Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.

Slides:



Advertisements
Similar presentations
A MAPS-based readout of an electromagnetic calorimeter for the ILC Nigel Watson (Birmingham Univ.) Motivation Physics simulations Sensor simulations Testing.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
White Papers, Framework Proposals, FOA’s, and LCDRD John Jaros SiD Meeting Oregon ALCPG March 23, 2011.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
1 Tianchi Zhao University of Washington Concept of an Active Absorber Calorimeter A Summary of LCRD 2006 Proposal A Calorimeter Based on Scintillator and.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Generic Detector R&D for an Electron Ion Collider Advisory Committee meeting January 13-14, 2014 T. Ludlam NSAC 2013 Subcommittee.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Haga clic para modificar el estilo de texto del patrón Infrared transparent detectors Manuel Lozano G. Pellegrini, E. Cabruja, D. Bassignana, CNM (CSIC)
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
The Case for the Dual Readout Calorimetry for SiD Adam Para, December 4, 2007.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
1 OFFICE OF ADVANCED SCIENTIFIC COMPUTING RESEARCH The NERSC Center --From A DOE Program Manager’s Perspective-- A Presentation to the NERSC Users Group.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
SiD R&D Priorities Andy White University of Texas at Arlington SiD Workshop at SLAC March 2009.
SiD Detector Baseline (A brief review) Andy White University of Texas at Arlington.
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
Simulation studies of total absorption calorimeter Development of heavy crystals for scintillation and cherenkov readout Dual readout in the 4 th concept.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO Call nell’ambito della CSN5 dell’INFN Oscar.
Fermilab Budget Briefing FY Generic Detector Research and Development KA Breakout Erik Ramberg Fermilab February, 2013.
Detector Prospects for the Muon Collider Tracking Ronald Lipton - Fermilab Can we perform experiments in the harsh background environment of the Muon Collider?
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
Technology and R&D Summary and next steps Burkhard Schmidt.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
SiD R&D Plan and Opportunities for New Collaborators
Final CALICE OsC meeting: Status and summary of project
SiD Calorimeter R&D Collaboration
Where are we? What do we want to do next? Some thoughts
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC detector at SiD meeting 28/3/2010
Calorimetry for a CLIC experiment
January Collaboration Meeting
Vishnu V. Zutshi For the NICADD team.
Detector R&D in KAPAC Outline Compton Camera SOI detector
ILC Detector Technology
Andrei Seryi Materials for discussion TILC-08
Scientific Computing Strategy
Presentation transcript:

Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008

SiD Workshop, Jan , M. DemarteauSlide 2 Some History The Fermilab detector community has been slow in embracing the ILC Initial attempts with narrow focus were not successful Realizing the difficulties to create a successful detector R&D program, adopted a different strategy Our philosophy: detector R&D that is of high enough caliber will be applied in any future experiment –Focus on what we believe are the most promising technologies –Focus on those systems that need an advancement in technology most –Build on our significant strength and strong expertise in engineering for particle detectors – both electrical and mechanical –All detector R&D is carried out with a long time scale in mind, within a broad context but with an ILC emphasis –Adopt a fully integrated approach, that is, cover all system aspects e.g vertex detector: sensor development, associated readout, power delivery, mechanical support, beam tests Defer downselect from a “horizontal approach” to a “vertical approach” as late as possible

SiD Workshop, Jan , M. DemarteauSlide 3 Establishing the 3D silicon Vertical Integration Technology and study of the SOI technology for the application of particle detectors Emphasis is on the development of pixel vertex detectors and associated readout requirements Development of low-mass silicon vertex detectors and trackers Emphasis is on the study of novel support materials and integrated designs, particularly the forward region. Concurrent development of the tracking software enabling optimization of the detector design Characterization of Geiger-mode Avalanche Photo Diodes and their application Geiger-mode Avalanche Photo Diodes allow for highly segmented and highly integrated detector designs with wide range of application, such as scintillator-based detector readout, dual readout calorimetry and muon detection. Study of the feasibility of total absorbing crystal calorimetry based on dual readout As an alternative to PFA with possibly better energy resolution, study of doped crystals for separate readout of Cherenkov and scintillation light Test Beam Provide the support to the user community for beam tests of new technologies ILC Detector R&D: Main Foci

SiD Workshop, Jan , M. DemarteauSlide 4 ILC Detector R&D: Budget Evolution of ILC detector R&D effort over the last few years FY08 –*: An additional $350k in M&S was requested from ART for a dedicated 3D silicon submission –About 4 FTE’s from the Computing Division and 2 FTE’s from the Accelerator Division –M&S budget spent to date: $50k –If additional M&S will be made available for the remainder of the year is unclear ILC detector R&D is not part of the DOE ILC B&R categories –Detector R&D in principle not restricted and could be continued –However, R&D program needs to be realigned given the tectonic budgetary shifts of the ILC and the lab

SiD Workshop, Jan , M. DemarteauSlide 5 Implications for SiD The Computing Division has ceased nearly all ILC effort –Major setback for SiD tracking simulation, the main area where SiD distinguishes itself from the other concepts The lab supports the notion that some technologies are too promising to stop, notably 3D Vertical Integration, SiPM and dual readout There is an unavoidable shift to other applications –Recent focus of 3D effort more towards LHC applications –Interest from the CLIC community in dual readout There will be increased pressure on resources, which will negatively affect the SiD effort, eg. mechanical and electrical engineering Test beam will be fully supported; CALICE coming in March ’08.

SiD Workshop, Jan , M. DemarteauSlide 6 How to Move Forward ? Submitted a ‘keep-alive’ M&S budget request for $180k (in addition to the money spent) Synergies with other projects to establish a more generic detector R&D program –With such a large talent pool, the only way I see possible to maintain and grow a healthy detector R&D program, given the recent events which put many project on an uncertain time scale, is to work within as broad a context as possible. There will be a staff reduction of 100 – 200 people. The remaining staff will need to support the core program. What the implications are for SiD and the ILC detector effort in general is hard to predict at this point.