EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)

Slides:



Advertisements
Similar presentations
Topics to be Covered 1. Material Requirement Planning
Advertisements

MRP and Related Concepts
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning
MRP and ERP Chapter 12.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
MRP, MRP II, and ERP.
 You should be able to: 1. Describe the conditions under which MRP is most appropriate 2. Describe the inputs, outputs, and nature of MRP processing 3.
Chapter 12 MRP and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Adeyl Khan, Faculty, BBA, NSU. Material requirements planning (MRP)  Computer-based information system that translates master schedule requirements for.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
MRP.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
CHAPTER 12 MRP and ERP H.W.: 2,6,8, and 17..
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 14 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP.
CHAPTER 14 MRP and ERP.
Chapter 12 MRP and ERP McGraw-Hill/Irwin
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement) 1980’s - MRP II – Manufacturing Resources Planning (Extended MRP to shop floor & distribution Mgnt.) Mid 1990’s - ERP – Enterprise Resource Planning (Covering all the activities of an Enterprise) 2000 onwards – ERP II – Collaborative Commerce (Extending ERP to external business entities)

Evolution to ERP   MRP - Material Requirements Planning   what material needed?   when & how purchased?   how managed?   maximize efficiency of physical, financial assets   MRP 1970's   master production schedule   material requirements planning   capacity requirements planning Enterprise Resource Planning

  MRPII 1980's   sales & operations planning   simulation   forecasting Enterprise Resource Planning

  ERP 1990's   sales and distribution   material management   plant maintenance   quality management   financial accounting   controlling   investment management   human resource management Enterprise Resource Planning

Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed, how much is needed, and when is it needed   Dependent demand – Demand for items that are sub- assemblies, parts or raw materials to be used in the production of finished goods.   Independent demand – finished products

Independent vs Dependent Demand Time Demand Stable demand “Lumpy” demand Amount on hand Safety stock

MRP InputsMRP ProcessingMRP Outputs Master schedule Bill of materials Inventory records MRP computer programs Changes Order releases Planned-order schedules Exception reports Planning reports Performance- control reports Inventory transaction Primary reports Secondary reports

MRP Inputs   Master Production Schedule (MPS) – States which end items are to be produced, when they are needed, and in what quantities   Bill of Materials (BOM) – a listing of all of the raw materials, parts, and sub-assemblies needed to produce one unit of a product   Inventory Records – includes information on the status of an item during the planning horizon, eg. quantity, supplier, order lead time, lot size

Master Schedule Master schedule: One of three primary inputs in MRP; states which end items are to be produced, when these are needed, and in what quantities. Cumulative lead time: The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly.

Planning Horizon Procurement Fabrication Subassembly Assembly Figure 15-4

Bill-of-Materials Bill of materials: One of the three primary inputs of MRP; a listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product. Product structure tree: Visual depiction of the requirements in a bill of materials, where all components are listed by levels.

Product Structure Tree Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Figure 15-5

Assembly Time Chart Procurement of raw material D Procurement of raw material F Procurement of part C Procurement of part H Procurement of raw material I Fabrication of part G Fabrication of part E Subassembly A Subassembly B Final assembly and inspection Figure 15-7

MRP Processing Processes the following for each time period:   Gross requirements   Schedule receipts   Projected on hand   Net requirements   Planned-order receipts   Planned-order releases

MRP Outputs Primary Reports   Planned Orders – schedule indicating the amount and timing of future orders   Order Releases – Authorization for the execution of planned orders   Changes – revisions of due dates or order quantities, or cancellation of orders

MRP Outputs Secondary Reports   Performance-control reports – Evaluation of system operation, including deviations from plans and cost information   Planning reports – Data useful for assessing future material requirements   Exception Reports – Data on major discrepancies encountered

Other Considerations   Safety Stock   Lot sizing   Lot-for-lot ordering   Economic order quantity   Fixed-period ordering   Part-period model

Capacity Planning   Capacity requirements planning – the process of determining short-range capacity requirements   Load reports – Department or work centre reports that compare known or expected future capacity requirements with projected capacity availability   Time fences – series of time intervals during which order changes are allowed or restricted

MRP Planning Develop a tentative master production schedule Use MRP to simulate material requirements Convert material requirements to resource requirements Firm up a portion of the MPS Is shop capacity adequate? Can capacity be changed to meet requirements Revise tentative master production schedule Change capacity Yes No Yes No

Benefits of MRP   Low levels of inventories and reduction in manufacturing lead time   Ability to track material requirements hence reducing shortages   Ability to evaluate capacity requirements   Means of allocating production time

Manufacturing Resources Planning (MRP II)   Involves the whole production process, starting with aggregate planning, then MPS and finally MRP.   Emphasizes integration with:   Financial planning   Marketing   Engineering   Purchasing   Manufacturing   Personnel

Market Demand Production plan Problems? Rough-cut capacity planning Yes No Yes No Finance Marketing Manufacturing Adjust production plan Master production schedule MRP Capacity planning Problems? Requirements schedules Adjust master schedule MRP II

Enterprise Resource Planning (ERP)   Integration of financial, manufacturing and human resources on a single computer system.   Represents expanded effort to integrate standardized record keeping using one database that will permit information sharing among different areas of an organization to manage the system more effectively.