Agenda item 1.9.1 - Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)

Slides:



Advertisements
Similar presentations
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
Advertisements

1 HAP Spectrum Sharing Studies in the 28/31 GHz Band Y.H. Kang.
BR WORKSHOP ON THE EFFICIENT USE OF THE SPECTRUM/ORBIT RESOURCE ESOA Limassol, Cyprus, April
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.13 – BSS and feeder links 21.4–22 GHz Presenter: Geoff McMillen.
John Taylor Nairobi, Kenya Sept 3-4, 2013 WRC-15 Agenda Item
WRC-07 AGENDA ITEMS OF INTEREST TO PASSIVE SERVICES WITH PARTICULAR EMPHASIS ON 1.2 AND 1.17 REGULATORY ISSUES REQUIRED ACTIVITIES CURRENT STATUS IN ITU-R.
WRC 2007 Results October 22 ~ November 16, 2007 Geneva, Switzerland Masatoshi OHISHI RAFCAP meeting 2008.
WRC-12 Preparation CPG Chairman /
AGENDA ITEM 1.1 To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
WRC-15 Preparations Update
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.17 Presenter: Neil Meaney.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.4 – New AM(R)S in the bands 112– , 960–1 164 and 5 000– MHz Presenter: Eddy D’Amico.
Providing Useful Regulatory Solutions T T & C Telecommunication Regulatory Consultants Shayla E. Taylor TT&C USITUA WRC Seminar September 19, 2007.
ICTS REGION II REPORT By Mr. Jean-Claude Ghnassia France For the Region II (the Americas) Coordinator: Mr. Mikel R. Ryan Patuxent River Maryland, United.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.3 – Unmanned aircraft systems Presenter: Bill McDonald.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
1 World Radiocommunication Conference ‘07 Preview Edward M. Davison Deputy Associate Administrator, International DoC/NTIA/OSM May 23, 2007 NSMA.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.20 – High Altitude Platform Stations (HAPS) Presenter: Dick Butler.
The Telemetry Agenda Item: Outcome of ITU-R WP 8B San Diego, CA October 25, 2006 Ken Keane Duane Morris, LLP 1667 K Street, NW Washington, DC
John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.15 – Oceanographic radars 3–50 MHz Presenter: Paul Hettrick.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.14 – Radiolocation Service 30–300 MHz Presenter: Darrell Ninham.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Agenda item 1.5 Use of the Fixed Satellite Service by Unmanned Aircraft Systems.
Agenda item Review of RR No Space Research Service Presenter: Carol Wilson (Coordinator: Kevin Knights)
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
Agenda item 1.16 VHF data exchange system (VDES).
Agenda Item: 1.8 Title: to review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Fifth SADC Preparatory Meeting for the WRC-15 AGENDA 1.18 To consider a primary allocation to the radiolocation service for automotive applications in.
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Agenda item 1.17 – Spectrum and regulatory requirements for WAIC.
Agenda Item: 1.12 Title: Extension of current worldwide allocation to the Earth exploration–satellite (active) service in the frequency band 9300– 9900.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
CEPT Conference Preparatory Group
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Cindy Cook Chairman, TG 5/1 November 2, 2016
Panel Session 2 WRC-15 Agenda items 1.16, 1.4, 1.15
PRELIMINARY POSITION OF THE RCC CAs ON THE AGENDA ITEMS OF THE WORLD RADIOCOMMUNICATION CONFERENCE 2012.
Panel Session 3 WRC-15 Agenda item 1.1
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi.
Doriana Guiducci, European Communications Office
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
SADC WRC-15 5th Preparatory Meeting
Draft ICAO Position for ITU WRC-19
SADC WRC-15 Preparatory Meeting
SADC WRC-15 Preparatory Meeting
Draft ICAO Position for ITU WRC-15
World Radiocommunications Conference
John Taylor Nairobi, Kenya Sept 3-4, 2013
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
GSC position on key WRC-19 AI 1.5 ESIMs
INMARSAT > CTO> RMA
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)

WRC-15: Agenda item >to consider, in accordance with Resolution 758 (WRC ‑ 12), possible new allocations to the fixed-satellite service in the frequency bands MHz (space-to-Earth) and ‑ MHz (Earth-to-space), subject to appropriate sharing conditions. Background >Main proponent for these allocations was France, with application for allocation not clear. >This was a contentious item during the working party cycle leading up to the conference, and studies had not been elevated from a preliminary draft status. >All input contributions proposed No Change with the exception of the CEPT contribution that supported allocations in both bands.

