Enhanced Biological Nitrogen Removal In PVA-Gel Based MBBR - A Novel Option To Save Dal Lake. J. Singh*, K.M.Gani*, N.K.Singh*, V. Rose**, A.A. Kazmi*

Slides:



Advertisements
Similar presentations
“Upgrading the collection and wastewater treatment system in Ploiesti City”
Advertisements

LEACHATE MANAGEMENT AND TREATMENT
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
1000 Friends of Florida Presentation on May 12, 2005 Presenter: Kart Vaith/CDM
Alternatives to Aboveground Effluent Disposal Mounds Overview of the NoMound ® System Technology.
Nutrient Issues at the Blue Plains WWTP February 2004.
Anne Arundel County Department of Public Works
Wastewater treatment steps Primary: solids removal (physical) Secondary: BOD treatment (biological) Tertiary: Effluent polishing, Nutrient and Toxins Removal.
SECONDARY TREATMENT Main aim is to remove BOD (organic matter) to avoid oxygen depletion in the recipient Microbial action Aerobic/anaerobic microorganisms.
WATER DEPTH, VEGETATION, AND POLLUTANT REMOVAL IN A CONSTRUCTED WETLAND TREATING AQUACULTURE EFFLUENT Brian E. Dyson, Kim D. Jones, Ron Rosati* Department.
SURVEY OF THE FOULING CHARACTERISTICS BETWEEN ATTACHED AND SUSPENDED SUBMERGED MEMBRANE BIOREACTOR.
UNDERGRADUATE PROJECT’S PROPOSAL SEMESTER I 2012/2013 Biohydrogen Production from Palm Oil Mill Effluent (POME) Using Immobilized Mixed Culture (Sludge)
INVESTIGATION OF BIOLOGICAL PHOSPHORUS REMOVAL IN A SEQUENCING BATCH REACTOR INVESTIGATION OF BIOLOGICAL PHOSPHORUS REMOVAL IN A SEQUENCING BATCH REACTOR.
Tertiary Treatment of Domestic Wastewater By
Waste Water Treatment System XERODROP
Wastewater Characteristics CE Importance of Characteristics The degree of treatment depends on: The degree of treatment depends on: Influent characteristics.
Nitrogen Removal from Yamuna River (India) using MBBR – Pilot Summary
Nitrification and Denitrification
Moving Bed Biofilm Reactor MBBR for Nitrification/Denitrification
1 CTC 450 Review WW Systems Operations. Last Homework Will replace your lowest homework grade
Activated Sludge Aeration Control Systems Do We Need 2.0 mg/L?
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
《 Water pollution control technology 》 Tianjin bohai vocational and technical college.
Nitrification Frequently Asked Questions NitrobacterNitrosomonas Note: There are other bacteria capable of nitrification. These are the only ones that.
Sewage Treatment System XERODROP By, Aeolus Sustainable Bio-Energy Pvt Ltd,
Jacqueline German CBE 555 March 9, Water is essential for life with one of the most important sectors relating to water that helps sustain life.
Aerobic and Anaerobic Reactor Configurations
Introduction: We will start with an overview of treatment processes 1) Why do we treat water and wastewater? The main objectives of the conventional wastewater.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Phosphorus Removal in a Membrane Reactor System— A Demonstration Study Wayne Lorenz, P.E. and Matthew J. Gavin Wright Water Engineers, Inc. and Newell.
The Living Machine & Leachate
Treatability Evaluation of Domestic Wastewater for a Rational Selection of Treatment Processes for a Rational Selection of Treatment Processes for Water.
Study on the Recycling and Reuse of Water Resources for the Arid and Water-deficient Area in Western China Key Project of the National Natural Science.
Nutrient recovery at the ashbridges bay wastewater treatment plant
Evaluation of alternative technologies for upgrading wastewater treatment plants in Minnesota for new phosphorus limits H. David Stensel University of.
TREATMENT OF A DAIRY FARM WASTEWATER USING A PILOT SCALE UPFLOW ANAEROBIC SLUDGE BLANKET (UASB) PROCESS By Ashveen Deerpaul & Arvinda Kumar RAGEN.
Adjusting N:P ratios in liquid dairy manure through nitrification and chemical phosphorus removal to match crop fertilizer requirements Background Nutrient.
1 CE 548 II Fundamentals of Biological Treatment.
1 NORWEGIAN UNIVERSITY OF LIFE SCIENCES Department of Plant and Environmental Sciences P.D. Jenssen 1 Water treatment processes Petter D. Jenssen.
1 CE 548 I Fundamentals of Biological Treatment. 2 Overview of Biological Treatment   Objectives of Biological Treatment:   For domestic wastewater,
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
Aerobic Treatment Processes Principles and Dimensioning Eduardo Cleto Pires.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
Electricity | Natural Gas | Water | Wastewater Adding Whey for Denitrification Dale Adams, P.E Managing Engineer, Colorado Springs Utilities September.
Green Filters: a sustainable wastewater treatment strategy for small towns in developing countries.
Ammonium removal with the anaerobic ammonium oxidation Song-E Baek.
Prepared by: Pn. Hairul Nazirah Abdul Halim
Membrane Bioreactors for Wastewater Treatment.
WATER MANAGEMENT.
Using PC simulation for flow sensitivity analysis with application to a wastewater treatment plant Panaitescu Ileana-Irina, Panaitescu Mariana, Panaitescu.
Welcome to the Key Largo Wastewater Treatment Plant.
Unit Process in Biological Treatment
National University Of Kaohsiung Taiwan
Effluent treatment……..
Chapter 7 - Fundamentals of Biological Treatment
Attached Growth Biological WW treatment Systems
Modified Ludzack-Ettinger Wastewater Plant
KING GEORGE COUNTY SERVICE AUTHORITY
Fundamental of Biological Treatment
OVERVIEW OF THE FUTURE TRENDS IN WASTEWATER TREATMENT
Wastewater Treatment Activated sludge
Civil & Chemical Engineering Department Graduation Project 2
TERTIARY TREATMENT METHODS
CTC 450 Review WW Systems Operations.
Typical Drainage system
DTF TREATMENT PROCESSES
Biological nutrient removal in municipal waste water treatment
Tertiary Treatment.
Assessment of MBR for Bacteria & Nitrogen Reduction
Advanced Wastewater Treatment
Presentation transcript:

