TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.

Slides:



Advertisements
Similar presentations
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
Advertisements

Structure of the Application Evaluation Criteria Oskar Otsus January 2013 Moldova.
CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
Name Speaker This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding from the European.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
Specific Programme Cooperation in FP7 - Proposal submission -
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
A global multidisciplinary network on housing research and learning WP3 Report Leandro Madrazo La Salle School of Architecture Barcelona, Spain Tirana,
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
PATCH-WORLd PArenTs and CHildren Working, ORganising and Learning together 23/24 October 2009 Sofia Final Conference This project has been funded with.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Stepping up Economic and Technological Intelligence Brussels, 18 December 2002 Germán Valcárcel European Commission DG Research - Research and SMEs.
PROJECT LIFECYCLE.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
FP6 IT System 1 ELECTRONIC PROPOSAL SUBMISSION SYSTEM.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Management of Tempus projects Kick-off meetings of 2011 projects.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
State of Georgia Release Management Training
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
DG Justice and Consumers Project Management Some points of attention JUST/2014/JCOO/AG/CRIM and JUST/2014/JCOO/AG/CIVI Kick-off meeting 26 January2016.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
Connecticut Department of Public Health - Keeping Connecticut Healthy Connecticut Department of Public Health PHABuloCiTy! Public Health Accreditation.
CYSM Collaborative Cyber/Physical Security Management System Assistant Professor Nineta Polemi University of Piraeus, “PREVENTION, PREPAREDENESS.
Reports Sources & Documents in CYSM Digital Library Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
CYSM Risk Assessment Methodology Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme.
1 Dr. Spyros Papastergiou, University of Piraeus (Greece)–Dept. of Informatics M. Zaharias Singular Logic (Greece) CYSM Risk Assessment Methodology.
Professor Joseph Hassid UNIVERSITY OF PIRAEUS RESEARCH CENTRE 14 – 15 November 2013, Lisb on ● Joseph Hassid – 15 November 2013 This project has been funded.
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Administrative and financial management Third Steering Committee Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Administrative and financial management 4 th Steering Committee Meeting Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism.
Overall Exploitation & Sustainability Strategy 4th Steering Committee meeting Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
WP3 - Evaluation and proposal selection
Overview of the first project year
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
Dissemination Plan made from EDUNET LEONARDO PARTNERSHIP PROJECT
WP 1 Management and Coordination
Presentation transcript:

TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme of the European Union Valencia, May, 9 th 2013 David Incertis Jarillo

Quality control procedures

Quality Control Manager: David Incertis Jarillo Project Manager – Safety and Security Issues FEPORTS

Quality control procedures Q Manager Under Task 1.2: Consortium Administration and Quality Control Deliverables: D1.1: Mid term and final reports D1.2: Quality Control Handbook Collaborators:

Quality control procedures Previous information for each activity/task: Description: Abstract, objectives, expected results Methodology: Guidelines, templates, software, tasks distribution, etc. Dates: Start and finish dates, time-line, deadlines Responsible: WP leader, collaborators, authors… Deliverables: Formats, level of distribution What?, How?, When, Who?

Quality control procedures Internal audits: Frequent checks of the state of implementation of activities, deadlines,… Control of documents, reports and deliverables Consideration of risks and assumptions Consideration and proposition of changes, adaptations, re-organization Frequent communication with WP leaders ( , skype, phone)

Quality control procedures Reporting: To the Technical Coordinator through formal communications To the Commission through the Mid-term and Final reports Discrepancies/disagreements/breaches: Three steps: Technical Coordinator Steering Committee Programme Commission

Document Quality Control 8

Document control Use of templates: Administrative: SC Agenda Attendance Sheet Delegation of Signatures Registration form Time-sheet Minutes Technical: General Document Others: Power Point Presentations Press releases Official CIPS Templates: Audit Certificate Mid term progress report Delegation of Signatures Final Technical Implementation Time-sheet Financial Identification Form Budget Execution

Document control Deliverable Id : Deliverable Name: Due date of deliverable : Actual submission date : Work Package : Organization name of lead contractor for this deliverable: Author(s): Partner(s) contributing : Document Identification table

Document control History table VersionDateModification reasonModified by

Document control Project Identification table Project Acronym CYSM European Programme Prevention, Preparedness and Consequence Management of Terrorism and other Security- related Risks Programme of the European Union Agreement nº HOME/2012/CIPS/AG/ Project Partners Feports (ES), Fundación Valenciaport (ES), University of Piraeus Research Centre (GR), Singular Logic (GR), Piraeus Port Authority (GR), Dipartimento di Ingegneria Navale, Elettrica, Elettronica e delle Telecomunicazioni-UNIGE (IT) Coordinator Name of institution Workpackage Code Deliverable nº Deliverable full title Dissemination level Public/Private/Restricted Deliverable format Publication date Month Year Publication status Number of version/draft/final… Authors Address Contact Name and Surname Tel. +XX XXXXXXX Project Official Site Project total budget Project Start date (duration) April, 16th 2013 (24 months)

Document control Important sections: Cover page Abstract Identification/history tables Index (contents): sections, tables and figures Appendices and annexes

Document control Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme of the European Union “This Project has been funded with support from the European Commission. This publication reflects the views only of the authors, and the European Commission cannot be held responsible for any use which made be made of the information contained therein” For any publication: For any deliverable:

Deliverables based on documents D2.1 Desk Research D2.2 Stakeholders Requirements D2.3 CYSM Approach and Methodologies Specification D2.4 CYSM System Architecture D3.1 Cyber and Physical Assets Modeling D3.2 Risk Management Models D5.3 Evaluation (Technical, Usability, Financial, Wider Impact) D5.4 Best Practices, Blueprints and Policy Development Guidelines

Deliverables Sharing and storage All the documents, reports, presentations, press releases and deliverables have to be uploaded in the project intranet: Pay attention to the version of document. Please, do not erase a version if you want to modify it, just update it with a new document!

Activities Implementation

Tasks to be implemented T3.3 CYSM Risk Assessment Toolkit T4.1 Port CIIs Security Management Functionalities T4.2 Management and Production of Document and Artifacts T4.3 Web2.0 Collaboration Functionalities T5.1 Integration of the Platform T5.2 Testing, Validation and Fine Tuning

Tasks to be implemented For testing and validation and other quality control procedures, EUROPHAR, the European Economic Interest Association committed to the environmental protection, safety and security at ports will act as consultant

Thank you David Incertis Jarillo Project Manager – Safety and Security Issues Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme of the European Union