0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) +1.443.430.8089 31 October 2011.

Slides:



Advertisements
Similar presentations
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Advertisements

November SLS RFM and RNG REPORT 18 November 2004.
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 Security Policy Framework & CCSDS Common Criteria Use CCSDS Security WG Fall 2005 Atlanta, GA USA Howard Weiss NASA/JPL/SPARTA
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
1 SecWG New Business Discussions CCSDS CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA November 2004.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2012 Clevaland, Ohio, U.S.A. Takahiro Yamada, JAXA/ISAS.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 Information Security Planning Guide CCSDS Security WG Spring 2005 Athens, GR Howard Weiss NASA/JPL/SPARTA April 2005.
CCSDS Security Working Group Program Space IT Security Standards Products Howard Weiss SPARTA, Inc. (a Parsons Company)
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
CCSDS Reference Architecture Notes from SAWG discussion & from SEA Report to CESG/CMC 12 & 17 Nov 2014.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group January 25 Telecon.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
11 Identity Management Spacecraft ID Security CCSDS Security WG Fall 2005 Atlanta, GA USA Howard Weiss NASA/JPL/SPARTA September.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
KM SDLS Extended Procedures YB
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Security WG: Report of the Fall 2005 Meeting
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
Space Communication Cross Support Architecture WG
Security WG: Report of the Fall 2013 Meeting
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011

1 The CCSDS Security WG is chartered to: Develop security recommendations: - Encryption, authentication, key management, etc Develop security guides and informative documents: - Security architecture, threat, secure interconnection guide, key management, security glossary of terms, etc Provide advice and guidance to other WGs - E.g., Spacecraft Monitoring & Control, Space Link OVERVIEW 31 Oct, 2011

2 Berlin (May 2011) Progress: - Finalized and submitted charter revisions (since approved). - Security Architecture status: awaiting RIDS (since recd). - Reviewed Algorithm Book: more modifications. - Reviewed Algorithm Testing Yellow Book: needs more work. - Reviewed Security Glossary: a few more minor mods. - Reviewed Mission Planners Guide: done, ready for polling. - Reviewed Key Management Green Book: complete, ready for polling. - Discussed Key Management Blue Book: Making progress. - Discussed network layer security: agreed upon profile contents. Book to be written. - Discussed SDLS WG: making good progress. STATUS 31 Oct, 2011

3 STATUS (cont) Current Progress: - Completed: - Security Architecture (RIDS to be dispositioned in CO), - Key Management green book (submitted to AD & Secretariat), - Mission Planner’s Guide (CESG/CMC polling completed). - Continuing: - Algorithm Blue Book (new rev sent to WG) - Algorithm Yellow Book (new rev sent to WG) - Key Management Blue Book (in progress by ESA) - Security Glossary (new rev sent to WG) - Link Layer Security (in progress by NASA) 31 Oct, 2011

4 Algorithm Green Book Key Management Yellow Book Upper Layer Security - (1) Network layer (just starting) - (2) Application layer Cross Support Issues - E.g., Cross realm identification, authentication, access control - Increased SLE security? - Increased SM&C security? Integrate Individual Documents - possibly tie them together with a mission security Protection Profile (PP) using the Common Criteria FUTURE WORK AREAS 31 Oct, 2011

5 AGENDA 31 October 2011 – 08:45 – 09:45: CCSDS Plenary – 09:45 – 12:00: Systems Engineering Area (SEA) Plenary 1 November 2011 (09:00 – 17:00) – Welcome, opening remarks, logistics, agenda bashing, introductions – Review results of Spring 2011 (Berlin) meeting – Status of documents – Review newly updated CWE entries: charter, programs, schedules – Algorithm Document review (Weiss) – Algorithm Yellow Book review (Weiss) – Glossary Review (Weiss) – Security Architecture RID Disposition (Black) 31 Oct, 2011

6 AGENDA (cont) 2 November 2011 (09:00 – 17:00) – Key Management (Fischer/Aguilar-Sanchez) – Threat book review (All) – Cross Support (All) ?? – SM&C Support (Fischer) ?? – Network Layer Security Update (Weiss) – Link Layer Security Update (Biggerstaff/Weiss/Aguilar-Sanchez) – Other areas of discussion – New work areas 3 November 2011 – 09:00-17:00: Space Data Link Security WG 4 November 2011 – 09:00-12:30: Space Data Link Security WG – 13:00-17:00: SEA Wrap-up Plenary 31 Oct, 2011