Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.

Slides:



Advertisements
Similar presentations
Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
PERFORMANCE OF THE DELPHI REFRACTOMETER IN MONITORING THE RICH RADIATORS A. Filippas 1, E. Fokitis 1, S. Maltezos 1, K. Patrinos 1, and M. Davenport 2.
RESEARCH ON BEAM SIZE MONITORS S. Csorna, Vanderbilt U. LCCOM2, June 30, ’02, Santa Cruz Proposal for Non-Intercepting Beam Size Diagnosis Using Diffraction.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
IPBSM status and plan ATF project meeting M.Oroku.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
Taikan SUEHARA, 3 rd ATF2 project KEK, 2006/12/18 Status of Shintake-monitor Optics (focused on phase stabilization) Taikan SUEHARA The University.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
BROOKHAVEN SCIENCE ASSOCIATES BIW ’ 06 Lepton Beam Emittance Instrumentation Igor Pinayev National Synchrotron Light Source BNL, Upton, NY.
Mike Newchurch 1, Shi Kuang 1, John Burris 2, Steve Johnson 3, Stephanie Long 1 1 University of Alabama in Huntsville, 2 NASA/Goddard Space Flight Center,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
Lenses Chapter 30. Converging and Diverging Lenses  Lens – a piece of glass which bends parallel rays so that they cross and form an image  Converging.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Taikan Suehara, 2008/03/05 Shintake monitor in ATF2: status, performance and prospects Taikan Suehara (The Univ. of Tokyo) M.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Effects of long term annealing in p-type strip detectors irradiated with neutrons to Φ eq =1·10 16 cm -2, investigated by Edge-TCT V. Cindro 1, G. Kramberger.
IPBSM response to non-Gaussian beam K. KUBO.
Recent Results in Analysis of Errors in Fringe Scans by Shintake Monitor (IPBSM) ATF2 Topical Meeting July 8, 2013 KEK ATF2 Topical Meeting Jacqueline.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
European Linear Collider Workshop ECFA LC2013 BDS+MDI IPBSM Beam Size Measurement & Performance Evaluation May 29, 2013 DESY ECFA LC 2013 Jacqueline Yan,
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Performance Evaluation of Shintake Monitor (IPBSM) Americas Workshop on Linear Colliders 2014 May 12-16, 2014 Fermilab, IL, USA 12013/07/20 Jacqueline.
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
The VIRGO detection system
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Scan of piezo drive trigger delay For this timing scan, we picked an amplitude of 7.5V (a little more than required to give minimum rms vibration as identified.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Date of download: 7/1/2016 Copyright © 2016 SPIE. All rights reserved. (a) Simplified sketch of the setup. Some beam guiding mirrors, optical isolators,
ATF2 Status N.Terunuma, KEK
Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning Technology and Instrumentation in Particle Physics 2011 Chicago, June 11 Jacqueline.
Emittance measurements for LI2FE electron beams
Characterizing Optics with White-Light Interferometry
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
Interference.
Thermal lensing effect: Experimental measurements - Simulation with DarkF & Finesse J. Marque (Measurements analysis: M. Punturo; DarkF simulation: M.
Two-beam interference:
Volume 104, Issue 1, Pages (January 2013)
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Presentation transcript:

Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo

Beam Size Measurement Performance Expectation Although we have been developed Shintake Monitor in the laboratory, we need the measurement in the actual setup to estimate the various errors from the laser and optics I have done the performance expectation measurement regarding the optics in this summer. Main measurements are the following. 1.Laser interference fringe visibility at the IP 2.Laser position stability at the IP 3.Laser phase stability at the IP They can be the main error sources of beam size measurement, so we need to evaluate the amount of errors of them.