Australia’s position: >Supported CPM Report Method C (no change) on the basis that ITU-R studies had not demonstrated that coexistence of the proposed FSS allocation could be practically achieved without imposing undue constraint and regulatory burden on some incumbent services. CPM Methods proposed: >Method A –GSO downlink allocation ( MHz) and uplink allocation ( MHz). >Method B – GSO downlink allocation ( MHz) and uplink allocation ( MHz). >Method C – No new allocation.

WRC-15 Considerations: >Main concerns of all regional organisations/administrations (other than CEPT) included that: Studies had not been finalised. FSS/SRS sharing in the 7 GHz downlink band would require very difficult operational coordination. The uplink 8 GHz band would required very large coordination distances with SRS/SOS possibly overlapping administration boundaries. Concerns from some administrations (primarily ASMG, ATU, RCC and some APT members) about the impact on their extensive existing FS systems. > Limited support to France from Luxembourg, Norway and Netherlands.

WRC-15 Considerations: >Several working group and ad hoc meetings were held at which France attempted to alleviate FS concerns via various proposals: Minimum FSS earth station antenna diameter of 3.5m (or more) and only at known locations. Introduction of hard pfd limits at the borders of countries. Minimum distance from the border (50km, then 120km and 300km). >France also attempted to alleviate SRS concerns via various proposals: Proposed pfd mask and operational coordination. Allocation only in Near Earth portion of SRS band (Method B). > France later proposed a return to Method A but with a regional allocation only (subset of European administrations) via footnote.

WRC-15 Considerations: >Finally France proposed an uplink only FSS allocation ( MHz) combined with studies during the WRC-19 cycle of a downlink in a new portion of the 7 GHz band (not shared with SRS). > At a final ad hoc group meeting several regions including APT, RCC and CITEL indicated that their positions remained No Change due to lack of time to consider the detail of the various proposals and other remaining concerns.

WRC-15 Outcomes: >The final text approved at the conference resulted in No Change to the Radio Regulations related to this agenda item. Conclusion and Future Actions: >The outcome was in complete alignment with Australia’s position supporting Method C (No Change) with no new allocation. >No specific follow-up action required.

Agenda item Allocation to the Maritime Mobile Satellite Service in the 7-8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)

WRC-15: Agenda item >to consider, in accordance with Resolution 758 (WRC ‑ 12), the possibility of allocating the bands MHz and MHz to the maritime-mobile satellite service and additional regulatory measures, depending on the results of appropriate studies. Background >Study from France concluded up to total 750 MHz Spectrum required to meet future MMSS broadband data needs in the 7-8 GHz bands. >Proposal was to extend existing MMSS Primary allocation in bands MHz (space-to-Earth) and MHz (Earth-to- space).

Australia’s position: >Did not support CPM Report Method B on the basis that ITU-R studies had not demonstrated that the proposed MMSS (Earth-to- space) MHz allocation could coexist with some incumbent services. >Did not oppose CPM Report Method C which would provide a new MMSS (space-to-Earth) MHz allocation. CPM Methods proposed: >Method A –No change >Method B – Downlink ( MHz) and Uplink ( MHz) allocations >Method C – Downlink ( MHz) only allocation

WRC-15 Considerations: >Agreement among participants that no uplink allocation should be made (due to the large impact on existing services). >Discussion then centred on feasibility of a downlink allocation. >Concerns raised about the asymmetrical nature of a downlink only allocation and that proponents would seek an uplink in future. >Some concerns about interference from terrestrial services. >CEPT and Korea drafted proposal for Downlink only allocation (limiting use of the band to GSO networks, with MMSS not claiming protection from or constraining FS and MS, and pfd limits). >Sharing seen as the same as between MMSS/FS and existing FSS/FS. Overall the CPM Report showed sharing feasible for downlink allocation.

WRC-15 Outcomes: >The final text provides a downlink only primary allocation to MMSS in the frequency range ‑ MHz with two footnotes limiting use to geostationary-satellite networks and with the condition that earth stations in the MMSS shall not claim protection from, nor constrain the use and development of, stations in the fixed and mobile, except aeronautical mobile, service.

Conclusion and Future Actions: >The final text (Method C) is in complete alignment with Australia’s position that opposed Method B (which included an MMSS uplink allocation in the band MHz) and did not oppose Method C (MMSS downlink only allocation). >No specific follow-up action required.