Specifications Update 2012 CAPA/NCDOT Asphalt Training Workshop David Glover – Barnhill Contracting Ted Naylor – NCDOT Todd Whittington – NCDOT 1.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

Rapid Implementation of Warm Mix Asphalt in Minnesota Tim Clyne MnDOT 16th Annual TERRA Pavement Conference February 9, 2012.
Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
CALTRANS EXPERIENCE WITH WARRANTIES. WHY WARRANTY The Right Strategy at the Right Time Shift Responsibility of Quality Control to Contractor State Responsibility.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
2014 AAPA Conference March 11-12, 2014 Curtis Vincent, P.E. Construction Engineer Lyndi Davis Blackburn, P.E. Assistant Materials and Tests Engineer Specification.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan.
Tear-off Asphalt Shingles Recycling Roofing Contractors Association of Washington Bi-Annual Meeting November 3, 2011.
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Pavement Performance Specifications Research.
mydocs-presentations-2011PAPAMWF-EricaRevisions
WMA TWG December NCAT WMA Research 2007 Andrea Kvasnak.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Recycled Asphalt Shingles in Texas Dale Rand, P.E.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
1 Green Roadway Design from a Pavements Perspective Rene’ Renteria, P.E. ODOT Pavement Design Engineer April 13, 2010.
SPECIFICATIONS UPDATE KELLY MANNERING DelDOT QUALITY CONTROL (302)
2013 Year In Review APAI Winter Conference January 9, 2014 Matt Beeson, P.E. Asphalt Engineer.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Materials Specifications & Virginia Test Methods (VTM’s) 2014 Regional Asphalt Seminars Rob Crandol, P.E. Statewide Asphalt Program Manager.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Asphalt QC 2000 The Adventure Begins….. Topics Terminology Specifications Sampling and Testing Reporting/CQR Who Does What? Lube & Oil Change All in 20.
Porous Asphalt The Specs Tim Horton, Skillings Connolly Jessica Knickerbocker, City of Tacoma Mark A. Palmer, P.E., LEED AP, City Engineer, City of Puyallup.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Developing a Mixture-Based Specification for Flexible Base.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Pavement Performance Specifications Research.
Allen Hughes State Materials Office
Working Successfully With Property Managers: An Interactive Engagement
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
Materials Specifications & Special Provision Changes 2015 Regional Asphalt Seminars Rob Crandol, P.E. Assistant State Materials Engineer.
Guidelines for Use of Highway Specifications for Airport Pavements
Post-Consumer Reclaimed Asphalt Shingles in Asphalt Pavement JAMES M. ROSS Project Manager FRED SMITH COMPANY.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Ed Mussler, P.E., Permitting Branch Supervisor Solid Waste Section Division of Waste Management NC Department of Environment and Natural Resources Presentation.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
Nilesh Surti, PE NCDOT State Pavement Construction Engineer.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
AMERICA RIDES ON US HMA ECONOMICS 101 Minimizing Project Costs without Sacrificing Quality Purdue Road School March 09, 2011 M. Dudley Bonte PE Regional.
Post-Consumer Reclaimed Asphalt Shingles in Asphalt Pavement February 2012 James M. Ross Asphalt Quality Control Manager Greenville Paving & Contracting,
CAPA 66 th Annual Meeting – April 22, Fiscal Update Staffing Funding Lettings 2.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Alabama Asphalt Pavement Association
Indiana Experience with Water Injected Foaming Device Rick Flint
Chapter 8 Specifications & Special Provisions
Chapter 8 Specifications & Special Provisions
QC Document Update Todd Shields, INDOT.
Acceptance Process for Manufactured Products by Certification:
Panel discussion Date.
New Specifications for 2017
Quality Control Personnel Training
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Presentation transcript:

Specifications Update 2012 CAPA/NCDOT Asphalt Training Workshop David Glover – Barnhill Contracting Ted Naylor – NCDOT Todd Whittington – NCDOT 1

What Are We Going To Cover? 2012 Major Specifications Changes Changes in the 2012 QMS Manual Review Other Recent Changes 2

Special Provisions Added (since 2006)

Major Changes for 2012 Specifications

Modifications / Clarifications Article 607-3: Use of steel plates over utilities and constructing a temporary ramp Article 607-5: Modified and clarified when to pay for incidental milling Article 609-6: Corrective actions triggered by Moving Avg. values instead of Warning Limits Article 657-3: Joint sealer application per manufacturer for temperatures Article : Added price adjustment for slurry seals

Major Items/New Additions Division 6: –Removed 35+ pages – duplication –QMS Manual serves as a “Supplemental Specification” Sections 609 & 610: –Removed “Old” 4.75 mm mix –Added Warm Mix Asphalt (WMA) to Spec. Book –Added Post-consumer Shingles (PRAS) – “Tear-offs” Materials Specifics – Article (E) 7

Major Items/New Additions Article 610-8: –Expanded use of Material Transfer Vehicle (MTV) Article : –Modified Final Surface Testing Requirements to include Inertial Profiler (IRI) option Article : –Changed Pay Factor Formula for Density Deficiencies 8

9 What is a Supplemental Specification? From the 2012 Spec. Book: –“Specifications, regulations, standards, manuals or codes referenced in the contract or general revisions or additions to this book of standard specifications that are issued under the title of Supplemental Specifications. Supplemental Specifications shall be considered part of the Standard Specifications.” The 2012 HMA/QMS Manual is now considered as part of the Specifications.

