OBJECTIVES  Identification of suitable jute geotextiles (JGT) material and application technology for hill slope protection in different agro-climatic.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Geotextile based Environmental Management Systems
Beneficial Management Practices for Saskatchewan Species at Risk: Western Spiderwort Threatened.
Earth Control Measures at Project Detail Site Location Marina Barrage.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Koushik Das, P K Choudhury, S.K.Chakrabarti, and Prabir Ray.
Wall construction steps and illustrations Incan construction.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
MODIS image of central California Funding. The SSCZO is supported by NSFs Earth Sciences DivisionMore information:
Dr. S. K. Chakrabarti INDIAN JUTE INDUSTRIES’ RESEARCH ASSOCIATION
Jute Geotextile – Potential and Application in Road Works
LANDSCAPE WALLS. Raised bed Prevent erosion LANDSCAPE WALLS Level planting areas.
Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.
Jordan – Vickery Walkway TJ MedlockNeil Wilson. Existing site background Once was lively and stable Drought and financial issues Surround trees providing.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
WATER CONSERVATION PRINCIPLES AND PRACTICES. Water conservation “ The conservation treatment meant to reduce or prevent sheet erosion while achieving.
Effect of different jute geo- textiles on hill slope stabilization S.Manivannan O.P.S.Khola K.Kannan K.Rajan Central Soil and Water Conservation Research.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Presented by Jason Afinowicz Biological and Agricultural Engineering Department, Texas A&M University CVEN 689 Applications of GIS to Civil Engineering.
Mechanically Stabilized Earth (MSE) Wall Project Geotechnical Design CEG 4801 Fall 2010 Kamal Tawfiq, Ph.D., P.E. Due Date: 9/30/2010.
Impediments to larger acceptability of Jute Geotextiles.
Caltrans District 5 Landscape Architecture Department.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Most Common Conservation Practices Forestry Illinois.
BUET 1 B ANGLADESH U NIVERSITY OF E NGINEERING AND T ECHNOLOGY (BUET) Dept. of Civil Engineering Comparison of soil slope erosion of bare soil & soil covered.
Example of assessed technology / approach from Sehoul, The Cork oak assisted regeneration vs other Forest techniques Abdellah Laouina, Miloud Chaker, Mohammed.
Ian McBride Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Development and Application of Potentially Important Jute Geo-textiles (CFC/IJSG/21) Bangladesh Part Project Overview on the Progress & Achievements in.
RANGELAND HYDROLOGY BASIC CONCEPTS Lamar Smith Cascabel Ranch and Consulting Carta Valley, Texas.
Walk for a Day and the WQPL. Walk for a Day Proposed Regional Trail Hill Country Conservancy Greenways Inc. City of Austin LBJWC.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
ICFRE Work on Eco-Restoration of degraded hills in Aravalli Ranges A naked and exposed hill in Baranandra Kho Forest Block in Banswara in lower Aravalli.
Terrestrial Succession Meredith Burke June 13, 2002.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
PROVSIONAL DESIGN METHODOLOGY FOR LOW VOLUME ROADS AND HILL SLOPES MANAGEMENT WITH JUTE GEOTEXTILES National Jute Board (PEA)
ConocoPhillips DOGM Earthday Award Nomination Utah Division of Wildlife Resources Project: Price River Drainage Wet Meadow Enhancement.
Department of Civil Engineering,
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
SR-32 Sinkhole Repair Claiborne County Report - March 2010 EME.
By: Rick Ayers Yates County Soil & Water Conservation District
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
London Underground Kingsbury to Wembley Park Embankment Stabilisation Brent Civic Centre 22 July 2015 Mark Hart – Communities Relations Manager Andrew.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun.
Workshop on piloting the Payment for Ecosystems Services tool in Kyrgyzstan – Pilot project in the Chon-Aksuu watershed 18th-19th of July 2011 Cholpon-Ata.
Disturbance and Succession NOTES
Estimating Groundwater Recharge in Porous Media Aquifers in Texas Bridget Scanlon Kelley Keese Robert Reedy Bureau of Economic Geology Jackson School of.
How does soil erosion and quality effect your life?
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
15 Feet : Minimum Width for Zone 1 Zone 1 Functions: Bank Stabilization Shading (water temperature control) Flood Protection Stream Inputs: Structural.
Ecological Site Descriptions Foundation for Resource Management Decisions George Peacock Grazing Lands Technology Institute USDA-NRCS.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Observations and Ideas for Payment for Ecosystem Services in Central Asia.
EROSION CONTROL BY LAND MANAGMENT WHAT IS EROSION The detachment and transportation of soil particles from one place to other by running water, wind.
T19-1 Soil Science and Management, 4E Chapter 19 Urban Soils.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Retaining Wall Construction Building A Timber Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
WELCOME.
Geotechnical Engineering Department of Civil Engineering
The role of herbivore exclusion on the ecosystem function in Mount Fletcher, Eastern Cape, South Arica Nandipha G. Ndamane, Mathieu Rouget, Jorge L.
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
Seminar on prevention & control Landslides
Flood: Build a Stronger Plinth
4th Annual Construction Law Summit
US 50 SLOPE STABILIZATION PROJECT
Soil Conservation to save soil..
Presentation transcript:

OBJECTIVES  Identification of suitable jute geotextiles (JGT) material and application technology for hill slope protection in different agro-climatic situations in India.  Identification of suitable vegetative species and their performance under JGT application.  Assessment of JGT application on soil loss and runoff through simulated laboratory studies (runoff plots/hydraulic flume)  Duration: 3 years  Year of start: 2010

 Sites selected for JGT application at 3 locations representing different hill eco-systems in India viz;  Western Himalaya (Dehradun HQ)  Shivalik hills (Chandigarh Centre of Institute)  Nilgiris hills (Ooty Centre of Institute)  Technical details of sites worked out.  Three types of JGT i.e. 500, 600 & 700 GSM applied at site by Dehradun, Chandigarh and Udhagamandalam Centres. PROGRESS OF WORK

SALIENT INFORMATION ON SELECTED SITES FOR JGT APPLICATION

Installation of JGT at Ashti site, Chakrata Hills, Uttarakhand, N-W Himalaya, executed by CSWCRTI, Dehradun January 4 th, 2012

A close view of the untreated site Geojute bundles being transported to site JGT laid on ground ( ) Wooden pegs used for anchoring JGT

JGT secured by constructing a trench on upper side Inspection of the JGT layout by experts of CSWCRTI & NJB ( )

PERFORMANCE OF JGT Performance of JGT after 6 months (July 2012) Vegetation in the JGT area (after one year)

Survey of vegetation in JGT area Geojute materialFrequencyDensity 700 GSM -Site I GSM - Site II GSM - Site III Control Frequency and density of herbs, shrubs and grasses at sites treated with different geojute materials and control

Performance of JGT after 1 /2 years ( ) Grasses & shurbs coming in geojute area Area is freely grazed by goats JGT reinforced staggered retaining walls (on downward side) performing well in retaining debris AFTER ONE & HALF YEARS

A general view showing JGT application for hill slope management and JGT reinforced retaining walls below Performance of JGT in degraded hill slopes (July 2013, see gravels below) JGT reinforced retaining wall for debris retention and slope stabilization (A close view)