Open Workbench By Wilmer Arellano Spring 2008. This is just an example, you can customize as you like.

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
0Quit Student ePlanner 1.Launch Outlook & the Panther Portal: 1.Open Start  All Programs  Office Productivity  Microsoft Outlook Right-click.
Introduction to Spreadsheets in Project Planning Bent Thomsen.
Using LMPlan - Version 1.6 by AlNik Solutions, LLC Copyright 2011 ©
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Microsoft Project Presentation By Corey Johnson 10/11/00.
PowerPoint Lesson 3 Working with Visual Elements
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Microsoft Office Project 2007: Managing Projects.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Managing Multiple Projects Lesson 9. Skills Matrix SkillsMatrix Skill Manage consolidated projectsCreate a consolidated project plan Create dependencies.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
MS-Project tutorial Phongphan Danphitsanuphan CSSE – Computer Science Dept University of Southern California.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
A description of how to construct a Work Breakdown Structure (WBS) with past historical data on a project that is in-flighted to U PlanIT. Next © 2009.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
The Project Plan IT Project Management COSC
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Ahmad Al-Ghoul. Learning Objectives Explain what a Microsoft Project environment and Project Server. Describe how to use the Ribbon, Quick Access Toolbar.
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Progress Reports. Schedule m m.
Data Analysis Activity Data Analysis Enter data with 100% accuracy Format Cells.
By Wilmer Arellano Fall 2009
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Microsoft Project Tutorial Jesal Bhuta
Using Project Portfolio Tool ‘PMFolio’ by AlNik Solutions, LLC Copyright 2011 ©
1 Copyright © 2015 Pearson Education, Inc. Module 1 Workshop 2 Creating a Detailed Project Plan Series Editor Amy Kinser by Kristyn Jacobson.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Advanced Project Schedule Formatting Lesson 14 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project.
SOW / Open Workbench By Wilmer Arellano Fall 2010 Wilmer Arellano © 2010.
1 Microsoft Project 2010 Demo Part 2. 2 Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8. Be sure to click Project/Project Information to.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
Student’s Guide to. Press “FILE” Press “OPTIONS”
Gantt Chart of Progress FY
By Wilmer Arellano Spring 2010
Basic router configuration
Software project mgt. session # 3– lab manual.
Microsoft Project 2007 Demo Part 3
ENGINEERING MANAGEMENT (GE 404)
Project Management Skills
Software project mgt. session # 3– lab manual.
Gantt Chart of Progress FY
Microsoft Project 2007 Demo Part 1
ENGINEERING MANAGEMENT (GE 404)
Introduction to Spreadsheets in Project Planning
Information System Analysis
All Right Reserved © JiJi Technologies Pvt Ltd
Microsoft Project 2007 Demo Part 2
By Wilmer Arellano Fall 2010
Microsoft Project 2013 Demo Part 2
Progress Reports.
By Wilmer Arellano Summer 2013
Presentation transcript:

Open Workbench By Wilmer Arellano Spring 2008

This is just an example, you can customize as you like.

In Favorites Gantt Charts, double-click the little square and enter: A new Phase with: Name Category And ID Make sure to select phase

The first phase has been created

In Favorites Gantt Charts, double-click the little square and enter: The Tasks with: Names Category And ID Duration Make sure to select task

The first task has been entered

This is how it would look after all tasks for the first phase have been entered

To indicate task’s dependencies drag from the end of one task to the beginning of the next one

Click here to auto- schedule

This is how it would look like Red Color indicates the Critical Path

Project with two phases included It is a coincidence that the two phases have same duration

Click to see the PERT The zoom commands were used to fit the chart in the window

On planning, Resource assignment, double click the little square to enter the resources and their costs

Do the same for non labor resources Use Equipment for Space

You can add the cost of components as “material”

Right click on the tasks and select assignment to assign resources to the tasks

Right click on the tasks and select assignment to assign resources to the tasks. Enter estimated hours in Estimate

As components were entered with a rate of $100, 1.5 will represent $150

The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed If you need to add a new task or phase in between tasks or phases, right click the square and select insert task

There will be a problem if you click schedule again

As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential. You would need to add more resources to keep the tasks in parallel The zoom commands were used to fit the chart in the window

Another Low Frequency Engineer was included Two more Lab Spaces were included It was not necessary to increase the project duration

Click on controlling and then Revise Schedule to see the budget

Set The base Line Updating The Project Status

The task bar changes colour to reflect status (Red / Blue – Not Started) (Purple – Started) (Grey – Progress completed) The task name changes colour to reflect status (Red – Not Started) (Purple – Started) (Green – Completed)

Updating The Project Status If the task is completed enter 0 in Estimate

Updating The Project Status We reduced 20 hours but because of the weekend it appears to be a longer time

Milestones

Drag the milestone to the desired location

Milestones

Copy and Paste Table cells can be copied and pasted into excel By the way, this is a representation of the WBS

The Budget Even the Components are included here

& & Q uestions A nswers