Enhanced Biological Nitrogen Removal In PVA-Gel Based MBBR - A Novel Option To Save Dal Lake. J. Singh*, K.M.Gani*, N.K.Singh*, V. Rose**, A.A. Kazmi* * Department of Civil Engineering, Indian Institute of Technology, Roorkee , India ( **Kuraray India Private Limited, New Delhi (India) – MATERIAL AND METHODS  The treatment scheme consists of an aerobic tank for nitrification and organic removal, anoxic tank for denitrification and an additional aerobic tank for removal of external BOD (Fig. 1).  The bio carriers in each tank were spherical PVA gel beads with 10% filling fraction. Methanol was used as external carbon source in anoxic tank and the whole treatment was followed by chemical coagulation using Poly-Aluminum Chloride (PAC).  The adopted treatment scheme was a copy of existing MBBRs with the addition an anoxic reactor.  The pilot plant was optimized at four temperatures (25, 20, 15 and 6 o C), in order to evaluate treatment performance at all temperatures of the region. The authors would like to express appreciation for the support of the sponsors: Kuraray India Pvt. Ltd. RESULTS & DISCUSSION INTRODUCTION  Dal Lake is situated in the heart of Srinagar, India at an altitude of 1583m. The lake as one of the leading tourist attraction of the country is under high anthropogenic stress of nutrients since more than three decades. It not only receives storm water but also treated effluent from the sewage treatment plants located on its periphery.  In order to control eutrophication and further degradation of the lake, the Jammu & Kashmir State High Court imposed stringent treated effluent requirement, emphasizing higher degree organics, TSS and mainly nutrient removal.  Since, existing sewage treatment plants are found to be incapable of nitrogen removal, a pilot plant study is conducted on the actual sewage for enhanced organic, suspended solids and nutrient removal, in order to further upgrade existing Moving Bed Biofilm Reactor (MBBR) based sewage treatment plants. CONCLUSIONS  The ammonia removal in four phases was 91%, 92%, 88% and 85%.  Total nitrogen removal was maximum (87%) at a temperature of 25 o C and HRT of 32 hours.  Phosphorus removal efficiency was 83-87% in all phases.  The sludge flocs exhibited the presence of heterotroph filamentous bacteria. (Fig. 3)  The ammonia removal in four phases was 91%, 92%, 88% and 85%.  Total nitrogen removal was maximum (87%) at a temperature of 25 o C and HRT of 32 hours.  Phosphorus removal efficiency was 83-87% in all phases.  The sludge flocs exhibited the presence of heterotroph filamentous bacteria. (Fig. 3)  PVA gel based MBBR was evaluated as an alternate option for upgradation of MBBRs around periphery of Dal lake.  The characteristics of the effluent were almost in accordance with the regulations prescribed by respective state authorities.  From the results, it is concluded that the treatment scheme is a noble option to save dal lake from stresses of organics and nutrients especially during winters. Fig. 1. Actual Set up of pilot plant Fig. 2. The flow sheet for the pilot scale Fig. 3. SEM micrographs of Sludge Table 1. Characteristics of influent and effluent of pilot plant in various phases Fig 4. Variations in COD, BOD, NH 4 -N and TSS during the pilot scale study IWA Specialist Conference on Sustainable Wastewater Treatment and Resource Recovery, October, Kathmandu, Nepal Poster No For more information please contact:- Khalid Muzamil Gani, Parameter Phase 1234 Inlet (mg/L)Outlet (mg/L)Inlet (mg/L)Outlet (mg/L)Inlet (mg/L)Outlet (mg/L)Inlet (mg/L)Outlet (mg/L) COD 238 ± ± ± ± ± ± ± ± 9.9 BOD 121 ± ± ± ± ± ± ± ± 0.84 TSS 98± ± ± 243± ± 88.22± ± 2064 ± 2.9 VSS 45 ± 215 ± ± 11.12± ± ± ± ± 0.5 TP 5.89 ± ± ± ± ± ± ± ± 0.16 NH 4 + -N ± ± ± ± ± ± ± ± 1.7 NO 3 -N 2.25 ± ± ± ± ± ± ± ± 0.6