Contents Introduction of the measurement Result of the measurements 1. Laser interference fringe visibility at the IP 2.Laser position stability at the IP 3.Laser phase stability at the IP Conclusion Schedule from now to Beam Operation

Interference Fringe Measurement R=50% splitter R=100% mirror R=100% prism f=250mm convex lens φ1μm pinhole photodiode automatic stage Scan laser fringe by a photodiode  1  m pinhole is attached in front of the photodiode Laser power is also monitored by another photodiode so the laser profile measurement is not affected by the laser power jitter. delay line for phase stabilization Image Inverting Dove prism

Actual Optics

Measurement Results – upper path only – lower path only – both path (interference)

Position Stability We use the pulsed Nd:YAG laser and it has large angular jitter. This causes the position jitter at the IP. I measured the position jitter at the IP by using the PSD (Position Sensitive Detector). We also intend to monitor the laser position at other places and estimate the IP position from these monitored results.

Position Stability Measurement Setup PSD1 To the Vertical Table From the Laser Table PSD2 IP Laser Optical Table (Top View) Vertical Optical Table (Front View) PSD3 Pulsed Laser

Actual Optics Laser TableVertical Table

Measurement Results psd3x (vertical direction) : 3.2  m (RMS) psd3y(electron beam axis) : 1.9  m (RMS) Position Stability at the IP (in 10,000 pulses = 1,000 sec measurement)

Remarks on the Position Jitter The position jitter only affects the laser power at the IP Designed laser beam size at the IP is 20  m (  = 10  m), so 3.2  m and 1.9  m position jitters correspond to only 5 % and 2 % power reduction respectively. We also check the correlation of the position jitters between at the IP and other places

Position Correlation between IP and PSD1between IP and PSD2

Phase Stability Position of peaks and valleys of interference fringe is the laser phase, so the phase stability directly affects the electron beam size measurement We need to know the phase stability at the IP but it is impossible to monitor this at the IP. We designed the phase monitor to estimate the phase jitter at the IP

Principle of Phase Monitor 50% Beam Splitter Piezo Stage Microscope Lens Linear Image Sensor Measure fringe profile Fourier Transform Calculate the phase of fringe at the peak frequency feedback to Piezo Stage to stabilize the phase Magnify the interference fringe

Actual Optics ( in 174 degree crossing angle mode ) Piezo Stage 50% Beam Splitter Microsope Lens Linear Image Sensor IP

174 degree mode the smallest beam size measurement mode fringe pitch at the IP is 266 nm We set two phase monitor in this mode Feedback to the Pieszo stage is determined by the first monitor By using the second monitor we can check the result of the stabilization

Measurement Results ( Not Stabilized ) ― ch1 ― ch2 Long time measurement (6000 sec=100 min) There are large drift and small jitter It seems to be some correlation between ch1 and ch2 but it is small Short time measurement (60 sec: assumed beam size measurement time) Large drift which can be seen in the long time is ignored in short span. There are also small jitter pulse by pulse and second order vibration. pulse repetition frequency is 10 Hz

Phase Stability (Not Stabilized) ch1: 1 min Phase RMS = ± 49.7 mrad ch2: 1 min Phase RMS = ± 54.5 mrad Results of phase stability in 1 minute measurement 400 mrad phase correspond to 16.9 nm in 174 degree crossing mode (266 nm fringe pitch) This amount of phase jitter can be problem in the smallest beam size measurement (37 nm).

Measurement Result ( Stabilized ) ― ch1 ― ch2 Long time plot (6000 sec=100 min ) ch1 is stabilized ch1 drift was canceled but ch2 was not This result indicates that ch1 and ch2 has only weak correlation Short time plot (60 sec) Long time drift can be ignored. Small jitter pulse by pulse is remained in both channels but second order vibration is canceled in ch1. However, this vibration is remained in ch2

Phase Stability (Stabilized) ch1 1 min Phase RMS : ± 9.2 mrad ch2 1 min Phase RMS : ± 50.4 mrad Phase jitter of stabilized channel is well reduced Not stabilized channel gets better a little. This is the phase stability we have achieved for now. 325 mrad correspond to 13.8 nm (266 nm fringe pitch)

Conclusion Laser interference fringe visibility can be treated as 100 % Position jitter at the IP was small for now, and we intend to estimate it by using not IP position data Phase jitter is estimated to be a litter bit large to measure the small beam size. We may need some improvement on the detectors or devices.

Schedule