HORTICULTURE II - LANDSCAPE Unit B Landscape Design.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Construction Engineering 221 Cost Estimating and Bidding II.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
4/13/2017 1:54 PM.
Chapter 10 Pricing Off Premise Events 1. Pricing The “Science” of Pricing – determining the actual costs of goods and labor The “Art” of Pricing – how.
Setting the Right Price. “Underpricing is one of the most common mistakes home-based businesses make.” SLIDE 1 Setting the Right Price.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Chapter 1 Cost and Sales Concepts
EM15 – Contractors COST MANAGEMENT
Managerial Accounting
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Setting the Right Price. Lesson Goals: Learn how to: –Calculate total costs –Calculate a profit margin –Use break-even analysis Identify the difference.
Ms. Gripshover Landscaping Unit 12. Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate.
Pricing Landscape Maintenance Work. Next Generation Science/Common Core Standards Addressed!  CCSS.Math. Content.7.R P.A.3 Use proportional relationships.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
CTC 475 Review Breakeven Problems Determine equations for TR, TC, NP Maximize/minimize nonlinear equations by taking derivative, setting = 0, and solving.
Three manufacturing costs Direct material cost: Consist of all those material that can be identified with a specific product. Example: wood used in manufacturing.
Full Costs and Their Uses
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
LESSON 12-2 Financial Records and Financial Statements
Classification of PP&E
June 20, 2012 Outsourcing Physical Plant Should I ???
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
 Purpose: To present DOT an overview of the costs that we incur as grading contractors.  Goal: To foster a basic understanding of these costs and relate.
Landscape Business Concepts
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
INTD 55 business practices charging for your services.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Controlling Manufacturing Costs: Standard Costs
TYPES OF CONTRACTS.
Horticulture CD Unit C 4-4: Nursery, Landscaping, and Gardening.
Lesson 5 Marketing the Landscape Business. Next Generation Science/Common Core Standards Addressed! CCSS. Math. Content.7.RP.A.3 Use proportional relationships.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
Project Cash Flow.  In order to make a workable project plan, the resources needed for the project and their availability must be checked.  Money is.
Chapter 13 Estimates for Remodeling Work
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Allowances, Unit Prices, and Alternates ACT
Measurement and Payment
TOPIC-7- PROJECT CASH FLOW
MARKETING THE LANDSCAPE BUSINESS MS. GRIPSHOVER LANDSCAPING UNIT 4.
1 McGraw-Hill Ryerson College Accounting First Canadian Edition Price Haddock Brock Hahn Reed.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
© 2012 Cengage Learning. All Rights Reserved. Principles of Business, 8e C H A P T E R 12 SLIDE Financial Records and Financial Statements 12.
 Total startup cash needed  Financial performance of similar business  Overall financial attractiveness of the proposed venture.
FINANCIAL RESOURCES MANAGEMENT
Lesson 8 Pricing the Landscape Plan Reminder: student learning activities are at the end of this power point.
BUDGETING FOR BUILT-IN PROFITABLILTY Lee J. Rosenberg, P.E. Quality Service Contractors Power Meeting XXX Daytona Beach Florida March 21, 2009 Lee J. Rosenberg,
Marketing the Landscape Business
Chapter 17 Job Order Costing
Job Order and Process Costing
Costs and Economics of Construction
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
PS&E – Plans, specifications and estimate
TOPIC-7- PROJECT CASH FLOW
Cornerstones of Managerial Accounting, 6e
Classification of Cost
TOPIC-7- PROJECT CASH FLOW
Estimating – Overhead, Profit, Margins, & Markups workshop
ARCH 435 PROJECT MANAGEMENT
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
Presentation transcript:

HORTICULTURE II - LANDSCAPE Unit B Landscape Design

OBJECTIVE 4.03 Remember key terms, abilities needed, and items included in estimates and quotes for landscape and/or irrigation plans

KEY TERMS FOR ESTIMATES AND QUOTES Estimates – an approximate price to complete a specific project Bid (or bidding) – a fixed price on the landscape job to be completed Quote – to give exact information on a specific project Specs (specifications) – written description of landscape materials needed, number of hours that the job will take and a timeline for the project completion Overhead – the general cost of operating a business and is the most likely cost to be left out of estimates by a new landscaper  Assignable – includes non-labor and non-material costs. Ex: special permits, equipment rental, special insurance, temporary utility costs  Unassignable – includes the costs of operating a business that can not be credited directly to a specific project. Ex: cost of equipment, vehicles, gas, tools, insurance, payroll expenses, officer expenses, benefits, and sick-leave

KEY TERMS FOR ESTIMATES AND QUOTES Materials – items used in a project Labor – calculating the time required to install a project. (this is one of the most difficult tasks of the landscape contractor.) Contingencies – used if a contractor cannot predict weather issues, material delays, labor shortages, equipment which needs repair, etc. (A portion of the project costs should be reserved as a contingency fund which is usually 5% - 10% of the total material and labor costs.) Profit – net income after expenses

KEY TERMS FOR ESTIMATES AND QUOTES Lump sum – a bid format in which all project costs are provided to the client in a single number Itemized – a list of all items and their costs Time and Materials (cost plus) – a type of bid that provides a set price for materials and unassignable overhead, plus an hourly cost for labor Unit costs – cost per item

ABILITIES NEEDED TO ESTIMATE OR QUOTE JOBS Read and interpret specifications (specs) and drawings for projects Research costs used to estimate or quote Know ability of your employees to perform project tasks Know condition and special requirements for working in a particular region (piedmont, mountains, coast) Know client’s wants and needs Use interpersonal skills – your ability to interact with your client and with others

ITEMS INCLUDE IN AN ESTIMATE Cover letter concerning the estimate Quantities of each type of material needed based on landscape or irrigation plan Approximate cost of materials and labor for the landscape design or the irrigation plan if not provided by client Approximate cost of clearing the site including labor if site clearing is needed Approximate cost of plant materials including labor to install Approximate cost of construction materials plus labor to install Approximate cost of turfgrass installation materials plus labor to install

ITEMS INCLUDE IN AN ESTIMATE Approximate operating cost of equipment including fuel and labor Approximate cost of sales taxes on materials Approximate overhead costs (the % assigned to this project) This cost is usually added into the labor costs on estimates. Many inexperienced business owners forget to include overhead and profit when preparing estimates causing business failures. Approximate total cost for the landscaping or irrigation project Name of the person completing the estimate and the date of the estimate

ITEMS INCLUDED IN A QUOTE Cover letter concerning the quote Quantities of each type material needed based on landscape or irrigation plan The actual cost of materials and labor for the landscape design or the irrigation plan if not provided by client Actual cost of clearing the site including labor if site clearing is needed Actual cost of plant materials including labor to install Actual cost of construction materials plus labor to install Actual cost of turfgrass installation materials plus labor to install

ITEMS INCLUDE IN AN QUOTE Actual operating cost of equipment including fuel and labor Actual cost of sales taxes on materials Actual overhead costs ( the % assigned to this project) This cost is usually added into the labor costs on quotes. Many inexperienced business owners forget to include overhead and profit when preparing quotes causing business failures Actual total cost for the landscaping or irrigation project Name of the person completing the quote and the date of the quote Allowance for contigencies

DIFFERENCE BETWEEN ESTIMATE AND QUOTE The major difference between an estimate and a quote is that an estimate uses approximate costs and a quote uses actual costs. Since a quote uses actual costs, allowances are made for contingencies.