector 30  precision   Chamber-Chamber-Connect. System align small sectors to large 200  precision   Reference system absolute alignment 500  precision

23 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 23 Alignment system - EndCap   6416 sensors in total   Reference grid of monitored alignment bars - Internal optical straightness sensors - Temperature sensors   Polar sensors align bar to other wheel   Azimuthal sensors align bars within wheel   Planarity sensors align chamber to chamber   Proximity sensors align chamber to bar and align chamber to chamber   Inplane sensors: MDT chamber deformations

24 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 24 Cosmic rate high enough for polar angles up to 75 o : ~1Hz/strad for muons going through the ID (almost projective) and p m >10GeV => Study of all barrel sectors except sectors 1-9 Acceptance could be extended to sector 1-9 and part of the EI/EM end cap chambers by using non pointing tracks:

25 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 25 Black = Magnet OFF Red = Magnet ON Black = Magnet OFF Red = Magnet ON r-t(Magnet Off) - r-t(Magnet ON) RT Relations – B-field effect

26 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 26 RT Relations – B-field effect

27 HEP 2007 – 20 Jul 2007 · Manchester, England Fabrizio Petrucci Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer 27 Particle background in ATLAS Total flux ~ 5 kHz/cm 2 (safety factor 5 applied to account for errors in simulations) MDT sensitivity   to neutrons ~ 5 ∙10 -4   to photons ~ 8·10 -3 Chambers have to operate in the harsh LHC background for about 10 years. Moreover, possibility for an upgrade for S-LHC (10 times higher luminosity). 10 years of ATLAS operation at LHC: 1) Integrated charge : 0.6 C/cm 2) Neutron integrated flux : 3.45 ∙10 11 n/cm 2 (Inner Barrel region) SLHC project : 10 times higher fluxes than LHC for 10 years. Fluxes (kHz/cm 2 ) NeutronsPhotons L=10 34 cm -2 s -1 Low energy secondary particles (charged particles, neutrons and photons in the MeV range) from hadron interactions with detector and machine elements. Uncorrelated to primary p-p collisions.