NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016.

Slides:



Advertisements
Similar presentations
Achieving the MDGs: RBA Training Workshop Module 6: Urban Development Investment Cluster May 9-12, 2005.
Advertisements

UNDP RBA MDG-Based National Development Planning Workshop MDG-Based Urban Development Strategy Gonzalo Pizarro UN Millennium Project February 27-March.
Food Parks Initiative FAO/AGS Presentation on the basic concepts in ‘Food Parks Initiative’ for discussion, Strategy with Rome- Based Food Agencies Organisation”
ELECTRONIC CONNECTIVITY KNOWLEDGE CONNECTIVITY PHYSICAL CONNECTIVITY Telecom Internet e-Governance Tele-medicine Tele-education Ring Road Rail Public Infrastructure.
Water Services Trust Fund Social Animators & Field Monitors Training Workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban.
Hybrid Community Bioenergy Solutions for Sustainable Rural Living Michèle Clarke University of Nottingham.
INTEGRATED PLANNING: THE LINKS BETWEEN URBAN WASTE MANAGEMENT, SANITATION AND ENERGY.
Master Plan of Electricity Supply for off-grid islands in Sundarbans Indradip Mitra November 2005.
Dr. Sunita Chitkara Deputy Director General Central Statistics Office India.
Smart Village Model Through Convergence In Catchment Area of The River Kshipra M. P. State Employment Guarantee Council Panchayat and Rural Development.
Rural Development : Perspective, Programmes and Experience
Water Services Trust Fund Social Animators & Field Monitors Training Workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
PROGRAMME FOR URBAN AMENITIES IN RURAL AREAS : PURA Physical Connectivity Railway Network Bus To Nearest City Transport Road / Rail connectivity Transport.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
An Introduction to Energy. Why do we care? 1. Fossil fuels are finite a fuel (as coal, oil, or natural gas) formed in the earth from plant or animal.
1 Union Middle school Re-look at our village with Analytical perspective Class Nine.
 Strategic Objective K.2: Integrate gender concerns and perspectives in policies and programmes for sustainable development.
AKSHAYA CHANGING LIVES THROUGH ICTs. MALAPPURAM- A PROFILE MOST POPULOUS DISTRICT IN KERALA-1/10TH 3 M; 6.5 L FAMILIES 3550 SQ.KM.
April 9, 2008 Kevin Huselid Brian Bell Water and Sanitation for Hope Integrated Academy Mulobere, Masaka, Uganda University of Minnesota Chapter.
1 VAISHALI ICAR research complex for eastern region Patna, Bihar India SITE PRESENTATION.
Achieving the MDGs: RBA Training Workshop Module 5: Rural Development Investment Cluster 9-12 May 2005.
A DISCUSSION AROUND POTENTIAL FOR DISTRICT SYSTEMS IN THE CITY OF CAPE TOWN Spatial Planning and Urban Design : Marco Geretto.
MoUD Center of Excellence: PPP initiatives in Water & Sanitation Analysis of City Corporate Plan: PPP-ability Criterion Matrix.
WELCOME TO A PRESENTATION ON URBAN PROFILE OF UDAIPUR NAGAR PANCHAYAT.
Grey Water In UK Buildings By Tom Bishop
Biomass Utilization for Energy Conversion Economic considerations Dr. Bernd Dous Ministry of Economy and Trade Hamburg.
LONG ISLAND SEWERS. WHAT ARE THE TWO TYPES OF SEWERS? SEWER PIPES AND STORM DRAINS.
ECLAC HANDBOOK FOR ESTIMATING EFFECTS OF DISASTERS1 HANDBOOK FOR ESTIMATING SOCIO-ECONOMIC AND ENVIRONMENTAL EFFECTS OF DISASTERS Economic Commission for.
Mapping Amenities constituting Quality Life Experience GOLA BLOCK- GUMLA (JHARKHAND)
2010 PHC NATIONAL PUBLICITY COMMITTEE SENSITIZATION WORKSHOP SEPTEMBER BASIC CONCEPTS, COVERAGE.
Harolds Hotel, Lahug, Cebu City September 26, 2013 ROLE OF LOCAL GOVERNMENT UNITS IN LOCALIZING NATIONAL LAWS (Promotion of Green Economic Development)
UNSD Water Data Collection Jeremy Webb United Nations Statistics Division.
C ONNECTION OF POPULATION TO PUBLIC WATER SUPPLY Jana Jankova Desk officer of Department of State Administration of Water Management and River Basin Ministry.
1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
SELF SUFFICIENT AND INCOME GENERATING SMART HOUSE
1 How a SEPA must be equipped and managed: contents of the e-learning training SEPA ‘Sustainable and equipped productive areas’ 5th Steering Committee.
SKILL COUNCIL for GREEN JOBS Promoted by Ministry of New and Renewable Energy (MNRE) and Confederation of Indian Industry (CII) An Overview of SCGJ.
Water management needs and options. Examples of priorities  Economic development?  Food security?  Poverty alleviation in towns and in rural areas?
4/1/16 Using Water Wisely. Wait… How much? Only 3% of Earth’s water is drinkable (fresh water) Of that 3%, 75% is frozen in icecaps/glaciers Yet, humans.
Regional Economic Advancement Project-Matale Financial Progress Project Components Home Link with ENRAP Regional Economic Advancement Project Matale, Sri.
Water Sector Trust Fund
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
India’s Energy need GW 300 GW
Goal 1. End poverty in all its forms everywhere
Collection and use of data on Water Abstraction and Use in Georgia Mariam Makarova, Head of Water Resources Management Division, Ministry of Environment.
Pondicherry - a Uniquely Open Economy
SOLID WASTE MANAGEMENT
Bill Griffith Alaska Department of Environmental Conservation
PURA CONCEPT - Economic Connectivity
UNSD Water Data Collection
ENGINES FOR GROWTH NATURAL RESOURCES HUMAN RESOURCES Technology
SDG goals Goal Activity Goal No.1 No Poverty:
Our experiences in Mission mode White Revolution – ANAND Experience
PURA ( PROVIDING URBAN AMENITIES IN RURAL AREAS ) SYSTEM
OVERVIEW & PROGRESS Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore.
PURA ( PROVIDING URBAN AMENITIES IN RURAL AREAS )
ENGINES FOR GROWTH NATURAL RESOURCES HUMAN RESOURCES Technology
Water Sector Trust Fund
Can Media be a partner in the mission of
Solar Energy – Power Supply
Food Security in Different Phases
The SWITCH Approach to Integrated Urban Water Management
Priorities of our Government
Renewable Energy Systems - Empowering Livelihoods
Food Security in Different Phases
Sanitation Study and Wastewater Network System AL Tayba Village
NEW INDIA 2022 INDIA 75 Department of Rural Development.
Presentation transcript:

NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016

Cluster Profiling Component Profile Step 3 b

Component Profiling Skill Development training Linked to Economic Activities 3 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1Average Income per capita 2Primary source of income 3Skills available- Handicraft/handloom/Industrial etc 4MSME clusters present (Y/N) 5If (Y), above then nos and type of MSME cluster 6Employment generated through 1 above 7Female to Male ratio of employment 8Female to Male ratio of vocational skill engagement 9Traditional/home based Industries present 10Identified needs for skill development 11Agencies involved in skill development/training Total Projected GP - 1GP - 2GP - 3GP - 4 1Projected no of households for Projected needs for skill development ( no of hoseholds)

Component Profiling Agri-services and Processing 4 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats ExistingGP - 1GP - 2GP - 3GP - 4 1Any Existing agri service centre (Y/N) 2If Y then issues/need for up-gradation 3Any agro-processing industries present (Y/N) 4If Y then details of the same – type-size, scale etc 5Presence of adequate storage & warehousing facilities 6Presence of cold storage facilties 7Predominant agricultural produce 8Issues related to optimum yield 9 Identified additional support infrastructure to improve agri-productivity. 10Presence of mandis/wholesale agri produce markets ( Nos and distance between these mandis)

Component Profiling Digital Amenities and Literacy 5 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP Any existing ICT enabled front end Common Service Centre (Y/N) 2If Y any up-gradation required 3 Connectivity under NOFN/Broad Band connectivity 4Gaps under 3 above ( coverage) 5Coverage under E- Kranti 6 % of households with digital connectivity 7 % of households with at-least one e literate person Total Projected GP - 1GP - 2GP - 3GP Projected no of households for Projected needs for digital literacy ( no of households)