4.75 mm Mix Removed from 2012 Spec. Book –Still have PSP for SA-1 (“Sand Asphalt”) New SP coming for 4.75 mix (true Superpave) –Placed in a ¾” lift (~85 lb/sy) –Paid by the TON –A preservation treatment “4.75mm mixes should only be used as overlays on structurally sound pavements.” –Looking for Trial Sections for New Version –SR’s or Lower Traffic NC Routes 10

4.75 mm Mix

Warm-Mix Asphalt Continue to Use Throughout the State –860,000+ tons placed in NC (as of 12/31/2011) Now have 3 Technologies with “Limited Approval” status (can be placed on US routes) Increased Use in 2012? –NuStar Anti-strip Changeover –Still looking to do WMA Interstate Pilot 12

Warm-Mix Asphalt 13

Shingles In Asphalt Shingles in asphalt mix for 15+ years –Manufacturer-Waste Shingles (MRAS) Post-Consumer shingles (PRAS) allowed on case-by-case basis on projects in Collaboration with NC State Agencies and CAPA to develop latest NCDOT RAS Spec. 14

Shingles In Asphalt Amended Air Permit Asbestos Operations Plan Asbestos Testing Data Source Documentation –Receipts –Deliveries –Internal Auditing processes Sampling Personnel = NC-Accreditations Asbestos Inspector Roofing Supervisor 15

Expanded Use of MTV 2006: “Use a Material Transfer Vehicle (MTV) when placing all asphalt concrete… that require the use of asphalt binder grade PG ” 2012 adds: “Use a MTV for all surface mix regardless of binder grade placed on Interstate and US routes that have 4 or more lanes and are median divided.”

WHY an MTV? 17

WHY an MTV? 18

WHY an MTV? 19

Final Surface Testing Options Inertial Profiler vs. Hearne Straightedge option If a Contract meets the requirements, it will have Final Surface Testing included. Option 1 Option 2

Final Surface Testing Criteria when FST is NOT required on a project: –The project has less than 2 new lifts of asphalt. –The speed limit is less than 45 mph. –The project is less than one mile in length. –The existing site conditions make it impractical to obtain rideability as determined by the Division Considerations may include: –pavement width; –traffic phasing constraints; –type of facility; –large number of utility adjustments, driveways, or y-lines. 21

Final Surface Testing If the Division decides not to use FST – must request to exclude it from the contract. (Contract line-up sheets) 22

Density Pay Factor Formula

Density Pay Factor Formula Gives a Continuous Equation –Each Percent Reduction is equal Density (%)Old Pay FactorNew Pay Factor % %92.5% %85.0% %77.5% %70.0%

QMS Manual Changes QMS Certification Expirations –QMS Roadway –Level I – Plant –Level II – Plant –Mix Design Technician Now Expire on December 31 st of the 4 th Year –Page

QMS Manual Changes 26

QMS Manual Changes 27

QMS Manual Changes JMF Numbering System –Page

CODEMix Type Description HMACHot-Mix Asphalt Concrete [Default] WMDBWarm Mix Astec Double Barrel Green WMUFWarm Mix Gencor Ultrafoam WMABWarm Mix Maxam AquaBlack WM3GWarm Mix Evotherm 3G WMAFWarm Mix Meeker AquaFoam WMSBWarm Mix Sasol Sasobit WMADWarm Mix PQ Corp. Advera WMTXWarm Mix Terex WMA MRASManufacturer RAS PRASPost-Consumer RAS RPASRAP-RAS Mixture RP15RAP Mix 15% RP20RAP Mix 20% RP21RAP Mix 21% RP25RAP Mix 25% RP30RAP Mix 30% RP40RAP Mix 40% FC1FOGFC Type FC-1 w/Fibers FC1SOGFC Type FC-1 w/Shingles FC2FOGFC Type FC-2 w/Fibers FC2SOGFC Type FC-2 w/Shingles UBWCUltra-thin Bonded Wearing Course DC78Permeable Asphalt Drainage Course, Type P-78M DC57Permeable Asphalt Drainage Course, Type P-57 MCSBMicro-surfacing, Type B MCSCMicro-surfacing, Type C

QMS Manual Changes Section 7.17 Resampling/Retesting (Sublots) –“Contractor may request…” –Only for mix in Remove and Replace Outside of the Retest Limits Otherwise, Pay Factor is applied to mix that remains in place. –Referee = “Dispute Resolution” Tested at Central Lab or another Division QA Lab –New Form QA-2A for tracking of Sublots 30

New QA-2A Form 31

A Reminder About Sublots 32

A Reminder About Sublots Do we want #1 or #2? 33 #1#2

QMS Manual Changes Section 7.18 – QA Sampling and Testing –Increased Verification testing from 10% to 20% QA Split testing remains at 5% –Additional set of Limits of Precision For comparing QC and Verification Samples –New Dispute Resolution Process Tested at Central Lab or another Division QA Lab DR sample results can replace QC results for material acceptance and payment. 34

“Roadway Paving – Best Practices Checklist” Draft form - Trial basis #1 Objective = Facilitate communication Roadway Inspector fill out and attach to Asphalt Daily Report Provide a copy to Paving foreman on 1st day and weekly thereafter Provide feedback

“Roadway Paving – Best Practices Checklist” 36

Table RAP Contents 37

Asphalt Binder Pay Items From Memo dated: May 9, 2011 Effective with August 2011 Letting Simplified from 4 Pay Items to 2 Pay Items –No Specific PG Binder Grades Used –Removed references to PG 58, 64, 70, 76, etc. Two New Pay Items: –“Asphalt Binder for Plant Mix” –“Polymer-Modified Asphalt Binder for Plant Mix” 38

Questions ? 39