Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,

Slides:



Advertisements
Similar presentations
Last update 01/06/ :23 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD Site Registration policy & procedures
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
IS 700.a NIMS An Introduction. The NIMS Mandate HSPD-5 requires all Federal departments and agencies to: Adopt and use NIMS in incident management programs.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Release Management in SAP David Osborne, Planning & Release Management, Canada Customs and Revenue Agency May 20, 2003 Session 2909.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Release & Deployment ITIL Version 3
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Introduction to Software Quality Assurance (SQA)
Rational Unified Process Fundamentals Module 4: Disciplines II.
Roles and Responsibilities
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
EGEE ARM-2 – 5 Oct LCG Security Coordination Ian Neilson LCG Security Officer Grid Deployment Group CERN.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
The Grid System Design Liu Xiangrui Beijing Institute of Technology.
1 OSG Accounting Service Requirements Matteo Melani SLAC for the OSG Accounting Activity.
European Middleware Initiative (EMI) – Release Process Doina Cristina Aiftimiei (INFN) EGI Technical Forum, Amsterdam 17. Sept.2010.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Kelsey RAL/STFC,
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
GGUS at PEB – –- page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe LCG-PEB-Meeting ( ) The Global Grid User Support Model (Report of GDB.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft GDB - WG5 - First Ideas WG5 – User support – First ideas Mandate: Recommend the.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
DTI Mission – 29 June LCG Security Ian Neilson LCG Security Officer Grid Deployment Group CERN.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Operations Activity Doug Olson, LBNL Co-chair OSG Operations OSG Council Meeting 3 May 2005, Madison, WI.
Security Policy: From EGEE to EGI David Kelsey (STFC-RAL) 21 Sep 2009 EGEE’09, Barcelona david.kelsey at stfc.ac.uk.
State of Georgia Release Management Training
Chapter 3 Pre-Incident Preparation Spring Incident Response & Computer Forensics.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE ARM-2 – 5 Oct LCG/EGEE Security Coordination Ian Neilson Grid Deployment Group CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
1 Proposal for a technical discussion group  Because...  We do not have a forum where all of the technical people discuss the critical.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Why a Commercial Provider should Join the Academic Cloud Federation David Blundell Managing Director 100 Percent IT Ltd Simple, Flexible, Reliable.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
Bob Jones EGEE Technical Director
Status of Task Forces Ian Bird GDB 8 May 2003.
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
JRA3 Introduction Åke Edlund EGEE Security Head
Ian Bird GDB Meeting CERN 9 September 2003
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
LCG/EGEE Incident Response Planning
LCG Operations Centres
Description of Revision
Leigh Grundhoefer Indiana University
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning, RC coordination, etc Operations Infrastructure: Grid services, VOs, etc AAA,Security perf. monitoring Operations centre Certification & Test Middleware Packaging & Installation User Support Consultancy, Integration with expt. software Call Centre, Helpdesk, Documentation Training LCG Middleware advisory group Experiment grid experts inc. US rep. Grid technology experts HEPCAL use-cases Maintenance

Middleware Selection TWG Proposed Mandate: Select and recommend the grid middleware components to be deployed in LCG-1, with implementation schedules coordinated with the requirements of the experiments and with LCG milestones. The requirements of the experiments, in terms of functionality needed for specific data challenges, will be based on a prioritized list of use- cases from the HEPCAL document. …

Service & Resource Scheduling & Planning TWG Proposed Mandate: Recommend policies for allocating resources to experiments. Suggest how the allocation process should be implemented, including a request and review process as necessary to ensure fair allocations within the guidelines of the funding agencies… Determine common metrics for allocating and accounting usage of various resources. Should there be a common policy on priorities of grid users versus local users? If so, determine the policy. Agree on the LCG infrastructure and responsibilities: –Recommend the services and resources to be provided by each site –Recommend the relative responsibilities of the site and the LCG teams – where is the boundary between site responsibility and LCG? –Recommend responsibilities for the operation of common services –Recommend an overall schedule for rolling out the infrastructure and computing resources for LCG-1.

Registration, Authentication, Authorization & Security Proposed Mandate: Recommend common Registration, Authentication, Authorization, and Security policies and procedures to ensure integrated availability of LCG- assigned infrastructure and resources to valid users. Registration & Authentication: –Acceptable use policy –Agreements and trusts between CA’s, RA’s etc –User Registration model –Constraints from sites on authentication and accountability Authorization: –Recommend a model for authorization that meets the constraints of the participating sites, and that satisfies the requirements of the experiments. Recommend how a model of authorization that includes layers of delegation of authorization be implemented. –Recommend a common model for mapping VO users to local users, and define a minimum requirement for accountability that satisfies the security needs of the sites. Security: –Agreements and procedures for security issues – must be agreed by all site security officers…

Operations TWG Proposed Mandate: Recommend an LCG model of operations; including defining the responsibilities of the LCG teams, the experiments and the participating site operations teams. Recommend a standard LCG operating environment; define the mechanism for implementing standard operating environments that satisfy the needs of the experiments; for example OS level, compilers, etc. How should the upgrade process be handled? What tools are required to implement this? What is the certification process? Agree on and recommend an LCG policy for deployment of middleware including the integration, testing, and certification process for release candidates of the software. Recommend a common accounting and reporting process for resource usage so that aggregate resource usage LCG-wide can be monitored. What are the requirements for this process? What reporting is needed back to the participating sites or to funding agencies? Recommend configuration management policies – what are the system administration requirements for grid services at a site?

User Support TWG Proposed Mandate: Recommend the initial LCG user support model, including: The scope of responsibilities for a call-center or helpdesk type facility serving LCG, Define the call center – one place or many, and define the process for communication to ensure problem resolution and tracking, user expectations (or service level agreements), including the framework within which to implement these, Define how such a facility interacts with local support services at sites providing grid resources, Recommend procedures and tools to track and coordinate distributed/grid problem resolution

Timescale TWG’s should report in December –Define initial set of (prioritised) basic functionality –Define performance goals Define LCG-1 by end 2002 –Middleware selection process during 2002 Compromise between experiment requirements and availability of supportable components –Test and certification of components 1H03 – iterative with developers and experiments requirements LCG-1 in production July 2003 –Add functionality according to expt. Needs and as feasible –Incorporate production systems (e.g. LXBATCH) into LCG-1 LCG-1 should meet performance targets by end 2003