Component Profiling 24x7 Piped Water Supply 6 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Source of water supply ( Ground/Surface) 2Any Treatment Plant facility- type and capacity Any problems with leakages/old piping systems 3Storage Reservoirs-nos and capacity 4Coverage of WS connection (piped) at household level 5No of stand posts and coverage of each stand post ( no of households) 6Per capita availability of drinking water supply 7No of hours of water supply 8Any metering systems available 9Quality of water supply 10Water supply systems of historical/religious significance Projected GP - 1GP - 2GP - 3GP - 4 1Projected no of households for Projected water demand for 2022 iProjected capacity of Treatment capacity IiProjected capacity of SR IiiNo of household connections IvProjected water supply network -distribution

Component Profiling Sanitation 7 ** Brief analysis and Issues may be included in a brief write up DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Coverage of households with Individual Toilets 2Any Open defecation 3Existing condition of the IHH Toilets 4Connection with septic tanks 5 Coverage with sewerage systems- type and condition 6 Any sewage treatment plant available-type and condition 7Any alternate systems of treatment being used 8Any recycling facilities available Projections GP - 1GP - 2GP - 3GP - 4 1Projected no of households for Requirement of HH Toilets Projected need for sewage network 4Projected need of Sewage Treatment Plant

Component Profiling Solid and Liquid Waste Management 8 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP Existing facilities for collection at the household level 2Any segregation done at the household level 3Frequency and mode of collection 4Existing facilities for disposal and treatment 5Type of treatment facility ( need in 2022) 6 Any non conventional/traditional methods/oganic (eg. vermi composting) of solid waste treatment 7Any recycling options/facilities 8 Waste disposal facilities for hazardous/industrial waste ** Brief analysis and Issues may be included in a brief write up

Component Profiling Access to Village Streets with Drains 9 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1Coverage of Village Streets 2 Type of village street Kutcha/Semi Pucca/Kutcha ( BT/Concrete/interlocking tiles/other) 3 Width of village streets-whether motorable or non motorable 4Pedestrian pathways available 5% of streets covered with drains 6Type of drains( covered /uncovered) 7Storm water disposal facilities ** Brief analysis and Issues may be included in a brief write up

Component Profiling Village Street Lights 10 DetailsGram Panchayats Existing GP - 1GP - 2GP - 3GP - 4 1No of street lights per km of street length 2Type of street light ( whether sodium vapour/LED) 3Any non conventional methods of street lighting 4No of non functional street lights to be replaced 4Electric Poles availability 4Coverage of households with electricity 5Use of non -conventional sources of electricity 6Potential for renewable energy usage ( wind/solar/mini-hydel) ** Brief analysis and Issues may be included in a brief write up

Component Profiling Health 11 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1Existing nos of sub centres/dispensaries. 2Infrastructure facilities of the sub centres 4Existing nos of maternity homes 5No of Primary Health Centres 6No of veterinary centres Projections GP - 1GP - 2GP - 3GP - 4 1Projected Population Requirement of sub centres Requirement of maternity homes Requirement of PHCs 5Requirement of veterinary centres-2022 ** Brief analysis and Issues may be included in a brief write up

Component Profiling Up gradation of primary, secondary and higher secondary schools 12 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1No of anganwadis/mini anganwadi centres 2No of Primary Schools 3No of senior secondary schools 4Any schools for physically challenged persons 5Existing condition of 1-4 6Up-gradation needs for 1-4 Projections GP - 1GP - 2GP - 3GP - 4Total 1Projected no of households for Projections for 1-4 above ** Brief analysis and Issues may be included in a brief write up

Component Profiling Inter village roads connectivity 13 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP Distance between GPs 2 % covered by BT roads- whether NH/SH/MDR/PMGSY 3Length of non connectivity between GPs 4Capacity of existing roads – no of vehicles 5Need for strengthening/widening of existing roads ** Brief analysis and Issues may be included in a brief write up

Component Profiling Public Transport 14 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP Public Transport facilities at household level viz. tempos/ rikshaws etc 2 Public Transport facilities at GP level- Bus stops/tempo stops/number of buses plying and frequency. 3 Public Transport at the cluster level- Bus Terminals/Local trains 4Improvement/Augmentation proposals by Government ** Brief analysis and Issues may be included in a brief write up

Component Profiling LPG Gas Connections 15 DetailsGram Panchayats Total Existing GP - 1GP - 2GP - 3GP - 4 1No of households with LPG connections 2No of LPG godowns 3 Projected no of LPG connections required for Projected no of LPG godowns for 2022 ** Brief analysis and Issues may be included in a brief write up

THANK YOU 16